FHWA Reports Road Construction Costs Decreased During First Quarter of 2000


American Government

FHWA Reports Road Construction Costs Decreased During First Quarter of 2000

Federal Highway Administration
May 30, 2000

FOR IMMEDIATE RELEASE
Tuesday, May 30, 2000
Contacts:
Karen Whitney, (202) 366-0660
Claretta Duren, (202) 366-4636
FHWA 38-00

The Federal Highway Administration (FHWA) today announced that highway construction costs decreased 4.2  percent in the first quarter of 2000 as compared to the fourth quarter of 1999 and 5.7 percent compared to the first quarter of 1999.

The first quarter results lowered the FHWA's composite index for highway 138.1 percent of the 1987 base index (1987 average costs equal 100 percent).

Decreases in the unit prices for bituminous concrete, structural concrete, structural steel, and Portland cement concrete lowered the index in the first quarter. There were increases in the unit prices for common excavation and reinforcing steel.

The three-quarter moving composite price index for the fourth quarter of 1999 – obtained by combining data for the last two quarters of 1999 with the first quarter of 2000 – decreased 1.1 percent from the previous three-quarter average.

 Trends in highway construction costs are measured by an index of average contract prices compiled from reports of state highway contract awards for federal-aid contracts greater than $500,000.  Since the enactment of the Intermodal Surface Transportation Efficiency Act of 1991, the index reflects federal-aid contracts on the National Highway System.

The composite price indices during the past two years and the percentage changes from the preceding quarter have been as follows: 

Quarter

 Year

Quarterly Price Index

Percentage Change

Three-quarter Moving Index*

Percentage Change

1st Quarter*

1998

119.6

--

124.6

--

2nd Quarter
1998 125.6 5.0 125.8 1.0

3rd Quarter

1998

136.8

8.9

130.6

3.8

4th Quarter

1998

131.4

-3.9

132.8

1.7

1st Quarter

1999

130.7

-0.5

134.4

1.2

2nd Quarter

1999

143.4

9.7

134.4

0.0

3rd Quarter

1999

131.8

-8.1

138.7

3.2

4th Quarter

1999

144.

9.3

137.2

-1.1

1st Quarter

2000

138.1

-4.2

--

--

*For the three-quarter moving index, these are the middle quarters of the three-quarter periods.

 

The price levels of the component items of the quarterly index in the 1st quarter of 2000, the previous quarter, and the same quarter a year ago, and the corresponding percentage changes, are shown in the following table:

 

Price Index
1987 = 100

Percentage change this quarter
(1st quarter, 2000) from:

Component

1st Quarter 2000

4th Quarter 1999

1st Quarter 1999

4th Quarter 1999

1st Quarter 1999

Excavation

111.8

109.3

113.5

2.3

-1.5

Portland cement concrete

170.9

190.3

149.9

-10.2

14.0

Bituminous concrete

132.5

133.9

120.7

-1.0

9.8

Composite surfacing

145.1

152.4

130.3

-4.8

11.4

Reinforcing steel

133.9

127.2

123.2

5.3

8.7

Structural steel

121.9

147.3

139.1

-17.2

-12.4

Structural concrete

151.3

155.2

140.2

-2.5

7.9

Composite structures

140.6

148.3

136.9

-5.2

2.7

Composite price index

138.1

144.1

130.7

-4.2

5.7

 

The price levels of the current component items of the three-quarter moving index in the 4th quarter of 1999, the previous quarter, and the same quarter a year ago, and the corresponding percentage changes, are shown in the following table:

 

 

Three-Quarter Moving Price Index
1987 = 100

Percentage Change This Quarter
(4th Quarter 1999) from:

Component

4th Quarter 1999

3rd Quarter 1999

4th Quarter 1998

3rd Quarter 1999

4th Quarter 1998

Excavation

114.7

124.2

121.7

-7.6

-5.8

Portland cement concrete

160.2

163.9

159.9

-2.3

0.2

Bituminous concrete

134.0

134.1

119.4

-0.1

12.2

Composite surfacing

142.6

143.9

132.7

-0.9

7.5

Reinforcing steel

130.1

126.8

118.1

2.6

10.2

Structural steel

132.7

138.0

133.3

-3.8

-0.5

Structural concrete

146.1

142.9

143.8

2.2

1.6

Composite structures

139.8

138.9

136.6

0.6

2.3

Composite price index

137.2

138.7

132.8

-1.1

3.3

 

The U.S. average contract unit prices for the index items during the various periods shown are:                                                                                     

 

Individual Quarters

Three-Quarters

Component

Unit

4th Quarter 1999

1st Quarter 2000

3rd Quarter 1999*

4th Quarter 1999**

Excavation

Cubic yard

$2.65

$2.71

$3.01

$2.78

Portland cement concrete

Square yard***

28.04

25.17

24.16

23.60

Bituminous concrete

Ton

33.00

32.65

33.04

33.04

Reinforcing steel

Pound

0.568

0.590

0.559

0.573

Structural steel

Pound

1.304

1.079

1.222

1.175

Structural concrete

Cubic yard

373.81

364.40

344.14

351.75

*Weighted average unit prices for the last three quarters of 1999.

**Weighted average unit prices for the last two quarters of 1999 and the first quarter of 2000.

***Prices for Portland cement concrete surfacing reflect adjustments to a standard 9-inch thickness and do not include costs for reinforcing steel and joints

 

###




The Crittenden Automotive Library