Surface Transportation Project Delivery Program; Arizona Department of Transportation Final FHWA Audit Report

Publication: Federal Register
Agency: Federal Highway Administration
Byline: Stephanie Pollack
Date: 5 November 2021
Subjects: American Government , Roads & Highways

[Federal Register Volume 86, Number 212 (Friday, November 5, 2021)]
[Notices]
[Pages 61381-61386]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-24215]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration

[FHWA Docket No. FHWA-2020-0020]


Surface Transportation Project Delivery Program; Arizona 
Department of Transportation Final FHWA Audit Report

AGENCY: Federal Highway Administration (FHWA), Department of 
Transportation (DOT).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Moving Ahead for Progress in the 21st Century Act (MAP-21) 
established the Surface Transportation Project Delivery Program that 
allows a State to assume FHWA's environmental responsibilities for 
environmental review, consultation, and compliance under the National 
Environmental Policy Act (NEPA) for Federal highway projects. When a 
State assumes these Federal responsibilities, the State becomes solely 
responsible and liable for carrying out the responsibilities it has 
assumed, in lieu of FHWA. This program mandates annual audits during 
each of the first four years of State participation to ensure 
compliance with program requirements. This is the first audit of the 
Arizona Department of Transportation's (ADOT) performance of its 
responsibilities under the Surface Transportation Project Delivery 
Program (NEPA Assignment Program). This notice finalizes the first 
audit report for ADOT.

FOR FURTHER INFORMATION CONTACT: Mr. Neel Vanikar, Office of Project 
Development and Environmental Review, (202) 366-2068, 
neel.vanikar@dot.gov, Federal Highway Administration, U.S. Department 
of Transportation, 1200 New Jersey Avenue SE, Washington, DC 20590, or 
Mr. Patrick Smith, Office of the Chief Counsel, (202) 366-1345, 
patrick.c.smith@dot.gov, Federal Highway Administration, U.S. 
Department of Transportation, 1200 New Jersey Avenue SE, Washington, DC 
20590. Office hours are from 8:00 a.m. to 4:30 p.m., Eastern Standard 
Time, Monday through Friday, except Federal holidays.

SUPPLEMENTARY INFORMATION:

Electronic Access

    An electronic copy of this notice may be downloaded from the 
specific docket page at www.regulations.gov, from the Office of the 
Federal Register's website at www.FederalRegister.gov, or from the 
Government Publishing Office's website at www.GovInfo.gov.

Background

    The Surface Transportation Project Delivery Program, codified at 23 
U.S.C. 327, commonly known as the NEPA Assignment Program, allows a 
State to assume FHWA's environmental responsibilities for review, 
consultation, and compliance for Federal highway projects. When a State 
assumes these Federal responsibilities, the State becomes solely liable 
for carrying out the responsibilities it has assumed, in lieu of FHWA. 
The ADOT published its application for NEPA assumption on June 29, 
2018, and solicited public

[[Page 61382]]

comment. After considering public comments, ADOT submitted its 
application to FHWA on November 16, 2018. The application served as the 
basis for developing a Memorandum of Understanding (MOU) that 
identifies the responsibilities and obligations that ADOT would assume. 
The FHWA published a notice of the draft MOU in the Federal Register on 
February 11, 2019, at 84 FR 3275, with a 30-day comment period to 
solicit the views of the public and Federal agencies. After the close 
of the comment period, FHWA and ADOT considered comments and proceeded 
to execute the MOU. Effective April 16, 2019, ADOT assumed FHWA's 
responsibilities under NEPA, and the responsibilities for NEPA-related 
Federal environmental laws described in the MOU.
    Section 327(g) of Title 23, U.S.C., requires the Secretary to 
conduct annual audits to ensure compliance with the MOU during each of 
the first four years of State participation and, after the fourth year, 
monitor compliance. The FHWA must make the results of each audit 
available for public comment. This notice finalizes the first audit 
report for ADOT.
    Authority: Section 1313 of Public Law 112-141; Section 6005 of 
Public Law 109-59; 23 U.S.C. 327; 23 CFR part 773.

Stephanie Pollack,
Acting Administrator, Federal Highway Administration.

