Surface Transportation Project Delivery Program; TxDOT Audit Report |
|---|
|
Gregory G. Nadeau
Federal Highway Administration
16 August 2016
[Federal Register Volume 81, Number 158 (Tuesday, August 16, 2016)]
[Notices]
[Pages 54648-54658]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-19476]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[FHWA Docket No. FHWA-2016-0003]
Surface Transportation Project Delivery Program; TxDOT Audit
Report
AGENCY: Federal Highway Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Surface Transportation Project Delivery Program (23 U.S.C.
327) allows a State to assume FHWA's environmental responsibilities for
review, consultation, and compliance for Federal-aid highway projects.
When a State assumes these Federal responsibilities, the State becomes
solely responsible and liable for carrying out the responsibilities it
has assumed, in lieu of FHWA. Prior to the Fixing America's Surface
Transportation (FAST) Act of 2015, the program required semiannual
audits during each of the first 2 years of State participation to
ensure compliance by each State participating in the program. This
notice presents the findings of the second audit report for the Texas
Department of Transportation's (TxDOT) participation in accordance to
these pre-FAST Act requirements.
FOR FURTHER INFORMATION CONTACT: Dr. Owen Lindauer, Office of Project
Development and Environmental Review, (202) 366-2655,
owen.lindauer@dot.gov, or Mr. Alan Strasser, Office of the Chief
Counsel, (202) 366-1373, alan.strasser@dot.gov, Federal Highway
Administration, Department of Transportation, 1200 New Jersey Avenue
SE., Washington, DC 20590. Office hours are from 8:00 a.m. to 4:30
p.m., e.t., Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this notice may be downloaded from the
specific docket page at www.regulations.gov.
Background
The Surface Transportation Project Delivery Program (or NEPA
Assignment Program) allows a State to assume FHWA's environmental
responsibilities for review, consultation, and compliance for Federal-
aid highway projects (23 U.S.C. 327). When a State assumes these
Federal responsibilities, the State becomes solely responsible and
liable for carrying out the responsibilities it has assumed, in lieu of
FHWA. The TxDOT published its application for assumption under the
National Environmental Policy Act (NEPA) Assignment Program on March
14, 2014, at Texas Register 39(11): 1992, and made it available for
public comment for 30 days. After considering public comments, TxDOT
submitted its application to FHWA on May 29, 2014. The application
served as the basis for developing the Memorandum of Understanding
(MOU) that identifies the responsibilities and obligations TxDOT would
assume. The FHWA published a notice of the draft of the MOU in the
Federal Register on October 10, 2014, at 79 FR 61370 with a 30-day
comment period to solicit the views of the public and Federal agencies.
After the close of the comment period FHWA and TxDOT considered
comments and proceeded to execute the MOU. Since December 16, 2014,
TxDOT has assumed FHWA's responsibilities under NEPA, and the
responsibilities for the NEPA-related Federal environmental laws.
Prior to December 4, 2015, 23 U.S.C. 327(g) required the Secretary
to conduct semiannual audits during each of the first 2 years of State
participation, and annual audits during each subsequent year of State
participation to ensure compliance by each State participating in the
program. The results of each audit were required to be presented in the
form of an audit report and be made available for public comment. On
December 4, 2015, the President signed into law the FAST Act (Pub. L.
114-94, 129 Stat. 1312 (2015)). Section 1308 of the FAST Act amended
the audit provisions by limiting the number of audits to one audit each
year during the first 4 years of a State's participation. However, FHWA
had already conducted the second audit in September 2015 regarding
TxDOT's program participation. The FHWA received one response from the
TxDOT as a result of the public notice of the draft report and has
considered the TxDOT comments in finalizing this audit report. The
TxDOT's comments reflect actions it has taken in response to the
report's observations. Only one comment has resulted in a non-
substantial change in this report. This notice provides the final draft
of the report for second audit for TxDOT conducted prior to the FAST
Act.
Authority: Section 1313 of Public Law 112-141; Section 6005 of
Public Law 109-59; 23 U.S.C. 327; 49 CFR 1.48.
Issued on: August 8, 2016.
Gregory G. Nadeau,
Administrator, Federal Highway Administration.
Surface Transportation Project Delivery Program
[[Page 54649]]
FHWA Audit #2 of the Texas Department of Transportation
June 16, 2015 through December 16, 2015
Executive Summary
This report summarizes the results of Audit #2 of the performance
by the Texas Department of Transportation (TxDOT) regarding its
assumption of responsibilities and obligations, as assigned by Federal
Highway Administration (FHWA) under a memorandum of understanding (MOU)
whose term began on December 16, 2014. From that date, TxDOT assumed
FHWA National Environmental Policy Act (NEPA) responsibilities and
liabilities for the environmental review and compliance for highway
projects that require a Federal action in Texas (NEPA Assignment
Program). The FHWA's role in the NEPA Assignment Program in Texas
includes program review through audits, as specified in 23 U.S.C. 327
and in the MOU. The status of the Audit #1 observations (including any
implemented corrective actions) is detailed at the end of this report.
The FHWA Audit #2 team (team) was formed in June 2015 and met
regularly to prepare for the on-site portion of the audit. Prior to the
on-site visit, the team: (1) performed reviews of TxDOT project file
NEPA documentation in TxDOT's Environmental Compliance Oversight System
(ECOS), (2) examined the TxDOT pre-Audit #2 information request
responses, and (3) developed interview questions. The on-site portion
of this audit, comprised of TxDOT and other agency interviews, was
conducted September 8-9, 2015, and September 20-25, 2015.
The TxDOT continues to make progress developing, revising, and
implementing procedures and processes required to implement the NEPA
Assignment Program. Overall, the team found evidence that TxDOT is
committed to establishing a successful program. This report summarizes
the team's assessment of the current status of several aspects of the
NEPA Assignment Program, including successful practices and 17 total
observations that represent opportunities for TxDOT to improve its
program. The team identified three non-compliance observations that
TxDOT will need to address as corrective actions in its next self-
assessment and subsequent report.
While TxDOT has continued to make progress toward meeting all the
responsibilities it has assumed in accordance with the MOU, the
recurring non-compliance observations require corrective action by
TxDOT. By taking corrective action and considering changes based on the
observations in this report, TxDOT will continue to move the program
toward success.
Background
The Surface Transportation Project Delivery Program allows a State
to assume FHWA's environmental responsibilities for review,
consultation, and compliance for Federal highway projects. This program
is codified at 23 U.S.C. 327. When a State assumes these Federal
responsibilities, the State becomes solely responsible and liable for
carrying out the obligations it has assumed, in lieu of FHWA.
The State of Texas was assigned the responsibility for making
project NEPA and other related environmental decisions for highway
projects on December 16, 2014. In enacting Texas Transportation Code,
Sec. 201.6035, the State has waived its sovereign immunity under the
11th Amendment of the U.S. Constitution and consents to defend any
actions brought by its citizens for NEPA decisions it has made in
Federal court.
The FHWA responsibilities assigned to TxDOT are varied and tied to
project level decisionmaking. These laws include, but are not limited
to, the Endangered Species Act (ESA), Section 7 consultations with the
U.S. Fish and Wildlife Service (USFWS) and the National Oceanic and
Atmospheric Administration National Marine Fisheries Service, and
Section 106 consultations regarding impacts to historic properties. Two
Federal responsibilities were not assigned to TxDOT and remain with
FHWA: (1) making project-level conformity determinations under the
Federal Clean Air Act and (2) conducting government-to-government
consultation with federally recognized Indian tribes.
