Home Page American Government Reference Desk Shopping Special Collections About Us Contribute



Escort, Inc.






GM Icons
By accessing/using The Crittenden Automotive Library/CarsAndRacingStuff.com, you signify your agreement with the Terms of Use on our Legal Information page. Our Privacy Policy is also available there.

Interstate Highway System


Interstate Highway System


Topic Navigation
Wikipedia: Interstate Highway System

Page Sections
History
Bibliography
Article Index

Interstate Highways 4, 5, 8, 10, 11, 12, 15, 17, 19, 20, 24, 25, 26, 30, 35, 39, 40, 41, 43, 45, 49, 55, 57, 64, 65, 66, 69, 70, 73, 74, 75, 77, 80, 81, 83, 84, 85, 86, 87, 88, 90, 91, 93, 94, 95, 101, 110, 126, 190, 215, 240, 244, 264, 269, 270, 275, 279, 280, 285, 287, 355, 375, 395, 405, 435, 440, 465, 469, 495, 526, 540, 575, 580, 595, 605, 635, 664, 680, 695, 710, 759, 805, 880, 895, IH-3
A network of highways in the United States, originally authorized with the Federal Aid Highway Act of 1956.  Interstate Highway System is the common name for what is formally known as the Dwight D. Eisenhower National System of Interstate and Defense Highways.

History

The following section is an excerpt from Wikipedia's Interstate Highway System page on 9 May 2018, text available via the Creative Commons Attribution-ShareAlike 3.0 Unported License.

The United States government's efforts to construct a national network of highways began on an ad hoc basis with the passage of the Federal Aid Road Act of 1916, which provided for $75 million over a five-year period for matching funds to the states for the construction and improvement of highways. The nation's revenue needs associated with World War I prevented any significant implementation of this policy, which expired in 1921.

In December 1918, E. J. Mehren, a civil engineer and the editor of Engineering News-Record, presented his "A Suggested National Highway Policy and Plan" during a gathering of the State Highway Officials and Highway Industries Association at the Congress Hotel in Chicago. In the plan, Mehren proposed a 50,000-mile (80,000 km) system, consisting of five east–west routes and 10 north–south routes. The system would include two percent of all roads and would pass through every state at a cost of $25,000 per mile ($16,000/km), providing commercial as well as military transport benefits.

As the landmark 1916 law expired, new legislation was passed—the Federal Aid Highway Act of 1921 (Phipps Act). This new road construction initiative once again provided for federal matching funds for road construction and improvement, $75 million allocated annually. Moreover, this new legislation for the first time sought to target these funds to the construction of a national road grid of interconnected "primary highways", setting up cooperation among the various state highway planning boards.

The Bureau of Public Roads asked the Army to provide a list of roads that it considered necessary for national defense. In 1922, General John J. Pershing, former head of the American Expeditionary Force in Europe during the war, complied by submitting a detailed network of 20,000 miles (32,000 km) of interconnected primary highways—the so-called Pershing Map.

A boom in road construction followed throughout the decade of the 1920s, with such projects as the New York parkway system constructed as part of a new national highway system. As automobile traffic increased, planners saw a need for such an interconnected national system to supplement the existing, largely non-freeway, United States Numbered Highways system. By the late 1930s, planning had expanded to a system of new superhighways.

In 1938, President Franklin D. Roosevelt gave Thomas MacDonald, chief at the Bureau of Public Roads, a hand-drawn map of the United States marked with eight superhighway corridors for study. In 1939, Bureau of Public Roads Division of Information chief Herbert S. Fairbank wrote a report called Toll Roads and Free Roads, "the first formal description of what became the interstate highway system" and, in 1944, the similarly themed Interregional Highways.

The Interstate Highway System gained a champion in President Dwight D. Eisenhower, who was influenced by his experiences as a young Army officer crossing the country in the 1919 Army Convoy on the Lincoln Highway, the first road across America. Eisenhower gained an appreciation of the Reichsautobahn system, the first "national" implementation of modern Germany's Autobahn network, as a necessary component of a national defense system while he was serving as Supreme Commander of the Allied forces in Europe during World War II. He recognized that the proposed system would also provide key ground transport routes for military supplies and troop deployments in case of an emergency or foreign invasion.

The publication in 1955 of the General Location of National System of Interstate Highways, informally known as the Yellow Book, mapped out what became the Interstate System. Assisting in the planning was Charles Erwin Wilson, who was still head of General Motors when President Eisenhower selected him as Secretary of Defense in January 1953.