Surface Transportation Project Delivery Program Final FHWA Audit #1 of 
the Arizona Department of Transportation

Executive Summary

    This is Audit #1 of the Arizona Department of Transportation's 
(ADOT) assumption of National Environmental Policy Act (NEPA) 
responsibilities under the Surface Transportation Project Delivery 
Program. Under the authority of 23 U.S.C. 327, ADOT and the Federal 
Highway Administration (FHWA) executed a memorandum of understanding 
(MOU) on April 16, 2019, to memorialize ADOT's NEPA responsibilities 
and liabilities for Federal-aid highway projects and other related 
environmental reviews for highway projects in Arizona. This 23 U.S.C. 
327 MOU covers environmental review responsibilities for projects that 
require the preparation of environmental assessments (EA), 
environmental impact statements (EIS), and non-designated individual 
categorical exclusions. A separate MOU between FHWA and ADOT, pursuant 
to 23 U.S.C. 326, authorizes environmental review responsibilities for 
other categorical exclusions (CE). This audit does not cover the CE 
responsibilities and projects assigned to ADOT under the 23 U.S.C. 326 
MOU.
    The FHWA conducted an audit of ADOT's performance according to the 
terms of the MOU March 9-12, 2020. Prior to the audit, the FHWA audit 
team held internal meetings to prepare for an on-site visit to the 
Arizona Division and ADOT offices. Prior to the on-site visit, the 
audit team reviewed ADOT's environmental manuals and procedures, NEPA 
project files, ADOT's response to FHWA's pre-audit information request 
(PAIR), and ADOT's NEPA Assignment Self-Assessment Report. During the 
March 2020 audit, the audit team conducted interviews with staff from 
ADOT Environmental Planning (EP) and ADOT's external partners, and 
prepared preliminary audit results. The audit team presented these 
preliminary results to ADOT EP leadership on March 12, 2020.
    Overall, the audit team found that ADOT has carried out the 
responsibilities it has assumed consistent with the intent of the MOU 
and ADOT's application. The ADOT continues to develop, revise, and 
implement procedures and processes required to deliver its NEPA 
Assignment Program. This report describes several observations and 
successful practices. Through this report, FHWA is notifying ADOT of 
two non-compliance observations that require ADOT to take corrective 
action. By addressing the observations in this report, ADOT will 
continue to assure successful program assignment.

Background

    The purpose of the audits performed under the authority of 23 
U.S.C. 327 is to assess a State's compliance with the provisions of the 
MOU as well as all applicable Federal statutes, regulations, policies, 
and guidance. The FHWA's review and oversight obligation entails the 
need to collect information to evaluate the success of the NEPA 
Assignment Program; to evaluate a State's progress toward achieving its 
performance measures as specified in the MOU; and to collect 
information for the administration of the NEPA Assignment Program. This 
report summarizes the results of the first audit in Arizona and ADOT's 
progress towards meeting the program review objectives identified in 
the MOU. Following this audit, FHWA will conduct three additional 
annual NEPA Assignment Program audits in Arizona.

Scope and Methodology

    The overall scope of this audit review is defined both in statute 
(23 U.S.C. 327) and the MOU (Part 11). The definition of an audit is 
one where an independent unbiased body makes an official and careful 
examination and verification of accounts and records, especially of 
financial accounts. Auditors who have special training with regard to 
accounts or financial records may follow a prescribed process or 
methodology in conducting an audit of those processes or methods. The 
FHWA considers its review to meet the definition of an audit because it 
is an unbiased, independent, official, and careful examination and 
verification of records and information about ADOT's assumption of 
environmental responsibilities.
    The audit team consisted of NEPA subject matter experts (SME) from 
FHWA Headquarters and Resource Center, as well as staff from FHWA's 
Arizona Division. This audit is an unbiased official action taken by 
FHWA, which included an audit team of diverse composition, and followed 
an established process for developing the review report and publishing 
it in the Federal Register.
    The audit team reviewed six NEPA Assignment Program elements: 
program management; documentation and records management; quality 
assurance/quality control (QA/QC); performance measures; legal 
sufficiency; and training. The audit team considered three additional 
focus areas for this review: project-level conformity procedures; 
Section 4(f) procedures; and public involvement procedures.
    The audit team conducted a careful examination of ADOT policies, 
guidance, and manuals pertaining to NEPA responsibilities, as well as a 
representative sample of ADOT's project files. Other documents, such as 
ADOT's PAIR responses and ADOT's Self-Assessment Report, also informed 
this review. In addition, the audit team interviewed staff from ADOT EP 
and ADOT's external partners, both in person and via teleconference.
    The timeframe defined for this first audit includes highway project 
environmental approvals completed between April 16, 2019, and December 
31, 2019. During this timeframe, ADOT completed NEPA approvals and 
documented NEPA decision points for 12 projects. Due to the small 
sample size, the audit team reviewed all 12 projects. This consisted of 
four Individual CEs, one EA with a Finding of No Significant Impact 
(FONSI), two draft EAs, one EA initiated with scoping completed, one 
draft EIS, and three EA re-evaluations.
    The PAIR submitted to ADOT contained 23 questions covering all six 
NEPA Assignment Program elements.