Prior to December 4, 2015, FHWA was required to conduct semiannual
audits during each of the first 2 years of State participation in the
program and audits annually for 2 subsequent years as part of FHWA's
oversight responsibility for the NEPA Assignment Program. The reviews
assess a State's compliance with the provisions of the MOU and all
applicable Federal laws and policies. They also are used: to evaluate a
State's progress toward achieving its performance measures as specified
in the MOU; to evaluate the success of the NEPA Assignment Program; and
to inform the administration of the NEPA Assignment Program. On
December 4, 2015, the President signed into law the Fixing America's
Surface Transportation (FAST) Act of 2015, which amended the audit
provisions of the program by changing the frequency to one audit per
year during the first 4 years of the State's participation. However,
this audit was conducted prior to the passage of the FAST Act, and this
report is being prepared and made available under the audit provisions
as they existed prior to the passage of the FAST Act. This report
summarizes the results of the second audit, and updates the reader on
the status and corrective actions for the results of the first audit.
Scope and Methodology
The overall scope of this audit review is defined both in statute
(23 U.S.C. 327) and the MOU (Part 11). An audit generally is defined as
an official and careful examination and verification of accounts and
records, especially of financial accounts, by an independent unbiased
body. With regard to accounts or financial records, audits may follow a
prescribed process or methodology, and be conducted by ``auditors'' who
have special training in those processes or methods. The FHWA considers
this review to meet the definition of an audit because it is an
unbiased, independent, official, and careful examination and
verification of records and information about TxDOT's assumption of
environmental responsibilities. The team that conducted this audit has
completed special training in audit processes and methods.
The diverse composition of the team, the process of developing the
review report, and publishing it in the Federal Register help ensure an
unbiased audit process and establish the audit as an official action
taken by FHWA. The team for Audit #2 included NEPA subject matter
experts from the FHWA Texas Division Office and FHWA offices in
Washington, DC, Atlanta, GA, Columbus, OH, and Salt Lake City, UT. In
addition, the team included an FHWA Professional Development Program
trainee from the Texas Division office and one individual from FHWA's
Program Management Improvement Team who provided technical assistance
in conducting reviews.
Audits, as stated in the MOU (Parts 11.1.1 and 11.1.5), are the
primary mechanism used by FHWA to oversee TxDOT's compliance with the
MOU, ensure compliance with applicable Federal laws and policies,
evaluate TxDOT's progress toward achieving the performance measures
identified in the MOU (Part 10.2), and collect information needed for
the Secretary's annual report to Congress. These audits also must be
designed and conducted to evaluate TxDOT's technical competency and
organizational capacity, adequacy of the financial resources committed
by TxDOT to administer the
[[Page 54650]]
responsibilities assumed, quality assurance/quality control (QA/QC)
process, attainment of performance measures, compliance with the MOU
requirements, and compliance with applicable laws and policies in
administering the responsibilities assumed. The four performance
measures identified in the MOU are: (1) compliance with NEPA and other
Federal environmental statutes and regulations, (2) QC and QA for NEPA
decisions, (3) relationships with agencies and the general public, and
(4) increased efficiency, timeliness, in the completion of the NEPA
process.
The scope of this audit included reviewing the processes and
procedures used by TxDOT to reach and document project decisions. The
team conducted a careful examination of highway project files and
verified information on the TxDOT NEPA Assignment Program through
inspection of other records and through interviews of TxDOT and other
staff. The team gathered information that served as the basis for this
audit from three primary sources: (1) TxDOT's response to a pre-Audit
#2 information request, (2) a review of a random sample of project
files with approval dates subsequent to the execution of the MOU, and
(3) interviews with TxDOT, the U.S. Army Corps of Engineers (USACE),
and the U.S. Coast Guard (USCG) staff. The TxDOT provided information
in response to FHWA questions and requests for all relevant reference
material. That material covered the following six topics: (1) program
management, (2) documentation and records management, (3) QA/QC, (4)
legal sufficiency review, (5) performance measurement, and (6)
training. The team subdivided into working groups that focused on each
of the six topics.
The intent of the review was to check that TxDOT has the proper
procedures in place to implement the MOU responsibilities assumed,
ensure that the staff is aware of those procedures, and that staff
implement the procedures appropriately to achieve NEPA compliance. The
review is not intended to evaluate project-specific decisions, or to
second guess those decisions, as these decisions are the sole
responsibility of TxDOT.
The team defined the timeframe for highway project environmental
approvals subject to this second audit to be between March 2015 and
June 2015. The focus on the second review included the 3 to 4 months
after FHWA's audit #1 highway project file review concluded. The second
audit intended to: (1) evaluate whether TxDOT's NEPA decisionmaking and
other actions comply with all the responsibilities it assumed in the
MOU, and (2) determine the current status of observations in the Audit
#1 report and required corrective actions (see summary at end of this
report). The team established a population of 598 projects subject to
review based on lists of NEPA approvals (certified compliant by TxDOT
as required in MOU Part 8.7.1) reported monthly by TxDOT. The NEPA
approvals included categorical exclusion (CE) determinations, 47 other
types of environmental approvals including approvals to circulate an
environmental assessment (EA), findings of no significant impacts
(FONSI), re-evaluations of EAs, Section 4(f) decisions, approvals of a
draft environmental impact statement (EIS), and a record of decision
(ROD). In order to attain a sample with a 95 percent confidence
interval, the team randomly selected 83 CE projects. In addition, the
team reviewed project files for all 47 approvals that were not CEs. The
sample reviewed by the team was 130 approval actions.
The interviews conducted by the team focused on TxDOT's leadership
and staff at Environmental Affairs Division (ENV) Headquarters in
Austin and nine TxDOT Districts. To complete the interviews of District
staff, the team divided into three groups of four to conduct face-to-
face interviews at TxDOT Districts in Dallas, Paris, Tyler, Lubbock,
Childress, Amarillo, Houston, Beaumont, and Bryan. With these
interviews completed, FHWA has interviewed staff from 60 percent (15 of
25) of the TxDOT District offices. The FHWA anticipates interviewing
staff from the remaining TxDOT District offices over the next year.
Overall Audit Opinion
The team recognizes that TxDOT is still implementing changes to
address and improve its NEPA Assignment Program and that its programs,
policies, and procedures may need revision. The TxDOT's efforts are
appropriately focused on establishing and refining policies and
procedures (especially in regards to the non-compliance observations
made by FHWA), training staff, assigning and clarifying changed roles
and responsibilities, and monitoring its compliance with assumed
responsibilities. The team has determined that TxDOT continues to make
reasonable progress despite some noted delays (pending ECOS upgrades)
as the program matures beyond the start-up phase of NEPA Assignment
operations. In addition, the team believes TxDOT is committed to
establishing a successful program. The team's analysis of project file
documentation and interview information identified several non-
compliance observations, and several other observations including
evidence of good practice. One non-compliance observation is recurrent
from Audit #1, relating to ``conditional clearances,'' that appears to
reflect a misunderstanding on the part of TxDOT on when and whether
information at hand is sufficient to support a NEPA decision that
complies with the requirements of the MOU. This is a point of concern
for FHWA and if necessary, this issue will be a focus of future audits.
The TxDOT staff and management have engaged FHWA and have received
constructive feedback from the team to revise TxDOT's standard
operating procedures. By considering and acting upon the observations
contained in this report, TxDOT should continue to improve upon
carrying out its assigned responsibilities to ensure the success of its
NEPA Assignment Program.
Non-Compliance Observations
AUDIT #2
Non-compliance observations are instances where the team found the
State was out of compliance or deficient with regard to a Federal
regulation, statute, guidance, policy, or the terms of the MOU
(including State procedures for compliance with the NEPA process). Such
observations may also include instances where the State has failed to
maintain adequate personnel and/or financial resources to carry out the
responsibilities assumed. Other observations that suggest a persistent
failure to adequately consult, coordinate, or take into account the
concerns of other Federal, State, tribal, or local agencies with
oversight, consultation, or coordination responsibilities could be non-
compliant. The FHWA expects TxDOT to develop and implement corrective
actions to address all non-compliance observations as soon as possible.
