Notice of Final Federal Agency Actions on the West Davis Corridor Project, Davis and Weber County, Utah


American Government Topics:  Interstate Highway System

Notice of Final Federal Agency Actions on the West Davis Corridor Project, Davis and Weber County, Utah

Ivan Marrero
Environmental Protection Agency
6 October 2017


[Federal Register Volume 82, Number 193 (Friday, October 6, 2017)]
[Notices]
[Pages 46881-46882]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21561]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Notice of Final Federal Agency Actions on the West Davis Corridor 
Project, Davis and Weber County, Utah

AGENCY: Federal Highway Administration (FHWA), DOT.

ACTION: Notice of Limitation on Claims for Judicial Review of Actions 
by FHWA.

-----------------------------------------------------------------------

SUMMARY: This notice announces actions taken by the FHWA. The actions 
relate to a proposed highway project, West Davis Corridor (Project S-
0067(14)0) starting in Centerville, Utah and ending in West Point, Utah 
in Davis County, Utah. Those actions grant licenses, permits, and 
approvals for the project.

DATES: By this notice, the FHWA is advising the public of final agency 
actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review 
of the Federal agency actions on the highway project will be barred 
unless the claim is filed on or before March 5, 2018. If the Federal 
law that authorizes judicial review of a claim provides a time period 
of less than 150 days for filing such claim, then that shorter time 
period still applies.

FOR FURTHER INFORMATION CONTACT: For FHWA contact Paul Ziman, Area 
Manager, Federal Highway Administration, 2520 West 4700 South, Suite 
9A, Salt Lake City, UT 84118, Telephone: (801) 955-3525, Email: 
Paul.Ziman@dot.gov. The Utah Department of Transportation (UDOT) 
contact is Randy Jefferies, Project Manager, 166 Southwell Street 
Ogden, UT 84404, Telephone: (801) 620-1690, Email: rjefferies@utah.gov.

SUPPLEMENTARY INFORMATION: Notice is hereby given that FHWA has taken 
final agency action subject to 23 U.S.C. 139(l)(1) by issuing an 
approval for the following highway project in the State of Utah. The 
primary purposes of the West Davis Corridor project are to reduce delay 
and congestion in western Davis and Weber Counties. As proposed the 
project is about 19 miles and would be a four-lane divided highway with 
a 250-foot right-of-way width from I-15 in Farmington to Antelope Drive 
in Davis County. From Antelope Drive to 1800 North in West Point, the B 
Alternatives would be a 146-foot-wide, limited-access, two-lane 
highway. The action of approval by FHWA and the laws under which such 
actions were taken, are described in the Final Environmental Impact 
Statement (FEIS) for the project, approved on June 23, 2017, in the 
FHWA Record of Decision (ROD) issued

[[Page 46882]]

on September 29, 2017, and in other documents in the project records. 
The FEIS and ROD and other project records are available by contacting 
FHWA and UDOT at the addresses provided above. The FEIS and ROD can be 
viewed and downloaded from the project Web site at http://www.udot.utah.gov/westdavis/, or obtained from any contact listed 
above.
    This notice applies to all Federal agency decisions that are final 
as of the issuance date of this notice and all laws under which such 
actions were taken, including but not limited to:
    1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 
4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128].
    2. Air: Clean Air Act [42 U.S.C. 7401-7671q].
    3. Land: Section 4(f) of the Department of Transportation Act of 
1966 [49 U.S.C. 303; 23 U.S.C. 138].
    4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and 
Section 1536]; Marine Mammal Protection Act [16 U.S.C. 1361-1423h]; 
Fish and Wildlife Coordination Act [16 U.S.C. 661-667d]; Migratory Bird 
Treaty Act [16 U.S.C. 703-712].
    5. Historic and Cultural Resources: Section 106 of the National 
Historic Preservation Act of 1966, as amended [16 U.S.C. 470f]; 
Archeological Resources Protection Act of 1977 [16 U.S.C. 470aa-470mm]; 
Archeological and Historic Preservation Act [16 U.S.C. 469-469c]; 
Native American Grave Protection and Repatriation Act (NAGPRA) [25 
U.S.C. 3001-3013].
    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 
2000(d)- 2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 
1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
    7. Wetlands and Water Resources: Land and Water Conservation Fund 
(LWCF) [16 U.S.C. 4601-4604]; Safe Drinking Water Act (SDWA) [42 U.S.C. 
300f-300j-26)]; Wild and Scenic Rivers Act [16 U.S.C. 1271-1287].
    8. Hazardous Materials: Comprehensive Environmental Response, 
Compensation, and Liability Act (CERCLA) [42 U.S.C. 9601-9675]; 
Superfund Amendments and Reauthorization Act of 1986 (SARA); Resource 
Conservation and Recovery Act (RCRA) [42 U.S.C. 6901-6992(k)]
    9. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 
Floodplain Management; E.O. 12898, Federal Actions to Address 
Environmental Justice in Minority Populations and Low Income 
Populations; E.O. 11593 Protection and Enhancement of Cultural 
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; 
E.O. 13175 Consultation and Coordination with Indian Tribal 
Governments; E.O. 11514 Protection and Enhancement of Environmental 
Quality; E.O. 13112 Invasive Species.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction. The regulations implementing 
Executive Order 12372 regarding intergovernmental consultation on 
Federal programs and activities apply to this program.)

    Authority:  23 U.S.C. 139(l)(1).

    Issued on: October 2, 2017.
Ivan Marrero,
Division Administrator, Federal Highway Administration, Salt Lake City, 
Utah.
[FR Doc. 2017-21561 Filed 10-5-17; 8:45 am]
 BILLING CODE 4910-RY-P