[[Page 61383]]

The audit team developed specific follow-up questions for the on-site 
interviews with ADOT staff based on ADOT responses to the PAIR.
    The audit team conducted a total of 17 interviews. Interview 
participants included staff from ADOT EP, Arizona Attorney General's 
Office (AGO), Environmental Protection Agency (EPA) Region 9, Arizona 
Game and Fish Department (AZGFD), Maricopa Association of Governments 
(MAG), and the City of Phoenix.
    The audit team compared ADOT manuals and procedures to the 
information obtained during interviews and project file reviews to 
determine if ADOT's performance of its MOU responsibilities is in 
accordance with ADOT procedures and Federal requirements. The audit 
team documented individual observations and successful practices during 
the interviews and reviews and combined these under the six NEPA 
Assignment Program elements. The audit results are described below by 
program element.

Overall Audit Opinion

    The audit team found ADOT has carried out the responsibilities it 
has assumed consistent with the intent of the MOU and ADOT's 
application. The FHWA is notifying ADOT of two non-compliance 
observations that require ADOT to take corrective action. By addressing 
the observations cited in this report, ADOT will continue to assure a 
successful program.

Successful Practices and Observations

    Successful practices are practices that the team believes are 
positive, and encourages ADOT to consider continuing or expanding those 
programs in the future. The audit team identified numerous successful 
practices in this report.
    Observations are items the audit team would like to draw ADOT's 
attention to, which may improve processes, procedures, and/or outcomes. 
The team identified three observations in this report.
    Non-compliance observations are instances where the audit team 
finds the State is not in compliance or is deficient with regard to a 
Federal regulation, statute, guidance, policy, State procedure, or the 
MOU. Non-compliance may also include instances where the State has 
failed to secure or maintain adequate personnel and/or financial 
resources to carry out the responsibilities they have assumed. The FHWA 
expects the State to develop and implement corrective actions to 
address all non-compliance observations. The audit team identified two 
non-compliance observations in this report.
    The audit team shared initial results during the site visit 
closeout and shared the draft audit report with ADOT to provide them 
the opportunity to clarify any observation, as needed, and/or begin 
implementing corrective actions to improve the program. The FHWA will 
consider actions taken by ADOT to address these observations as part of 
the scope of the second audit.

Successful Practices and Observations

Program Management

Successful Practices

    The ADOT EP has developed several detailed guidance manuals for 
implementing NEPA Assignment and evaluating environmental resources. 
These manuals are readily available online at ADOT's environmental 
website. The ADOT continuously updates their manuals and has a process 
for tracking updates by including a list of changes as an appendix in 
each version. Several staff members stated they regularly consult the 
guidance manuals and are informed of updates.
    The ADOT EP has developed internal procedures for resolving and 
escalating conflicts. The ADOT Project Development Procedures Manual 
describes these escalation procedures. The ADOT has found this to be an 
effective tool to assist in evaluating controversial issues, 
identifying appropriate levels of communication, and determining the 
best approach for dispute resolution.
    During interviews with staff, the audit team learned that ADOT EP 
makes a considerable effort at internal communication and coordination 
through meetings, emails, and informal interaction. The staff holds 
weekly and monthly meetings for environmental planners and technical 
groups to discuss project issues, address program-level questions, and 
update staff on guidance. Interviewed staff said they were well-
informed about procedures and comfortable discussing complex situations 
with team leads and technical experts. In addition, ADOT EP attends 
partnering/preconstruction meetings with other ADOT sections to convey 
environmental commitments and to stay informed of project changes.
    During interviews, EPA, AZGFD, and the City of Phoenix commented on 
ADOT EP's collaboration and communication efforts with them. The EPA 
was appreciative of ADOT EP holding bi-monthly coordination meetings to 
discuss the status of projects and commented on their much-improved 
relationship with ADOT. The AZGFD acknowledged and appreciated the 
opportunities to provide input through the outreach efforts of ADOT 
biologists on projects with wildlife concerns. The City of Phoenix 
noted ADOT's improved communication with local governments and efforts 
to increase flexibility in the environmental review process. The audit 
team recognizes ADOT EP's outreach efforts with these external 
partners. One area identified by the audit team in need of improved 
collaboration is project-level conformity determinations, where legal 
responsibility remains assigned to FHWA.