The TxDOT has already informed the team it is implementing some
recommendations made by FHWA to address non-compliance and other
observations. The FHWA will conduct follow up reviews of the non-
compliance observations as part of Audit #3, and if necessary, future
audits.
The MOU (Part 3.1.1) states ``pursuant to 23 U.S.C. 327(a)(2)(A),
on the Effective Date, FHWA assigns, and TxDOT assumes, subject to the
terms and conditions set forth in 23 U.S.C. 327 and this MOU, all of
the DOT Secretary's responsibilities for
[[Page 54651]]
compliance with the National Environmental Policy Act of 1969 (NEPA),
42 U.S.C. 4321 et seq. with respect to the highway projects specified
under subpart 3.3. This includes statutory provisions, regulations,
policies, and guidance related to the implementation of NEPA for
Federal highway projects such as 23 U.S.C. 139, 40 CFR parts 1500-1508,
DOT Order 5610.1C, and 23 CFR part 771 as applicable.'' Also, the
performance measure in MOU Part 10.2.1(A) for compliance with NEPA and
other Federal environmental statutes and regulations commits TxDOT to
maintaining documented compliance with requirements of all applicable
statutes, regulations, procedures, and processes set forth in the MOU.
The following non-compliance observations were found by the team based
on documentation (or lack thereof) in project files and other
documentation.
Audit #2 Non-Compliance Observation #1
Non-compliance Observation #1 is an instance (1 out of 130 actions
reviewed) where TxDOT made a CE determination for a project before all
regulatory criteria for a CE determination were met. The TxDOT followed
a State procedure relating to the NEPA approval subject to
``conditional clearances'' that allowed the project to proceed to
construction. Audit #1 Non-compliance Observation #2 also was an
instance where a CE determination was made by TxDOT staff before all
environmental requirements had been satisfied (i.e., project level air
quality conformity and listing in the Statewide Transportation
Improvement Program (STIP)) following the same TxDOT procedure.
Discovery of this second instance of non-compliance tied to conditional
clearance approvals triggered additional requests for information by
the team and gathering information through informal interviews.
The Non-compliance Observation was that an ECOS project record
showed that a TxDOT decisionmaker made a CE determination decision
before the consultation for the project was completed. The completion
of the consultation would have confirmed that a required constraint for
the CE was met. This instance involved the determination of whether a
project qualified for CE (c)(26). The FHWA's regulation at 23 CFR
771.117(c)(26) restricts the use of the CE to projects that meet all
the constraints in 23 CFR 771.117(e). The constraint in 23 CFR
771.117(e)(3) prohibits the use of the CE if it involves a finding of
``adverse effect'' to a historic property or the use of a resource
protected under Section 4(f), except for actions resulting in de
minimis impacts. The ECOS record shows that at the time of the CE
determination, these impacts were presumed, but consultation was not
yet initiated in writing nor documented as completed such that the
application of that CE could be justified. Later in time, after the CE
determination was used to allow the project to proceed to a point where
TxDOT made a request to FHWA to proceed to construction with Federal
funding, the project record contained Texas Historical Commission (THC)
concurrence that the effect was not adverse, and that a de minimis
impact determination was supported. The TxDOT should not have applied a
CE to a project before confirming that all conditions and constraints
for use of that CE were met. By proceeding in this manner, TxDOT has
not complied with the requirements for use of that CE, as specified in
regulation. Also, the actions taken by TxDOT that lead to the
''conditional clearance'' do not comply with FHWA's Section 4(f)
regulation, 23 CFR 774, where the CE determination was made when
outcome of the Section 4(f) impact was not determined.
At the team's request for additional information on projects
processed with ``conditional clearances,'' TxDOT provided a list of 18
projects that included the non-compliant project identified in Audit #1
and described above. Eight project files showed documentation that a CE
determination was made before the period for tribal consultation was
complete. The TxDOT, FHWA, and Indian Tribes with an interest in Texas
have executed programmatic agreements that define for which projects
TxDOT would consult and the manner of consultation. Those agreements
commit TxDOT to send information to a Tribe and allow for a 30-day
period for the Tribe to respond. If the Tribe does not respond after
the 30 days, TxDOT may proceed to the next step of the process. These
agreements commit TxDOT and FHWA to a manner of consultation that was
not followed for eight projects. The TxDOT's assumption of FHWA's NEPA
responsibilities does not permit TxDOT to disregard commitments it has
made (along with FHWA) to complete tribal consultation before moving to
the next step (making a CE determination). These actions are a
violation of MOU Part 5.1.1 where TxDOT is subject to the same
procedural and substantive requirements in interagency agreements, such
as programmatic agreements. Additionally, TxDOT's completion of NEPA
decisionmaking prior to completing tribal consultation violates MOU
Part 7.2.1 where TxDOT has committed to ensure that it has processes
and procedures in place that provide for proactive and timely
consultation to carry out responsibilities assumed under the MOU.
The TxDOT has a Standard Operating Procedure (SOP) for issuing a
Letter of Authority (LOA) dated April 1, 2015, that enables the project
to proceed to the next step in project development after a
decisionmaker has made a NEPA decision based on incomplete information.
Issuance of a LOA allows a project to proceed to the bidding process.
For the 18 projects in the list provided, TxDOT certified to FHWA that
the project's NEPA requirements were satisfied. The TxDOT has noted in
the project record that the project was ``conditionally cleared'' for
letting. Upon review, the team identified 11 projects of the 18
reviewed that did violate MOU Part 8.7.1 because the NEPA certification
included projects that either did not conform to required conditions to
apply CEs or did not complete required consultation requirements. Also,
TxDOT's SOP for issuing a LOA does not comply with MOU Part 5.2.1 in
that TxDOT's procedures did not result in compliance with Federal
regulations. The remaining 7 projects on the list of 18 ``conditional
clearance'' projects advanced by TxDOT did not indicate an instance of
an unjustified NEPA approval, but rather were for actions that occurred
post-NEPA approval (e.g., 404 permit issuance, Interstate Access
Justification, and right-of-way (ROW) purchase).
As a result, FHWA has asked that TxDOT immediately refrain from
issuing LOAs based on ``conditional clearances.'' The TxDOT has begun
the process of revising the subject SOP. The FHWA will review the SOP
to ensure that it satisfactorily complies with FHWA policy and the MOU.
In addition, FHWA has requested that TxDOT report any projects that use
the revised SOP to FHWA in advance of FHWA project authorization until
further notice.
Audit #2 Non-Compliance Observation #2
Two projects reviewed by the team were in error regarding NEPA
decision reporting. The MOU Part 8.2.6 requires the listing of any
approvals and decisions made. One CE determination was reported to FHWA
as an action that would utilize less than $5 million of Federal funds
(CE (c)(23)) where the project file listed the CE determination for an
action that would take place
[[Page 54652]]
entirely within the existing operational ROW (CE (c)(22)). A second
project was correctly reported on the monthly list, but a review of the
project file lacked documentation for this determination. Even though
these may result from data entry errors, TxDOT should make every effort
to ensure the decisions it reports monthly are accurate and project
files are complete.
Audit #2 Non-Compliance Observation #3
Twelve project file records were missing information that appeared
to be out of compliance with TxDOT's procedures or documentation
policy. One project's CE Determination Form did not identify the
approver's title. Another project file lacked the Public Involvement
summary. Nine project files lacked records, or included forms that
lacked signatures where TxDOT procedures indicated that signatures were
required. These included signatures on a Biological Evaluation form,
Project Coordination Request form, and a Public Hearing Certification.
