Environmental Impact Statement: Howell, Shannon, and Carter Counties, MO |
---|
|
Donald Neumann
Federal Highway Administration
8 June 1994
[Federal Register Volume 59, Number 109 (Wednesday, June 8, 1994)] [Unknown Section] [Page 0] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 94-13828] [[Page Unknown]] [Federal Register: June 8, 1994] ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Environmental Impact Statement: Howell, Shannon, and Carter Counties, MO AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of intent. ----------------------------------------------------------------------- SUMMARY: The FHWA is issuing this notice to advise the public that an environmental impact statement will be prepared for a proposed project in Howell, Shannon, and Carter Counties, Missouri. FOR FURTHER INFORMATION CONTACT: Mr. Donald Neumann, Federal Highway Administration, P.O. Box 1787, Jefferson City, MO 65102, Telephone Number 314-636-7104; or Mr. Bob Sfreddo, Design Engineer, Missouri Highway and Transportation Department, P.O. Box 270, Jefferson City, MO 65102, Telephone Number 314-751-2876. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Missouri Highway and Transportation Department (MHTD), will prepare an environmental impact statement (EIS) for a location study along Route 60 in Howell, Shannon, and Carter Counties, Missouri. 1. The proposed location study begins at Route U east of Willow Springs, in Howell County, and continues approximately 88.5 kilometers (55 miles) to a point approximately 2.4 kilometers (1.5 miles) west of Van Buren, in Carter County. Improvements are considered necessary to improve safety, to improve access in the three-county region, and to increase capacity. 2. Alternatives under consideration include improving the existing highway, widening the existing highway, and constructing a new four- lane highway. A ``no build'' option, as well as mass transit and transportation system management options also are being considered. 3. To date, preliminary information has been issued to local officials and other interested parties. The scoping process will be initiated with Federal, State, and local agencies. Formal agency and public scoping meetings will be held in about June of 1994. A public hearing will likely be held in the fall of 1995. Public notice will be given in advance of the date and time of each meeting. The draft EIS will be available prior to the public hearing for public review and comment. To ensure that the full range of issues related to this proposed action are addressed and all significant issues identified, comments and suggestions are invited from all interested parties. Any comments or questions concerning this proposed action and the EIS should be directed to the FHWA or the Missouri Highway and Transportation Department at the addresses provided above. Issued on May 6, 1994. Donald Neumann, Program Review Engineer, Jefferson City. [FR Doc. 94-13828 Filed 6-7-94; 8:45 am] BILLING CODE 4910-22-M