Observations

Non-Compliance Observation #1: Incomplete Project Files Submission
    For this audit, pursuant to MOU Sections 8.2.2 and 8.2.3, FHWA 
requested all project files pertaining to the NEPA approvals and 
documented NEPA decision points completed during the audit review 
period. The request specified the approved NEPA document and all 
supporting documentation related to the decision milestones, such as 
consultation letters, technical memos, and resource evaluations (email 
to ADOT November 26, 2019). The FHWA provided additional clarification 
to ADOT regarding the types of NEPA approvals and NEPA decision 
documents that ADOT should submit (email to ADOT December 18, 2019).
    The audit team found several inconsistences between ADOT's 
procedures for maintaining project files (as identified in the ADOT CE 
Checklist Manual, ADOT EA/EIS Manual, ADOT QA/QC Plan, and ADOT Project 
Development Procedures Manual) and the project file documentation 
provided to FHWA. The ADOT's procedures specify utilizing a standard 
folder structure for all projects and saving all project documentation 
and supporting information in the project files. However, the project 
files submitted by ADOT for this audit were incomplete and did not 
include all supporting documentation. The project files that ADOT 
submitted consisted primarily of final decision documents and, in most 
cases, did not include correspondence, internal communication, 
technical memos/reports, or other types of information to support NEPA 
decisions or demonstrate how ADOT evaluated resources.
    The audit team learned during interviews that ADOT EP management 
created a duplicate project file for each project which consisted of a 
subset of their project files. Due to the incomplete project files, it 
is unclear how ADOT is

[[Page 61384]]

maintaining electronic project files and administrative records, and 
how ADOT is complying with its procedures and the terms of the 23 
U.S.C. 327 MOU as they apply to records retention. The audit team 
determined that ADOT EP management made the decision to not submit all 
requested project files for review by FHWA as required by the MOU 
(Section 8.2.3). In the last 23 U.S.C. 326 MOU monitoring review, FHWA 
observed this same practice and informed ADOT that such a practice was 
in non-compliance with the MOU. Just as that practice was in non-
compliance with the 23 U.S.C. 326 MOU, this practice is also in non-
compliance with the 23 U.S.C. 327 MOU.
Observation #1: Use of the Federal Infrastructure Permitting Dashboard
    The ADOT is responsible for inputting project information for 
assigned projects into the Federal Infrastructure Permitting Dashboard, 
per MOU Section 8.5.1. During the audit, the audit team reviewed the 
Permitting Dashboard and found that it did not include information for 
any of the applicable projects assigned to ADOT. The audit team 
confirmed during interviews that ADOT has not updated the dashboard. 
The audit team acknowledges that ADOT is working with FHWA to obtain 
access to the dashboard and address this issue.

Documentation and Records Management

    The audit team reviewed 12 projects as part of this audit. This 
consisted of four Individual CEs, one EA with a FONSI, two draft EAs, 
one EA initiated with scoping completed, one draft EIS, and three EA 
re-evaluations.

Successful Practices

    The ADOT EP has developed several standard templates (e.g., 
checklists, forms, etc.) to document various actions and decision-
points throughout the NEPA process. These are an effective tool for 
ADOT to consistently evaluate environmental resources and document 
decisions. Staff indicated that these templates have aided in 
streamlining the review process and provided consistency across 
projects.