One project file noted a public involvement process, but the event
lacked documentation on what was presented. The implication of the
TxDOT procedure is that the signature or information on the form is
part of the review and approval of the report or form. Project files
with missing information may suggest that a NEPA decision was based on
incomplete or ambiguous information. The TxDOT has informed FHWA that
it will review the files for these projects and take corrective action.
Observations and Successful Practices
This section summarizes the team's observations about issues or
practices that TxDOT may want to consider as areas to improve and
practices the team believes are successful that TxDOT may want to
continue or expand in some manner. Further information on these
observations and practices is contained in the following subsections
that address the six topic areas identified in FHWA's team charter and
work plan to perform this audit.
Throughout the following subsections, the team lists 14 remaining
observations that FHWA urges TxDOT to act upon in order to make
improvements. The FHWA's suggested methods of action include:
corrective action, targeted training, revising procedures, continued
self-assessment, or some other means. The team acknowledges that, by
sharing this draft audit report with TxDOT, TxDOT has the opportunity
to begin the process of implementing actions to address the
observations to improve its program prior to the publication of this
report. The FHWA will consider the status of these observations as part
of the scope of Audit #3. The team will also include a summary
discussion that describes progress since the last audit in the Audit #3
report.
1. Program Management
Successful Practices
The team recognized four successful program management practices.
First, it was evident through interviews that TxDOT has employed many
highly qualified staff for its program. Second, the team saw evidence
of strong communication between TxDOT's ENV and District staff with
regard to explaining roles and responsibilities associated with
implementation of the MOU for NEPA Assignment. Third, based on the
response to the pre-Audit #2 information request and interview
questions, the team recognized TxDOT ENV's efforts to develop and
update procedures, guidance, and tools as necessary or required to
assist Districts in meeting requirements of the MOU. Finally, District
staff understands and takes pride in and ownership of their CE
determinations. The ENV likewise takes pride in their responsibility
for EA and EIS decisionmaking and oversight for the NEPA Assignment
Program.
In addition, the team found evidence of six successful program
management practices through information provided by TxDOT and through
interviews. The team recognizes the TxDOT project Core Team concept,
which provides joint ENV and District peer reviews for EAs and EISs as
a good example of TxDOT utilizing its existing staff to analyze NEPA
documents and correct compliance issues on higher level of NEPA
documentation and procedures before project approval. Many Districts
appreciate the efforts of and results from the project Core Team and
credit them for assuring their projects are compliant.
The ``NEPA Chat'' continues to be a notable example of TxDOT's
effort to achieve a compliant NEPA Assignment Program with enhanced
communication among TxDOT environmental staff statewide. The NEPA Chat,
led by ENV, provides a platform for complex issues to be discussed
openly, and for Districts to learn about statewide NEPA Assignment
Program issues, and new policies and procedures. To date, the NEPA Chat
has proven to be an effective vehicle to disseminate relevant NEPA
information quickly and selectively to the TxDOT District Environmental
Coordinators.
Also, based on interviews and the response to the pre-audit
information request, almost all of the ENV and District staff feel
there is sufficient staff to deliver a successful NEPA Assignment
Program at the ENV and District level. This is further supported by
ENV's willingness to shift responsibilities to better align with the
needs of the NEPA Assignment Program. After interviewing the various
Districts, they indicated that ENV is available to assist the Districts
whenever they need help.
The ENV Self-Assessment Branch (SAB) fosters regular and productive
communication with District staff after environmental decisions are
made. The SAB staff prepares and transmits a summary of the results of
their reviews of project documentation, both positive and negative, and
follows up with the District Environmental Coordinator responsible for
the project via telephone. They provided this feedback within 2 weeks
of their review, which resulted in early awareness of issues and
corrective action, where necessary, and positive feedback.
The refinement of the pilot ``Risk Assessment'' tool (a ``smart pdf
form'') for environmental documents is a successful, but optional,
procedure that may become part of ECOS during the scheduled upgrades.
Based on the team's interviews, when District staff use the form, they
are better able to understand the resources to be considered, what
resources should receive further analysis, and the resulting output
serves as documentation for District decisions. Even though this tool
is not yet currently integrated within ECOS, it can be uploaded when
used.
The TxDOT noted that it had recently developed a QA/QC Procedures
for Environmental Documents Handbook (March 2015), and it is used by
the project Core Team to develop EA and EIS documents. Through TxDOT's
response to pre-Audit #2 questions and through interviews with various
staff, TxDOT has continued to demonstrate that it has provided a good
base of tools, guidance, and procedures with associated and timely
updates to assist in meeting the terms of the MOU and still takes pride
in exercising its assumed responsibilities.
The team considers three observations sufficiently important to
note below. The FHWA urges TxDOT to consider ongoing and/or additional
improvements or corrective actions to project management in its NEPA
Assignment Program to address these observations.
AUDIT #2 Observations
[[Page 54653]]
Audit #2 Observation #1
Based on interviews with the USACE and USCG, FHWA would like to
draw TxDOT's attention to several items. The team found that USCG had
multiple ENV and District points of contact and preferred to deal with
only one ENV point of contact at TxDOT. A single point of contact was
the practice prior to the NEPA Assignment Program when issues needed to
be elevated. The TxDOT has indicated that it identified a point of
contact for USCG in August of this year, but will follow up in writing.
The USACE noted that with the final rule the USACE opinion may change
with regard to how it conducts its own regulatory process. This may
prove to be problematic for applicants like TxDOT. Generally, it is
important for TxDOT to maintain and strengthen relationships with
Federal agencies including the State Historic Preservation Officer that
processes Section 106 actions. This may be considered critical under
NEPA Assignment as TxDOT is acting as a Federal agency.
Audit #2 Observation #2
The team found in a legacy project (i.e., a project that began with
FHWA as the lead agency and was transferred to be TxDOT-led after NEPA
Program Assignment) that an ESA ``no effect'' determination was made by
TxDOT to support a FONSI. Previously, when acting as the lead agency,
FHWA had requested that TxDOT resolve issues identified in the USFWS
correspondence for the project. In this instance, the project record
initially reflects a ``may affect'' determination by FHWA that later
changed to a ``no effect'' determination by TxDOT. The team was unable
to find documentation in the project file to justify why such a change
occurred. The team is currently working with TxDOT to review the
process by which TxDOT makes ``no effect'' determinations for ESA. If
concerns remain after this collaboration, FHWA may invite our USFWS
liaison to review this issue in more depth as part of Audit #3.
Audit #2 Observation #3
One project file contained information about an 8-mile detour
categorized as not a ``major traffic disruption.'' An interviewee at a
different District identified what they considered a different standard
(i.e., 2-mile detour) for a ``major traffic disruption.'' These
observations suggest TxDOT's approach to defining 23 CFR 771.117(e)(4)
for major traffic disruption may be inconsistent. The FHWA recognizes
that the context of when a disruption is considered to be ``major'' is
important and may depend on local conditions. The FHWA urges TxDOT to
develop guidance and a set of examples for rural, urban, and
metropolitan Districts to align when major traffic disruption occurs.
2. Documentation and Records Management
The team relied on information in ECOS, TxDOT's official file of
record, to evaluate project documentation and records management. The
ECOS is a tool for information records, management, and disclosure
within TxDOT District Offices, between Districts and ENV, and between
TxDOT and the public. The strength of ECOS is its potential for
adaptability and flexibility. The challenge for TxDOT is to maintain
and update the ECOS operating protocols (for consistency of use and
document/data location) and to educate its users on updates in a timely
manner.