Bibliography

Title & SubtitleDetails
American Autobahn
The Road To An Interstate Freeway With No Speed Limit
Year & Type: 1999 Nonfiction
Author: Mark Rask
Illustrator: Mark Stehrenberger
Publisher: Vanguard Non-Fiction Books
Dimensions: 6.25" x 9.25" hardcover w/jacket
Content: 296 pages with color illustration section
ISBN: 0-9669136-0-4
Subject: Roads & Highways
Topic: Interstate Highway System
Availability: Reference Desk


Article Index

DateArticleAuthor/Source
10 July 2004US Interstate Highway System Celebrates 50 Years Ted Landphair, VOA News
25 June 2006Vast Interstate Highway System Marks Half a Century Ted Landphair, VOA News
28 January 2008Tolls - Watch it!!!Gus Philpott, The Woodstock Advocate
12 June 2008Backing on the InterstateGus Philpott, The Woodstock Advocate
27 August 2008Tollway Speed Survey ResultsGus Philpott, The Woodstock Advocate
11 September 2008Stop Entering the TollwayGus Philpott, The Woodstock Advocate
10 July 2009No good deed goes unpunishedGus Philpott, The Woodstock Advocate
1 July 2010What is the Interstate? The History of Interstate Car TransportMark Etinger
2 July 2011I-Pass adviceGus Philpott, The Woodstock Advocate
1 August 2011Illinois Tollway – what “competitive advantage”?Gus Philpott, The Woodstock Advocate
25 August 2011Tollway rate hike decision?Gus Philpott, The Woodstock Advocate
17 October 2011Driver at risk in Tollway work zoneGus Philpott, The Woodstock Advocate
2 March 2012Toll collector earns $3500/month!Gus Philpott, The Woodstock Advocate
27 March 2013Tollway rip-offGus Philpott, The Woodstock Advocate
27 March 2013Tollway stupidityGus Philpott, The Woodstock Advocate
29 March 2013Indiana figures out how to rip off driversGus Philpott, The Woodstock Advocate
18 July 2013Empire building continuesGus Philpott, The Woodstock Advocate


Documents

DateDocument Name & DetailsDocuments
30 June 1970
publication date
Problems Resulting From Deterioration Of Pavement On The Interstate Highway SystemGeneral Accounting OfficePDF - 7,757KB - 91 pages
May 2005
publication date
Successes in Stewardship The Interstate Highway System 106 Exemption: Maintaining a Unique Resource
Federal Highway Administration
HTML - 1 page
27 June 2006
hearing date
Celebrating 50 Years: The Eisenhower Interstate Highway System
Hearing Before the Subcommittee on Highways, Transit and Pipelines of the Committee on Transportation and Infrastructure
U.S. House of Representatives

PDF
- 1.8MB - 68 pages


Interstate 4

DateArticleAuthor/Source
27 January 2012U.S. Transportation Secretary Ray LaHood Reviews Progress on I-4 Connector, Echoes President Obama's Call for Job Creation as Part of "An America Built to Last"FHWA
28 December 2013Federal Highway Deputy Administrator Nadeau Joins in Ribbon Cutting for I-4 ConnectorFHWA
9 September 2014U.S. Transportation Secretary Foxx Announces $950 Million TIFIA Loan to Rebuild and Widen Key Segment of Florida's I-4FHWA
10 December 2015I-4 Ultimate Wins International Award at P3 Awards CeremonyThe Transtec Group
16 June 2020U.S. Department of Transportation Awards $10 Million to Florida’s I-4 FRAME ProjectFHWA
28 September 2020Notice of Final Federal Agency Actions on Proposed Highway in FloridaFederal Register: FHWA (Karen M. Brunelle)


Interstate 5

DateMedia or Collection Name & DetailsFiles
18 December 2017Amtrak derails in Washington State
VOA News

Article Page
- 12.1MB - 0:38


DateDocument Name & DetailsDocuments
August 2009Successes in Stewardship The Columbia River Crossing Project: A Model for Collaboration and Environmental Stewardship
Federal Highway Administration

