Environmental Impact Statement: Butler and Carter Counties, MO |
---|
|
Donald Neumann
Federal Highway Administration
8 June 1994
[Federal Register Volume 59, Number 109 (Wednesday, June 8, 1994)] [Unknown Section] [Page 0] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 94-13829] [[Page Unknown]] [Federal Register: June 8, 1994] ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Butler and Carter Counties, MO AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of intent. ----------------------------------------------------------------------- SUMMARY: The FHWA is issuing this notice to advise the public that an environmental impact statement will be prepared for a proposed project in Butler and Carter Counties, Missouri. FOR FURTHER INFORMATION CONTACT: Mr. Donald Neumann, Federal Highway Administration, P.O. Box 1787, Jefferson City, MO 65102, Telephone Number 314-636-7104; or Mr. Bob Sfreddo, Design Engineer, Missouri Highway and Transportation Department, P.O. Box 270, Jefferson City, MO 65102, Telephone Number 314-751-2876. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Missouri Highway and Transportation Department (MHTD), will prepare an environmental impact statement (EIS) on a proposal to improve Missouri Route 60 in Butler and Carter Counties, Missouri. 1. The proposed improvement would reconstruct approximately 67.6 kilometers (42 miles) of Route 60 between Poplar Bluff and Van Buren, including a new interchange at U.S. Route 67. Improvements to the corridor are needed to provide for existing and projected traffic demand. 2. Alternatives under consideration include: (1) A ``no build'' option, (2) mass transit and transportation system management, (3) improvement of the existing two-lane roadway to four lanes, (4) constructing a four-lane, limited-access highway on a new location, and (5) constructing a four-lane, fully controlled access highway on a new location. 3. To date, preliminary information has been issued to local officials and other interested parties. The scoping process will be initiated with Federal, State, and local agencies. Formal agency and public scoping meetings will be held in Elsinore and Poplar Bluff in June or July of 1994. In addition, a public hearing will be held. Public notice will be given in advance of the date and time of each meeting. The draft EIS will be available prior to the public hearing for public review and comment. To ensure that the full range of issues related to this proposed action are addressed and all significant issues identified, comments and suggestions are invited from all interested parties. Any comments or questions concerning this proposed action and the EIS should be directed to the FHWA or the Missouri Highway and Transportation Department at the addresses provided above. Issued on: May 20, 1994. Donald Neumann, Program Review Engineer, Jefferson City. [FR Doc. 94-13829 Filed 6-7-94; 8:45 am] BILLING CODE 4910-22-M