Successful Practices
A number of best practices demonstrated by TxDOT were evident as a
result of the documentation and records management review. The ECOS has
demonstrated system-wide improvements in usage by Districts since Audit
#1, most notably in the areas of download speed and interface. The ECOS
has improved in areas of connectivity and speed, and technical support
for ECOS is rated as being very high and responsive. The team
recognizes the need for continuous updates and maintenance for the ECOS
system and ENV's upcoming plans for additional NEPA compliance and
documentation related improvements in five phases. The team also
recognized that TxDOT Districts are making good use of the Project Risk
Assessment Forms to Develop Project Scope and help guide the
environmental process.
Based on examination of the 130 sample files reviewed, the team
identified five general observations that are mostly issues where
record keeping and documentation could be improved or clarified. The
team used a documentation checklist to verify the presence of
information required by regulation and review the files of the 130
sampled projects.
Audit #2 Observation #4
One project shows a NEPA clearance date that occurs after the LOA
clearance date. The TxDOT has indicated that this was a data entry
error that was preserved ``in order to understand the progression of
project development.'' The NEPA clearance must occur before a date of
LOA clearance according to TxDOT process.
During the interviews, the team learned that ECOS files may be
deleted by their author and leave no trace of that deletion in ECOS. In
addition, the team learned through interviews that deleted files may
not be recovered. The FHWA is concerned about this lacking
functionality and urges TxDOT to consider that if decisional
information can be deleted, especially if the deletion occurs after the
NEPA decision document is signed, the project record would not support
the decisions made.
Audit #2 Observation #5
The team reviewed files for one project where the NEPA decision may
be an example of a potential inconsistency in NEPA document content for
a single project. The scope in the EA document described both a road
widening with bridge replacement and widening without bridge
replacement. The FONSI document project scope was described as roadway
widening, the file documentation was unclear as to the status of the
intent to replace the bridge. The team urges TxDOT to carefully compare
the project description in an EA and any resulting FONSI and to explain
in the FONSI any project description changes from the EA.
The team found there were 15 out of 83 project files where criteria
for a specific CE category remained either undocumented or unclear for
certain CEs (c)(26)-(28). Examples included a project that may not
conform to 23 CFR 771.117(e)(4) due to major traffic disruption, a
(c)(22) operational ROW project stated both ``rehab lanes'' and ``widen
lanes,'' and (c)(23) projects not to exceed $5 million in Federal
funds.
Audit #2 Observation #6
The FHWA is generally interested in how TxDOT fulfills its
environmental commitments, which TxDOT records through an Environmental
Permits, Issues and Commitments (EPIC) sheet. Such sheets become part
of both the project record and often, the project bid package. In
reviewing project files, the ECOS commitment tab defaults to the
following note ``No EPICs exist for this project'' while the same file
contained uploaded EPIC sheets in the ECOS documentation tab. Since the
EPIC sheet is the way TxDOT implements its environmental commitments,
the team would like to draw TxDOT's attention to occasional
contradictory information on EPICs in its project files. The team
acknowledges that TxDOT has recognized this issue and created a joint
[[Page 54654]]
District and ENV team to address this problem.
Audit #2 Observation #7
The team found two examples of a single project that had multiple
CE approvals. Each decision document had a different approval date,
however the project was unchanged. The approval documents (with
different dates) otherwise appeared to be identical, with the exception
of minor editorial changes, such as adding a position title or
utilizing an updated form. After interviews with SAB staff, the team
learned that this practice was used to correct editorial mistakes or
when new forms were released. The team could not determine the
appropriate NEPA approval date. If a decision document (CE, FONSI, or
ROD) needs to be revisited, FHWA regulations require a re-evaluation. A
re-evaluation does not create a new NEPA approval date, it just
analyzes if the original decision remains valid in light of the new
information. The TxDOT might clarify its project files by including a
journal entry in ECOS to explain the correction of errors on forms.
Audit #2 Observation #8
One type of decision reviewed by the team was a sequence of re-
evaluations on the same project change that occurred after a NEPA
approval has been made. The team found one project that had three
partial re-evaluations in succession for the same design change (a
sidewalk relocation) for adjacent parcels and a construction easement
in each separate re-evaluation consultation checklist. The TxDOT
indicated in its comment on this observation that the project was
proceeding under a design-build contract that led to a number of
changes. The FHWA is concerned that this TxDOT activity could possibly
lead to segmenting the review of new impacts if this practice were to
continue.
Audit #2 Observation #9
In general the team views the continuing delay in implementing
needed substantive ECOS upgrades (i.e., outdated CE terminology and
EPIC documentation contradiction, since CE MOU approval on February 12,
2014) and the current schedule to implement upgrades over 5 years to be
too long a timeframe as recurring errors may result. The team urges
TxDOT to implement the upgrades with the timeframe of FHWA audits, as
it has continued to make recurring observations on project
recordkeeping during audits.
3. Quality Assurance/Quality Control
The team considers the QA/QC program to be generally in compliance
with the provisions of TxDOT's QA/QC Plan. The team was pleased to see
that many of the positive items mentioned and observed in Audit #1
appear to be continuing to occur.
Successful Practices
The team observed four areas of successful practices currently in
place that align with TxDOT's QA/QC Control Procedures for
Environmental Documents. First, during the team site visits to the
TxDOT Districts it learned that one District (Houston) has one person
dedicated to reviewing the NEPA documents in order to review
documentation for quality and completeness (QC as it occurs before the
decision is made), and heard in an interview from another District
(Dallas) they are planning to do the same.
Second, the team learned that the Core Team concept (QC) appears to
be working and is well received by the District offices visited during
the audit. The opportunity of District Environmental Coordinators to
work with an ENV person early in the process to identify potential
issues should result in efficient document preparation, an expectation
of a quality document, complete project file, and improved project
delivery.
Third, the team received a lot of positive comments from the
Districts visited regarding the SAB of TxDOT. The District staffs
stated that the SAB feedback (QA that occurs after the decision is
made) was quick and resulted in a great training tool to improve
documentation on future projects. The team urges TxDOT to continue this
practice and encourages TxDOT to consider more focused and timely input
at the pre-decision stage of project development process during QC. It
is possible that the non-compliance observations cited in this report
could have been identified and corrected if an enhanced pre-decisional
(QC) process related check were implemented.
Fourth, since the beginning of 2015, TxDOT has created over 31 tool
kits, guidance, forms, handbooks, and procedures to improve consistency
and compliance of its NEPA documents and decisions. Feedback during
interviews indicated that the TxDOT staff appreciated the effort from
ENV to create user friendly forms and procedures to ensure compliance
and reduce errors in their documentation.
As a result of the team's file reviews and interviews, it considers
three observations as sufficiently important to urge TxDOT to consider
improvements or corrective actions in its approach to QA/QC.
Audit #2 Observation #10
During the audit file reviews, the team occasionally found
difficulty locating information in project files and could not
determine whether environmental requirements were addressed but not
documented. Based on what the team found in ECOS records, TxDOT appears
to lack a statewide standard or guidance on ECOS naming conventions or
ECOS file management. The FHWA reviewers found file names that were not
intuitive for conducting efficient or comprehensive reviews. During
interviews with the Districts visited, TxDOT staff at times also had
trouble locating information in ECOS and was uncertain of the details
of projects when questioned. This lack of consistency statewide is an
issue that TxDOT acknowledged in a closeout meeting with the team and
stated that it was working toward resolving the issue internally. The
team will continue to monitor this issue in Audit #3.
Audit #2 Observation #11
Based on the recurring non-compliance observations from Audits #1
and #2, the team urges TxDOT to focus effort on its QA/QC actions. In a
few instances, the team found documentation in the project files that
was the result of QC, especially when a form was in error and had to be
redone. But generally, the team found no entries in project files that
showed projects had been reviewed for QC. The team could not determine
for the project files reviewed for this audit whether TxDOT's actions
effectively implemented QA/QC actions that were agreed to in MOU Part
8.2.4. The FHWA will focus efforts in Audit #3 on how TxDOT applies QC
and implementing QA strategies to individual projects.
