Home Page American Government Reference Desk Shopping Special Collections About Us Contribute



Escort, Inc.






GM Icons
By accessing/using The Crittenden Automotive Library/CarsAndRacingStuff.com, you signify your agreement with the Terms of Use on our Legal Information page. Our Privacy Policy is also available there.

Notice of Final Federal Agency Actions on the North Houston Highway Improvement Project (NHHIP) in Texas


American Government

Notice of Final Federal Agency Actions on the North Houston Highway Improvement Project (NHHIP) in Texas

Michael T. Leary
Federal Highway Administration
9 February 2021


[Federal Register Volume 86, Number 25 (Tuesday, February 9, 2021)]
[Notices]
[Pages 8828-8829]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-02661]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION


Notice of Final Federal Agency Actions on the North Houston 
Highway Improvement Project (NHHIP) in Texas

AGENCY: Texas Department of Transportation (TxDOT), Federal Highway 
Administration (FHWA), U.S. Department of Transportation.

ACTION: Notice of limitation on claims for judicial review of actions 
by TxDOT and Federal agencies.

-----------------------------------------------------------------------

SUMMARY: This notice announces actions taken by TxDOT and Federal 
agencies that are final. The environmental review, consultation, and 
other actions required by applicable Federal environmental laws for 
this project are being, or have been, carried-out by TxDOT pursuant to 
an assignment agreement executed by FHWA and TxDOT. These actions grant 
licenses, permits, and approvals for the North Houston Highway 
Improvement Project (NHHIP), from US 59/I-69 at Spur 527 to I-45 at 
Beltway 8 North, in Harris County, Texas.

DATES: By this notice, TxDOT is advising the public of final agency 
actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review 
of TxDOT and Federal agency actions on the NHHIP will be barred unless 
the claim is filed on or before the deadline. For the NHHIP, the 
deadline is 150 days from the date of publication. If the Federal law 
that authorizes judicial review of a claim provides a time period of 
less than 150 days for filing such a

[[Page 8829]]

claim, then that shorter time period still applies.

FOR FURTHER INFORMATION CONTACT: Carlos Swonke, Environmental Affairs 
Division, Texas Department of Transportation, 125 East 11th Street, 
Austin, Texas 78701; telephone: (512) 416-2734; email: 
carlos.swonke@txdot.gov. TxDOT's normal business hours are 8:00 a.m.-
5:00 p.m. (central time), Monday through Friday.

SUPPLEMENTARY INFORMATION: The NHHIP includes construction of roadway 
improvements to add four managed express (MaX) lanes on I-45 from 
Downtown Houston to Beltway 8 North, reroute I-45 to be parallel with 
I-10 on the north side of Downtown Houston and parallel to US 59/I-69 
on the east side of Downtown Houston, realign sections of I-10 and US 
59/I-69 in the Downtown area to eliminate the current roadway reverse 
curves that limit capacity, and depress US 59/I-69 between I-10 and 
Spur 527 south of Downtown to remove the problematic weaving sections. 
The NHHIP also includes reconstruction of mainlanes and frontage roads; 
addition of bicycle/pedestrian realms along the streets that cross the 
freeways, including a 15- to 17 foot-wide pedestrian realm that will 
create a buffer between the bicycle/pedestrian traffic and the 
vehicular traffic; addition of sidewalks along frontage roads; and 
addition of pass-through lanes on I-10 that will separate traffic 
desiring to go to Downtown from traffic destined to go through 
Downtown. The total project length is approximately 25.3 miles. The 
purpose of the NHHIP is to implement an integrated system of 
transportation improvements that would manage I-45 traffic congestion 
in the NHHIP area through added capacity, MaX lanes, options for SOV 
lanes, and improved operations; improve mobility on I-45 between US 59/
I-69 and Beltway 8 North by accommodating projected population growth 
and latent demand in the project area; provide expanded transit and 
carpool opportunities; bring I-45, I-10, and US 59/I-69 up to current 
design standards to improve safety and operations; improve the 
capabilities of I-45 as an emergency evacuation route; improve 
stormwater drainage on I-45; and support the projected significant 
increase in travel on the regional highways in the Houston-Galveston 
area.
    The actions by TxDOT and Federal agencies and the laws under which 
such actions were taken are described in the Final Environmental Impact 
Statement (FEIS), the Record of Decision (ROD) issued on February 3, 
2021, and other documents in the TxDOT project file. The FEIS, ROD, and 
other documents in the TxDOT project file are available by contacting 
the TxDOT Houston District Office at TxDOT Houston District Office, 
Advanced Project Development Director, P.O. Box 1386, Houston, TX 
77251, or by phone by calling (713) 802-5070. The FEIS and ROD can also 
be viewed and downloaded from the following website: 
www.ih45northandmore.com.
    The environmental review, consultation, and other actions required 
by applicable Federal environmental laws for the NHHIP are being, or 
have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a 
Memorandum of Understanding dated December 9, 2019, and executed by 
FHWA and TxDOT.
    Notice is hereby given that TxDOT and Federal agencies have taken 
final agency actions by issuing licenses, permits, and approvals for 
the NHHIP in the State of Texas.
    This notice applies to all TxDOT and Federal agency decisions as of 
the issuance date of this notice and all laws under which such actions 
were taken, including but not limited to:
    1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 
4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109].
    2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)].
    3. Land: Section 4(f) of the Department of Transportation Act of 
1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers) 
[23 U.S.C. 319].
    4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and 
Section 1536], Marine Mammal Protection Act [16 U.S.C. 1361], Fish and 
Wildlife Coordination Act [16 U.S.C. 661-667(d)], Migratory Bird Treaty 
Act [16 U.S.C. 703-712].
    5. Historic and Cultural Resources: Section 106 of the National 
Historic Preservation Act of 1966, as amended [54 U.S.C. 300101 et 
seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 
470(aa)-11]; Archeological and Historic Preservation Act [54 U.S.C. 
312501 et seq.]; Native American Grave Protection and Repatriation Act 
(NAGPRA) [25 U.S.C. 3001-3013].
    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 
2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 
1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
    7. Wetlands and Water Resources: Clean Water Act [33 U.S.C. 1251-
1377] (Section 404, Section 401, Section 319); Land and Water 
Conservation Fund (LWCF) [16 U.S.C. 4601-4604]; Safe Drinking Water Act 
(SDWA) [42 U.S.C. 300(f)-300(j)(6)]; Rivers and Harbors Act of 1899 [33 
U.S.C. 401-406]; Wild and Scenic Rivers Act [16 U.S.C. 1271-1287]; 
Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931]; TEA-21 
Wetlands Mitigation [23 U.S.C. 103(b)(6)(m), 133(b)(11)]; Flood 
Disaster Protection Act [42 U.S.C. 4001-4128].
    8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 
Floodplain Management; E.O. 12898 Federal Actions to Address 
Environmental Justice in Minority Populations and Low Income 
Populations; E.O. 11593 Protection and Enhancement of Cultural 
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; 
E.O. 13175 Consultation and Coordination with Indian Tribal 
Governments; E.O. 11514 Protection and Enhancement of Environmental 
Quality; E.O. 13112 Invasive Species. (Catalog of Federal Domestic 
Assistance Program Number 20.205, Highway Planning and Construction.)

    Authority: 23 U.S.C. 139(l)(1).

Michael T. Leary,
Director, Planning and Program Development, Federal Highway 
Administration.
[FR Doc. 2021-02661 Filed 2-8-21; 8:45 am]
BILLING CODE 4910-22-P




The Crittenden Automotive Library