Observations

Non-Compliance Observation #2: Project-Level Conformity Compliance 
Issues
    The statutory provisions of the NEPA Assignment Program, along with 
Section 3.2.1 of the MOU, prohibit ADOT from assuming the 
responsibility for making conformity determinations for projects 
processed under the 23 U.S.C. 327 MOU. However, pursuant to the Federal 
transportation conformity regulations at 40 CFR 93.105(c) and Section 
7.2.1 of the MOU, ADOT and FHWA Arizona Division can agree on 
procedures that allow ADOT to engage in activities to assist in this 
process and establish when and how consultation with FHWA must occur.
    The audit team reviewed ADOT's protocols for seeking FHWA's 
project-level conformity determinations, conducted a focused review of 
project-level conformity procedures on six projects, and interviewed 
ADOT, MAG, and EPA staff. The audit team found that ADOT had not given 
FHWA a chance to review and agree on the protocols and, as a result, 
the protocols do not provide for the appropriate consultation, 
coordination, and communication with FHWA and other agencies, such as 
EPA and MAG, to ensure the projects meet the project-level conformity 
requirements where required.
    The audit team found documentation for two projects showing that 
ADOT staff did not coordinate with FHWA on the application of 
conformity requirements and, by doing so, ADOT took actions that were 
not assigned to them. This failure to coordinate prevented FHWA from 
meeting its conformity determination responsibilities. The ADOT 
incorrectly concluded that the conformity requirements did not apply to 
one of the two projects because they assumed that the project would not 
trigger any FHWA approvals. The ADOT proceeded to complete NEPA without 
FHWA's conformity determination. This deficient approval prevents FHWA 
from authorizing the project until the conformity requirements are met. 
In another project, ADOT incorrectly determined that a widening project 
was exempt from project conformity under 40 CFR 93.126.
    The audit team found multiple projects that did not demonstrate 
ADOT's compliance with interagency consultation requirements, per 40 
CFR 93.105. The ADOT appears to have conducted some degree of 
interagency consultation but information on such consultation was not 
included in the project files. Therefore, it is unclear whether the 
interagency consultation agencies had an opportunity to participate in 
consultation or if ADOT provided them an opportunity to review and 
comment on the materials as required by 40 CFR 93.105 and MOU Section 
7.2.1. During interviews, EPA expressed concerns regarding how ADOT 
conducts project-level interagency consultation. Both EPA and MAG also 
felt that the interagency consultation is not fully transparent since 
ADOT does not: (1) Share comments with all interagency consultation 
agencies throughout the process; (2) provide responses to agency 
comments; and (3) consistently follow up with agencies to ensure their 
comments are adequately addressed. In cases where a project-level 
conformity determination is required, the interagency consultation 
process must meet the conformity rule requirements found in 40 CFR 
93.105.
    During interviews, ADOT staff did not demonstrate a full of 
understanding project-level conformity requirements. The audit team 
identified that ADOT staff were not aware that: (1) Certain FHWA 
approvals (in addition to Federal funding) may necessitate a project-
level conformity determination; (2) certain situations may require a 
redetermination of project-level conformity under 40 CFR 93.104(d); (3) 
the importance of specific traffic data requirements for the reviews; 
and (4) the public involvement requirements associated with project-
level conformity.
    The lack of agreed-upon interagency consultation procedures with 
clear roles, responsibilities, and coordination protocols, particularly 
between ADOT and FHWA, creates a significant risk of project schedule 
delays and, ultimately, project non-compliance. The ADOT should revise 
their procedures to be consistent with 40 CFR 93.105 and obtain 
agreement from FHWA to make sure the correct workflows are established, 
the responsibilities of FHWA are not curtailed, and that interagency 
consultation is transparent. Until agreed-upon protocols between FHWA 
and ADOT are in place, ADOT should consult with FHWA on all projects in 
non-attainment and maintenance areas to determine if conformity 
determination will be required for the project and the appropriate 
interagency consultation needed.
Observation #2: Inconsistencies and Deficiencies Based on the Review of 
Project File Documentation
    The audit team preliminarily identified several inconsistencies 
between ADOT's procedures for documenting project decisions (as 
identified in the ADOT CE Checklist Manual, ADOT EA/EIS Manual, ADOT 
QA/QC Plan, and ADOT Project Development Procedures Manual) and the 
incomplete project file documentation provided. Section 4.2.4 of the 
MOU specifies that ADOT must