4. Legal Sufficiency Review
From interviews the team learned there are two attorneys in TxDOT's
Office of General Counsel (OGC) who provide legal services on
environmental issues. The OGC has an ongoing process to fill the third
environmental attorney position in OGC. In addition, OGC has had an
outside contract attorney providing legal assistance on environmental
issues for a number of years. The OGC recently completed its biannual
procurement of outside legal services for environmental issues, and has
now obtained legal services from a total of three law firms. Legal
counsel (both OGC staff and outside counsel) are primarily dedicated to
serve as a
[[Page 54655]]
resource providing legal assistance in project development, review of
environment documents, and legal sufficiency reviews.
Assistance from OGC (who assisted in developing the sections) is
guided by ENVs Project Delivery Manual Sections 303.080 through
303.086. These sections provide guidance on requesting legal
sufficiency, legal sufficiency review of FHWA projects, and review of
publishing a Notice of Intent (NOI) to prepare an EIS and Notice of
Availability in the Federal Register. Per the guidance, legal
sufficiency is required prior to approval of:
(1) NOI to prepare an EIS
(2) Final Environmental Impact Statement (FEIS)
(3) Individual 4(f) Statement (programmatic or de minimis 4(f)
evaluations do not require legal sufficiency review)
(4) Notice that a permit, license, or approval is final under 34
U.S.C. 139(1).
The OGC is available as a resource to ENV and the Districts to
answer questions on NEPA issues and specific questions on projects.
Requests for assistance are made through ENV and the vehicle for
communication is primarily email. The guidance states that
communications between OGC and ENV for the purpose of rendering legal
services or advice are protected by the attorney-client privilege.
Based on a report provided by OGC, since January 1, 2015, it has
reviewed or has been involved in providing legal review for 15 project
actions. These included five 139(l) notices, an FEIS/ROD, three RODs,
one NOI, an EA, a public hearing and response report, an FEIS, and an
FEIS errata sheet. The OGC provided legal sufficiency reviews for all
139(l) reviews, the FEIS errata sheet, and the FEIS.
Currently, ENV project managers request the review of documents
and/or materials by OGC. The lead attorney in OGC assigns the project
to staff based on workload and issues. He works with the project
managers to agree upon an acceptable review timeframe. Per OGC, reviews
are only done after the technical reports have been reviewed and
approved by ENV. Comments from the attorney are provided in the usual
comment/response matrix to ENV, which incorporates them into the
overall comment/response matrix that is sent to the project Core Team
to address. Once any comments are adequately addressed, the attorney
will issue a legal sufficiency statement. The OGC does not maintain a
separate project file as it completes review of a project.
In reviewing the document for legal sufficiency the OGC attorneys
rely on Federal regulations and guidance, TxDOT toolkits and manuals,
and discussions with project delivery managers. The OGC relies on the
subject matter experts to ensure the technical reports are adequate,
and only does an in-depth review of a technical report if warranted. In
general, the attorneys are looking for consistent, well written
documents that are reader friendly and clearly document the NEPA
decision. After reviewing the document, there is a consultation between
the lead attorney and staff attorney concerning the review results
before a legal sufficiency finding is issued. Copies of emails
providing comments on Federal and State register notices, the legal
sufficiency reviews of several Section 139(l) notices, and an FEIS were
provided to the team.
The lead attorney for OGC has 11 years of transportation experience
with TxDOT but until NEPA assignment process began, only limited NEPA
experience. The other OGC attorney's NEPA experience also began with
the NEPA Assignment process. The contract attorney has had
approximately 12 years of experience working NEPA issues and lawsuits
in Texas. The OGC may hire outside law firms to provide assistance on
an as-needed basis. All such firms have extensive transportation and
NEPA experience.
The OGC indicated that there has been some early involvement in
project familiarization and information gathering so that it is aware
of potential issues, impacts, and timeframes during project initiation
and scoping. The OGC is making a concerted effort also to attend public
hearings and other project meetings as the project development process
progresses. The OGC wants to be considered a resource for the ENV and
TxDOT Districts from early on in project development as opposed to only
being contacted when there are major issues.
Based on the team interviews and review of documentation, the
requirements for legal sufficiency under the MOU are being adequately
fulfilled. In FHWA's experience, legal staff can expand their role by
inserting themselves into the project development process and promoting
their availability as a resource to TxDOT staff.
Audit #2 Observation #12
Neither in the project delivery manual nor elsewhere does OGC
provide an expectation for the time frame necessary for a legal review.
The team urges TxDOT to establish a review time frame for legal
sufficiency, develop some education and outreach materials to the TxDOT
Districts regarding the OGC role, especially as a resource, and
suggested additions to the legal sufficiency documentation.
5. Performance Measurement
Part 10 of the MOU identifies performance measures to be reported
by TxDOT that FHWA would consider in conducting audits. The FHWA did
not independently verify the measures reported by TxDOT. The TxDOT's
first Self-Assessment Summary Report (since implementing NEPA
Assignment) discusses progress made toward meeting the four performance
measures. These measures provide an overall indication of TxDOT's
discharge of its MOU responsibilities. In addition, in collecting data
related to the reporting on the performance measures, TxDOT monitors
its overall progress in meeting the targets of those measures and
includes this data in self-assessments provided under the MOU (Part
8.2.5). The four performance measures are: (1) compliance with NEPA and
other Federal environmental statutes and regulations, (2) QA/QC for
NEPA decisions, (3) relationships with agencies and the general public,
and (4) increased efficiency and timeliness in completion of the NEPA
process.
The TxDOT reports three measures of compliance with NEPA and other
Federal laws and regulations: (1) percent of complete NEPA Assignment
Program Compliance Review Reports submitted to FHWA on schedule, (2)
percent of identified corrective actions that are implemented, and (3)
percent of final environmental documents that contain evidence of
compliance with requirements of Section 7, Section 106, and Section
4(f). The measured results range between 97 percent and 100 percent
complete.
The TxDOT considered QA/QC for NEPA decisions with three measures:
(1) percent of FEISs and individual Section 4(f) determinations with
legal sufficiency determinations that pre-date environment document
approval, (2) percent of EAs and EISs with completed environmental
review checklists in the file, and (3) percent of sampled environmental
project files determined to be complete and adequate for each self-
assessment period. These measured results range between 94.3 and 100
percent.
The TxDOT is still in the process of assessing its measure of
relationships with agencies and the general public. Since the
completion of Audit #1, TxDOT has prepared and distributed a survey to
agencies it interacts with as part of NEPA. The survey asked agency
staff to respond to TxDOT's capabilities,
[[Page 54656]]
responsiveness, efficiency, communications, and quality. The TxDOT
proposes to poll agencies each year and report comparisons in future
self-assessments. The TxDOT's measure of its relationship with the
public is to compare the number of complaints received year to year.
The TxDOT reports no complaints from the public received since assuming
NEPA Assignment. A second measure for public relationship is the
percent of signed final EA or EIS projects where a public meeting or
hearing was conducted and the associated documentation was in the file.
The TX DOT reports a measure of 92.3 percent because one EA file had a
missing signed public hearing certification page. A third measure of
relationships considered by TxDOT is the time between beginning a
formal conflict resolution process and the date of resolution. The
TxDOT reports there was no conflict resolution process initiated during
the team's review period.
