Notice of Final Federal Agency Actions on Proposed Highway in Vermont |
|---|
|
Kenneth R. Sikora, Jr.
Federal Highway Administration
October 13, 2010
[Federal Register: October 13, 2010 (Volume 75, Number 197)]
[Notices]
[Page 62919]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr13oc10-129]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice of Final Federal Agency Actions on Proposed Highway in
Vermont
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of limitation on claims for judicial review of actions
by FHWA.
-----------------------------------------------------------------------
SUMMARY: This notice announces actions taken by the FHWA that are final
within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a
proposed highway project, the Southern Connector/Champlain Parkway in
the City of Burlington, Chittenden County, Vermont. Those actions grant
approvals for the project.
DATES: By this notice, the FHWA is advising the public of final agency
actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review
of the Federal agency actions on the highway project will be barred
unless the claim is filed on or before April 11, 2011. If the Federal
law that authorizes judicial review of a claim provides a time period
of less than 180 days for filing such claim, then that shorter time
period still applies.
FOR FURTHER INFORMATION CONTACT: For FHWA: Mr. Kenneth R. Sikora, Jr.,
Environmental Program Manager, Federal Highway Administration, P.O. Box
568, Montpelier, Vermont 05601-0568; telephone: (802) 828-4573; e-mail:
Kenneth.Sikora@dot.gov. The FHWA Vermont Division Office's normal
business hours are 8 a.m. to 4:30 p.m. (eastern time). For the Vermont
Agency of Transportation: Mr. Wayne Davis, Project Supervisor, Vermont
Agency of Transportation, One National Life Drive, Montpelier, Vermont
05633; telephone: (808) 828-5609; e-mail: Wayne.Davis@state.vt.us. The
Vermont Agency of Transportation's normal business hours are 7:45 a.m.
to 4:30 p.m. (eastern time).
SUPPLEMENTARY INFORMATION: Notice is hereby given that the FHWA, has
taken final agency actions subject to 23 U.S.C. 139(l)(1) by issuing
approvals for the following highway project in the State of Vermont:
the Southern Connector/Champlain Parkway, Federal-aid Project Number
MEGC-M5000(1), in the City of Burlington, Chittenden County. The
project will consist of approximately 2.3 miles of a two-lane roadway
with turning lanes on both new location and existing roadways. The
project will begin at the western terminus of I-189 at Shelburne Street
(U.S. Route 7) and will extend westerly and then northerly to the City
Center District (CCD) at the intersection of Pine Street and Main
Street. The general purposes of the project are to improve access from
the vicinity of the interchange of I-189 and U.S. Route 7 to the
Burlington CCD and the downtown waterfront area; and to improve
circulation, reduce congestion, and improve safety on the local
roadways in the project study area. The project includes a section of
previously constructed roadway that has never been opened to traffic,
new alignment from the end of the previously constructed section to
Lakeside Avenue, and existing roadway along Lakeside Avenue and Pine
Street. The actions by the Federal agencies, and the laws under which
such actions were taken, are described in the Final Supplemental
Environmental Impact Statement (FSEIS) for the project, approved on
September 22, 2009, in the FHWA Record of Decision (ROD) issued on
January 13, 2010, and in other documents in the FHWA project files. The
FSEIS, ROD, and other project records are available by contacting the
FHWA or the Vermont Agency of Transportation at the addresses provided
above. The FHWA FSEIS and ROD can also be viewed and downloaded from
the project Web site at http://www.aot.state.vt.us/progdev/Sections/
LTF/SouthernConnectorSEIS/SouthernConnectorFSEIS.htm.
This notice applies to all Federal agency decisions as of the
issuance date of this notice and all laws under which such actions were
taken, including but not limited to:
1. General: National Environmental Policy Act (NEPA) [42 U.S.C.
4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128].
2. Land: Section 4(f) of the Department of Transportation Act of
1966 [49 U.S.C. 303].
3. Historic and Cultural Resources: Section 106 of the National
Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et
seq.].
4. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 12898,
Federal Actions to Address Environmental Justice in Minority
Populations and Low Income Populations.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Authority: 23 U.S.C. 139(l)(1).
Issued on: October 6, 2010.
Kenneth R. Sikora, Jr.,
Environmental Program Manager, Montpelier, Vermont.
[FR Doc. 2010-25696 Filed 10-12-10; 8:45 am]
BILLING CODE 4910-RY-P