[[Page 61385]]

implement documentation procedures to support appropriate environmental 
analysis and decision-making under NEPA and associated laws and 
regulations. The FHWA informed ADOT EP leadership during the audit week 
that project files were incomplete and, in response, ADOT submitted 
additional project files and supporting documentation. The ADOT was 
provided a second opportunity after the audit week to clarify 
inconsistences identified by the audit team and answer follow-up 
questions regarding the project documentation.
    After completing the project file review (including the 
supplemental information provided by ADOT), the audit team identified 
the following procedural deficiencies relating to the MOU and FHWA's 
regulations, policies, and guidance:
     One project did not include the disclosure statement on 
the DEIS cover page regarding the intent to combine the final EIS and 
record of decision (ROD) as identified in the January 14, 2013, interim 
guidance memorandum on MAP-21 Section 1319 Accelerated Decision making 
in Environmental Reviews.
     One corridor widening project did not demonstrate 
independent utility and logical termini as required in 23 CFR 
771.111(f)(1) and 23 CFR 771.111(f)(2).
     One project did not demonstrate that funding for the 
project is programmed beyond Fiscal Year 2019 and did not demonstrate 
that the project is identified on a current Statewide Transportation 
Improvement Program (STIP) per 23 CFR 771.113(a)(3).
    In addition, the audit team found several inconsistencies between 
ADOT's documentation of Section 4(f) determinations (as identified in 
ADOT's Section 4(f) procedures and FHWA Section 4(f) regulation and 
guidance) and the project file documentation. Due to the inadequate 
information provided, it is unclear how ADOT is implementing Section 
4(f) and how ADOT is complying with its Section 4(f) procedures. The 
audit team identified the following inconsistencies in project files 
relating to Section 4(f) evaluations and determinations:
     One project included a Section 106 no adverse effect 
finding and Section 4(f) no use determinations for six historic 
properties; however, ADOT did not provide any information demonstrating 
how they evaluated these resources under Section 4(f), or if they 
consulted the officials with jurisdiction over the resources.
     Two projects included a Section 106 finding of either 
adverse effect or no adverse effect, indicating the presence of 
potential Section 4(f) resources; however, ADOT did not provide any 
information demonstrating how they evaluated these resources under 
Section 4(f), or if they had consulted the officials with jurisdiction 
over the resources.
     One project included a Section 4(f) joint development 
determination but it is unclear what information ADOT used to support 
this determination (such as a master plan map or other planning 
information), or if they consulted the official with jurisdiction over 
the resource regarding potential impacts to the Section 4(f) resource.
     One project included a temporary occupancy determination 
and the description of the impact to the resource is inconsistent with 
the definition provided in 23 CFR 774.13(d)(3).
     One project stated that a Section 4(f) resource within the 
project area is jointly owned by two entities, but it is unclear if 
ADOT consulted with both officials with jurisdiction regarding the de 
minimis use since only one official with jurisdiction concurred with 
the de minimis use.
    The audit team acknowledges that ADOT is aware that implementation 
of Section 4(f) is an area in need of improvement and recognizes their 
efforts to update its procedures, including ADOT recently developing 
standard evaluation forms.

Quality Assurance/Quality Control (QA/QC)

    The audit team verified that ADOT has procedures in place for QA/QC 
which are described in the ADOT QA/QC Manual and ADOT Project 
Development Procedures Manual. The ADOT has developed QC checklists and 
forms to assist in implementing project-level QC procedures. During the 
project file reviews, the audit team noted some variation in how ADOT 
implements project-level QC procedures, and inconsistencies in how ADOT 
documents QC reviews. It was unclear how ADOT conducts thorough 
project-level QC reviews (completeness vs. accuracy), how ADOT corrects 
errors it identifies during QC reviews, and how the environmental 
planners coordinate with technical experts during QC reviews. Staff 
indicated during interviews that informal QC reviews are often 
conducted before QC checklists are completed, though it is unclear how 
this process is tracked to ensure comments are addressed. Due to these 
inconsistencies, the audit team was unable to fully assess the 
implementation of project-level QC procedures. The FHWA will continue 
to evaluate this program objective in subsequent audits.