The TxDOT provided its initial measures of increased efficiency and
timeliness in completion of the NEPA process in the Self-Assessment
Summary Report. Its first of three measures is to compare the median
time to complete CEs, EAs, and EISs before and after assignment. The
TxDOT reports that it needs more time to compile post-NEPA assignment
data. The TxDOT reports that the pre-NEPA assignment median time frame
to complete an EA is 1060 days (35.33 months) and 3,351 days (111.7
months) to complete an EIS. The second measure is the median time frame
from submittal of biological assessment to receipt of biological
opinion. The TxDOT reports that the pre-NEPA Assignment median time
frame for completing a biological opinion is 43 days, and 16 days to
complete informal consultation. The TxDOT reported a time frame of 65
days for a single biological opinion since NEPA Assignment. The 10
informal consultations since assignment had a median time frame of 28
days (12 days longer).
Successful Practices
In interviews, the team learned of several best practices from the
TxDOT CE Self-Assessment Report. The TxDOT's QA/QC process generates
measures of error rates that provide useful information to improve the
overall program management and efficiency. The TxDOT has used
performance measures to evaluate the effectiveness of the SAB Feedback
Program, and has demonstrated reduced error rates over its limited
review time frames. Also, some of the measures closely correlated with
follow up training which demonstrated its utility. One individual
stated in an interview that the initial rate was initially in the high
single digit percentiles (c.f., if CE determinations were signed or
not). The team then considered three periods of data corresponding to
rough quarter yearly time frames. In the initial quarter, people who
made mistakes and were then mentored through a phone call showed a drop
in number of errors over time. The same people were, for the most part,
no longer making the same errors after the third quarter.
Another practice the team learned about through interviews was that
TxDOT had collected and considered many measures of its performance in
addition to the ones in the Self-Assessment Report Summary. The team
requested more information about these additional measures from TxDOT
and has received some details (TxDOT's CE Self-Assessment Report). The
team hopes to see more. The team encourages TxDOT to generate
performance measures in addition to the ones reported and to share
those measures with the team as part of FHWA's overall review of NEPA
assignment.
Audit #2 Observation #13
The team continues to be concerned that the measure for the TxDOT
relationship with the public may be too limited by focusing on the
number of complaints, and urges TxDOT to continue thoughtful
consideration of the development of this measure. The team learned
through interviews that the CSTAR database is where complaints get
recorded and distributed to different parts of TxDOT, but that it
apparently was not consulted to compute a baseline measure to use for
comparison. Also, public complaints, according to District staff, come
into individual District offices which may not be tabulated in CSTAR.
The team urges TxDOT to consider the measure of public relationship in
more refined detail than agency-wide scale to distinguish concerns that
are tied to a particular project and those tied to program management
and decisionmaking. The FHWA acknowledges that public comments and
complaints were and will continue to be an important consideration in
project level decisionmaking. The performance measure for public
relationship should address TxDOT's consideration of project specific
concerns (not just the number of complaints) and concerns about the
environmental program.
6. Training Program
The team recognizes the following successful practices. The team
learned of resource sharing within the Houston District of Subject
Matter Resource (SMR) staff who serve as in-house sources of knowledge
and expertise. The SMR staff also commit to attend formal training and
perform self-study in their resource areas, which allows them to
provide training and mentor other staff on subjects within or related
to the resource area.
A second best practice described to the team was that TxDOT
conducted a survey of its staff in the summer of 2015 to determine
needs and issues related to training. The TxDOT provided the survey
results, and the team found these data to be both detailed and
informative. The TxDOT reported during the pre-Audit #2 that this
information was used to identify training needed by ENV staff to
professionally develop Division staff and maintain expertise in their
respective subject areas. The survey results from District staff
identified training needed for District environmental staff to perform
job duties. The team looks forward to reviewing TxDOT's progressive
training plan and the updated training plan based on the new data.
A third best practice the team learned through interviews is that
the TxDOT tool kit (available to consultants, local government staff,
and the public) provides training opportunities for documentation and
record keeping. When a consultant raises a question or concern in
response to a TxDOT document review comment, staff can refer to the
tool kit in order to support the TxDOT position. Finally, the ENV
Director said in his interview that the tool kits contribute to
increased consistency throughout the process (e.g., comments on
documents, format, and content), resulting in a more predictable
project development process. That consistency is appreciated across the
board in Districts and LPAs.
Audit #2 Observation #14
The FHWA recognizes that TxDOT's annual environmental conference is
its primary outreach to Local Public Agencies (LPA) and consultants to
address a wide array of environmental topics that reinforce existing
and new environmental policies and procedures. However, the 2015
conference was not well attended by LPA staff, a fact acknowledged by
the Director of ENV in his interview. He also indicated that he was
thinking of reaching out to large metropolitan planning organizations
and the Association of Texas
[[Page 54657]]
Metropolitan Planning Organizations in a meaningful way in coordination
with TxDOT's training coordinator. The team also learned through
interviews that some, especially rural District local government staff,
were uninformed of the changes with TxDOT NEPA Assignment. The team
encourages the Director of ENV and the training coordinator to
implement ways to train local government staff.
Status of Observations since the Last Audit (December 2015)
Non-Compliant Observations
Audit #1 identified two non-compliance observations. One was
related to the application of a CE action that related to a program
that TxDOT did not have. The TxDOT acknowledges this non-compliance
observation and has taken corrective action to prevent future non-
compliance. Accordingly, a stand-alone noise wall project using 23 CFR
771.117(c)(6) is no longer a possible selection of CE actions that any
TxDOT District can make. The other was an instance where a CE
determination was made (called a conditional NEPA approval or
``conditional clearance'') before all environmental requirements had
been satisfied. Since Audit #1, TxDOT has continued to make NEPA
approvals ``conditionally,'' and those actions have been identified as
non-compliant in this report. The TxDOT drafted an update of an SOP to
address this issue. The FHWA expects TxDOT to prepare a corrective
action so that its program would comply with the MOU. The FHWA will
review the corrective action and indicate to TxDOT whether it
satisfactorily addresses this concern. Also, FHWA requested that TxDOT
take additional steps to prevent any future non-compliance in this
regard.
Observations
1. Updates to ECOS, the TxDOT File of Record
The TxDOT ran into further delays in implementing its ECOS upgrade
contract. The TxDOT has a plan in place that outlines five phases of
work to be performed to upgrade ECOS over many years. Substantive ECOS
upgrades are still pending as of the development of this draft report.
This is leading to continued observations by FHWA, and inconsistencies
within ECOS by TxDOT users. A lack of mandatory filing and naming
conventions by ENV contributes to this issue. Of concern to FHWA is the
ability for TxDOT users to potentially delete files and approvals in
ECOS without an archive of such actions. This could be problematic as
it differs from the FHWA's previous understanding of ECOS security
measures in place from Audit #1.
2. Addressing Conflicts and Disputes
Since Audit #1, TxDOT has implemented conflict resolution training
for its ENV and District staff. This training has been well received
and should help prepare staff to recognize when conflicts may occur and
to take steps to address issues before they develop into disputes.
Interviews conducted for Audit #2 suggest that TxDOT and resource
agency staff may need to focus on improving communication in order to
foster and nurture relationships.
3. Local Public Agency Project Reviews
This observation continues as is. The LPA were invited to the TxDOT
Environmental Coordinators Conference (ECC), but TxDOT ENV confirmed
that few LPAs attended. It was further noted by TxDOT that perhaps the
ECC may not be the best training venue for LPAs that need more than
introductory information or refreshers on NEPA related topics.
Furthermore, some rural Districts indicated that they remain Department
Delegate on local projects when LPAs can or should be project sponsors,
because LPAs in the rural areas are sometimes unaware of what to do to
develop their projects. The situation seems to be different in
metropolitan areas where LPAs are more sophisticated and can perform
well as project sponsors.
