The Implementation of Full Depth UHPC Waffle Bridge Deck Panels |
---|
|
Page Sections
Video |
Duration: 3:57 Highways for Life. Video documenting the process of setting up, batching, casting, and stripping the first Ductal waffle slab specimen for the FHWA Highways for LIFE Technology Partnerships Program. The production of the first slab occurred on September 15, 2009. Download The Implementation of Full Depth UHPC Waffle Bridge Deck Panels from The Internet Archive |