Performance Measures

Observations

Observation #3: Incomplete Development and Implementation of 
Performance Measures
    The audit team reviewed ADOT's development and implementation of 
performance measures to evaluate their program as required in the MOU 
(Part 10.2.1). The ADOT's QA/QC Plan and self-assessment report 
identified several performance measures but both indicated that ADOT 
was still refining these measures and had not fully implemented them. 
The ADOT's PAIR response stated that ADOT has focused on tracking 
projects for schedule issues and has not begun gathering data for other 
performance measures. The self-assessment report did not include 
reporting data for any of the performance measures. The audit team 
confirmed during staff interviews that ADOT does not have data for its 
performance measures and is looking to further refine its performance 
measures. Due to the lack of performance measure data, the audit team 
determined that ADOT has not fully established and initiated data 
collection as it relates to performance metrics per the MOU.

Legal Sufficiency

    Through information provided by ADOT and an interview by the FHWA 
Office of Chief Counsel with an Assistant Attorney General (AAG) 
assigned to ADOT's NEPA Assignment program, the auditors determined 
ADOT had not conducted formal legal sufficiency reviews of assigned 
environmental documents during the audit period. Currently, ADOT 
retains the services of two AAGs for NEPA Assignment reviews and 
related matters. The assigned AAGs have received formal and informal 
training in environmental law matters. The ADOT also has the ability to 
retain outside counsel to review projects or conduct litigation should 
the need arise.

Successful Practice

    Through the interview, the audit team learned ADOT seeks to involve 
lawyers early in the environmental review phase, with AAGs 
participating in project coordination team meetings and reviews of 
early drafts of environmental documents. In addition, ADOT and the AGO 
have a process in place by which ADOT can request written legal 
opinions and advice from an AAG on environmental review legal matters. 
For formal reviews, the process would

[[Page 61386]]

include a formal transmittal memo from an ADOT environmental manager, a 
review package (hard copy or electronic), and a completed ADOT EA/EIS 
Quality Control Checklist.

Training

    The audit team reviewed ADOT's 2020 Training Plan and ADOT's PAIR 
responses pertaining to its training program. The ADOT's training 
program includes in-house, web-based, and instructor-led courses 
training opportunities for staff. Since assuming NEPA responsibilities, 
ADOT has held several formal training courses and plans to continue 
these efforts during the upcoming year. The ADOT provides new hires 
with structured onboarding training which includes coaching, mentoring, 
and collaborative on-the-job training to facilitate professional 
development. The ADOT EP Training Officer tracks staff training needs 
and completion of courses and updates this document quarterly. Staff 
remarked during interviews on the availability of training offered to 
them and opportunities to travel out of State for specialty technical 
courses.

Successful Practices

    The audit team commends ADOT for developing a detailed training 
plan and committing resources to provide training opportunities for 
staff. The ADOT EP encourages staff to pursue individual training 
interests and has undertaken efforts to ensure staff maintains 
professional certifications. The ADOT EP has developed a web-based 
training course for staff as an introduction to NEPA Assignment. To 
further support the training program, ADOT EP utilizes a dedicated 
training coordinator within the environmental section.

Finalizing This Report

    The FHWA published a draft version of this report in the Federal 
Register on December 28, 2020 (85 FR 84454), and made it available for 
public review and comment for 30 days in accordance with 23 U.S.C. 
327(g). The FHWA received two responses to the Federal Register notice 
during the public comment period for the draft report. One comment was 
submitted by ADOT. The nature of ADOT's comment was substantially the 
same as those provided by ADOT during their preliminary review of the 
draft report which were considered in developing the draft report. The 
FHWA considered this additional comment from ADOT and determined no 
changes were needed to the content of the report since the comment had 
been previously considered in the draft report. The final version of 
the audit report reflects consideration of all of ADOT's comments. The 
second comment from the American Road and Transportation Builders 
Association expressed their support of the program and did not require 
any changes to the content of the report. This is FHWA's final version 
of the audit report.
    The FHWA acknowledges that ADOT has begun to address some of the 
observations identified in this report and recognizes ADOT's efforts 
toward improving their program. The FHWA will consider the results of 
this audit in preparing the scope of the next annual audit. The next 
audit report will include a summary that describes the status of ADOT's 
corrective and other actions taken in response to this audit's 
conclusions.
[FR Doc. 2021-24215 Filed 11-4-21; 8:45 am]