4. Recording and Implementing Environmental Commitments
The team continued to find issues with the EPIC sheet and
commitments in Audit #2. A total of 21 instances were found where
inconsistencies in EPIC reporting were noted. Primarily, there was the
fundamental problem of EPICs being required (and sometimes uploaded
under the documentation tab) for a project but a notice stating ``No
EPICs Exist for this project'' under the EPIC tab in ECOS was
frequently found. The TxDOT has formed an internal team to address this
issue.
5. Inadequate Project Description
The TxDOT has begun to address the issue of inadequate project
descriptions by providing training on expectations for what should be
in a project description in its 2015 environmental conference. The
training instructors included individuals from FHWA and TxDOT. The team
continued to find project descriptions that were unclear or may not
have supported the decisions made in project files. The team suggests
that TxDOT apply QA/QC to this issue. The TxDOT acknowledges this is a
continuing issue and has indicated that it will continue to address it
in NEPA chats and training.
6. Project File Organization and Completeness Issues
The team continued to find outdated terms in project files (e.g.,
BCE/PCE) and have occasional difficulty in finding information in
project files with no consistent file labeling protocol or expectations
for where to find specific information. For example, resource agency
coordination letters were sometimes found as individual documents in a
file and other times they were appended to a NEPA document. The TxDOT
indicated that it formed a workgroup in the summer of 2015 that meets
to address inconsistencies regarding filing and naming conventions.
7. Public Disclosure of ECOS Project Records
The TxDOT has not taken any actions on this item other than to make
information available upon request or at public meetings/hearings for a
project.
8. No EAs or EIS Being Reviewed by the SAB Team
The team learned that SAB only performs post decision (QA) reviews
and provides feedback to both the Districts directly and the Corrective
Action Team at ENV to consider if any process or procedural changes are
needed. The FHWA believes there is a function that SAB or others could
serve before the decision is made that would add value to the upfront
QC process for both document content and procedural compliance. The
FHWA understands the expected benefits of Core Team reviews but
believes something more is needed and it would be helpful to Districts.
9. Sampling Approach for QA/QC
The team learned in Audit #2 that there is a risk-based sampling
method applied to choosing projects types that are selected for more
detailed reviews, and that the number of staff available for the
reviews dictates the number of reviews that are completed. The review
sample is based on a computer generated model that chooses some of the
projects randomly. There is no established sampling methodology for
self-assessing the effectiveness of TxDOT's standards or guidance. The
FHWA would like to see more clarification from TxDOT on the
effectiveness of its current practice and be provided data to verify
TxDOT claims of compliance.
10. Confusion in Understanding Quality Control, Quality Assurance,
and Self-Assessment
Most of the confusion within TxDOT regarding these terms has been
cleared up. The FHWA believes that additional
[[Page 54658]]
internal (QC) review (beyond the Core Team concept for project
documentation) for NEPA process-related checks by TxDOT before the
decisions were made would add value to the process, help ensure NEPA
compliance, and assist with FHWA's requirement to make informed and
fully compliant project authorization decisions.
11. Narrow Definition of the QA/QC Performance Measure
The team's Observation #11 was that the QA/QC measure for NEPA
decisions focused only on EA and EIS projects. The team urges TxDOT to
consider evaluating a broader range of NEPA related decisions
(including, but not limited to CEs, re-evaluations, Section 4(f), and
STIP/Transportation Improvement Program (TIP) consistency). Note that
the recurring non-compliance observations occurred on CEs with either
STIP/TIP or Section 4(f) items that were not ready for a decision to be
made. In recent interviews with TxDOT staff, the team learned that
TxDOT will examine other measures on an ongoing basis for internal use.
The team believes that if the QA/QC refocuses attention not only on the
documentation, but also on the required sequential NEPA process related
items, that improved efficiencies related to TxDOT's NEPA decision and
FHWA project authorization could result. The team believes that a more
relevant focus on process could potentially help avoid non-compliance
actions by TxDOT under the MOU and FHWA non-compliance observations in
future audits.
12. Performance Measure Utility
Observation #12 was that the utility of several of the performance
measures was difficult to determine. Also, the team was concerned that
the measure for the TxDOT relationship with the public may be too
limited by focusing on the number of complaints. Through recent
interviews, the team learned that TxDOT staff agree with FHWA's
concerns about utility. Quantifying changes in relationships with the
public or agencies is possible, but the number is hard to interpret.
Regarding the survey of agencies, TxDOT staff indicated that they did
not know if agencies have higher expectations of TxDOT compared with
other agencies. Considering the TxDOT relationship with the public,
staff told the team that, during the preparation of their application,
they considered various sorts of surveys and social media outreach.
Given the cost of these approaches, TxDOT was not convinced of their
utility and so decided not to use any of them. This leaves the
performance measure difficult to address for TxDOT and may be a
recurring FHWA observation until it is resolved.
13. TxDOT Reliance on the California Department of Transportation
(Caltrans) Training Plan
The team's Observation #13 was that the Caltrans training plan,
which served as a basis for the TxDOT training plan, may not adequately
meet the needs of TxDOT. The team urged TxDOT to consider other State
DOT approaches to training. The TxDOT staff said in a recent interview
that they had reviewed training plans from Virginia, Ohio, Alaska, and
Florida. They also indicated that prior to Audit #2, TxDOT had
completed a survey of staff in District offices and at ENV to assess
training needs. The team was told that the surveys would be used to
update the training plan in the spring of 2016.
14. Adequacy of Training for non-TxDOT Staff
Observation #14 urged TxDOT to assess whether the proposed training
approach for non-TxDOT staff (relying heavily upon the annual ECC) is
adequate and responsive enough to address a need to quickly disseminate
newly developed procedures and policy. Through interviews, the team
learned that TxDOT does not prioritize training classes specifically
for non-TxDOT staff. The Director of ENV acknowledged that the training
session at the recent ENV conference for LPA staff was not well
attended and was thinking of reaching out to large planning
organizations. The TxDOT concluded that its priority for training is
first for TxDOT staff internally (ENV and District staff), second for
consultants that TxDOT hires for environmental work, and third for
LPAs. In years three and beyond of the TxDOT NEPA Assignment, the
training plan may start to focus on the second, and eventually third,
priority groups of individuals.
15. What Training is Mandatory
Observation #15 resulted in a team suggestion that the progressive
training plan clearly identify the training required for each job
classification. The TxDOT training coordinator told the team that the
progressive training plan will address training required to meet State
law (16 hours of training) and job task certification. This plan will
be developed at the end of 2015.
16. Training Plan, Consideration of Resource Agency Recommendations
The team learned in a recent interview that in the fall of 2015 (as
in the fall of 2014), TxDOT subject matter experts planned to reach out
to resource agencies to ask what training they would like to see
conducted for TxDOT staff. Previously, USACE staff said that TxDOT
needed Section 404 training. The TxDOT scheduled and completed Section
404 training in two different locations during October 2015. The TxDOT
will continue to schedule Section 404 training.
Finalization of Report
The FHWA received one response from the TxDOT during the 30-day
comment period for the draft report. The team has considered the TxDOT
comments in finalizing this audit report. The TxDOT's comments reflect
actions it has taken in response to the report's observations. The FHWA
will address these follow up actions in the third audit report, now in
preparation. Only one comment has resulted in a non-substantial change
in this report. Observation #1 mentioned a possible communication issue
with the THC. The FHWA agrees that the comment may not reflect the
official position of the agency and has deleted the sentence mentioning
the THC.
The TxDOT made several comments disputing non-compliance
observation #1. Representatives from FHWA and TxDOT met to discuss non-
compliance observation #1 on May 11, 2016. The TxDOT, via an email, has
subsequently decided to withdraw their comments on this non-compliance
observation. The final report discussion of non-compliance observation
#1 has not been revised.
The FHWA has finalized the draft Audit #2 report previously
published in the Federal Register without substantive changes.