PDF
- 50KB - 3 pages


DateArticleAuthor/Source
12 December 2001I-5 Trip Down Memory LanePershingPhotos
9 July 2008Two of Nation's Busiest Interstates Will Get $11 Million for Truck Parking InnovationsFHWA
10 August 2010Federal Highway Administrator Mendez Helps Launch Smarter Highways on I–5 in SeattleFHWA
30 September 2010Notice of Extension for the Comment PeriodCindy Vigue
5 October 2010Safety Zone; Interstate 5 Bridge Repairs, Columbia River, Portland, ORD.E. Kaup
6 July 2011Construction on the Interstate 5 Willamette River Bridge Progresses Ahead of Schedule, Federal Highway Administrator Mendez Receives UpdateFHWA
18 July 2011Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaManuel E. Sánchez
29 July 2011Notice of Final Federal Agency Actions on I-5: Fern Valley Interchange Project: Jackson County, ORMichelle Eraut
23 August 2011FHWA Administrator Joins in Groundbreaking for Baldock Solar HighwayFHWA
7 September 2011Notice of Final Federal Agency Actions on Proposed Highway in WashingtonDaniel M. Mathis
7 December 2011U.S. Department of Transportation Gives Green Light for I-5 Columbia River CrossingFHWA
20 August 2012Notice of Final Federal Agency Actions on Project: I-5: Glendale-Hugo Paving/Sexton Climbing Lane: Douglas and Josephine Counties, ORMichelle Eraut
24 May 2013Bridge Collapses in Washington State, No FatalitiesVOA News
17 June 2013Availability of Application for the Proposal To Replace the Existing Movable I-5 Bridge Across the Columbia River With a Fixed Multi-Use Bridge Which Will Accommodate Vehicular, Light Rail, Pedestrian and Bicycle Traffic and Will Be Called the Columbia River Crossing; CorrectionBrian L. Dunn
18 June 2013U.S. Secretary of Transportation LaHood Announces $15.6 Million for Repairs to I-5 Skagit River Bridge in WashingtonFHWA
26 July 2013Federal Highway Administrator Mendez Takes Part in Ceremonial Ribbon Cutting of I-5 Whilamut Passage BridgeFHWA
1 July 2014Sunshine Act MeetingFederal Register: NTSB (Candi R. Bing)
23 October 2015Buy America Waiver NotificationFederal Register: FHWA (Gregory G. Nadeau)
13 June 2016Buy America Waiver NotificationFederal Register: FHWA (Gregory G. Nadeau)
20 December 2016Notice of Final Federal Agency Actions on Franklin Boulevard: I-5--McVay Highway. City of Springfield, Lane County, ORFederal Register: FHWA (Phillip A. Ditzler)
23 June 2017Notice of Final Federal Agency Actions on Proposed Highway in WashingtonFederal Register: FHWA (Daniel M. Mathis)
14 September 2017Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Tashia J. Clemons)
14 September 2017Notice of Final Federal Agency Actions of Proposed Highway/Interchange Improvement in California; Statute of Limitations on ClaimsFederal Register: FHWA (Tashia J. Clemons)
18 December 2017Train Derails in Washington State Causing 'Multiple Fatalities' VOA News
19 December 2017Cranes Lift Cars from Derailed Train Near SeattleVOA News
22 December 2017Safety Board: Engineer Remarked on Train Speed 6 Seconds Before CrashVOA News
9 July 2018Shasta-Trinity National Forest; California; I-5 Corridor Fuels Reduction ProjectFederal Register: USDA (Chris French)
6 September 2018New Wildfire Closes Major California FreewayVOA News
9 September 2018Wildfire Keeps Major California Highway ClosedVOA News
31 October 2018Notice of Final Federal Agency Actions of Proposed Highway in CaliforniaFederal Register: FHWA (Tashia J. Clemons)
27 November 2018Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Matthew Schmitz)
22 July 2019Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Tashia J. Clemons)
12 November 2019Notice of Final Federal Agency Actions on Transportation Project in Washington StateFederal Register: FHWA (Daniel M. Mathis)
30 March 2020Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Tashia J. Clemons)
22 June 2020Safety Zone; I-5 Bridge Construction Project, Columbia River, Vancouver, WAFederal Register: DHS (J.C. Smith)
29 September 2020Safety Zone; I-5 Bridge Construction Project, Columbia River, Vancouver, WAFederal Register: DHS (J.C. Smith)
6 November 2020Notice of Final Federal Agency Actions on I-5 Rose Quarter Improvement Project in City of Portland, Multnomah County, OregonFederal Register: FHWA (Phillip A. Ditzler)
8 February 2022Rescission of Finding of No Significant Impact for the I-5 Rose Quarter Improvement Project in Portland, Oregon
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Phillip A. Ditzler
Topic: Interstate Highway System
12 December 2022Notice of Final Federal Agency Actions on Proposed Highway in California
The actions relate to a proposed highway project on the Interstate 5 and State Route 56 from postmile I-5: R32.7 to R34.8 and SR 56: 0.00 to 2.5 in the County of San Diego, State of California.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Antonio Johnson
Topic: Interstate Highway System
5 April 2023Supplemental Environmental Impact Statement for the Interstate Bridge Replacement Program
The FHWA and FTA are issuing this notice to advise other Federal, State, and local agencies, Tribes, and the public that a Supplemental Environmental Impact Statement will be prepared in accordance with the National Environmental Policy Act for the Interstate Bridge Replacement Program for proposed highway and high-capacity transit improvements between Portland, Oregon, and Vancouver, Washington, across the Columbia River in the Interstate 5 corridor.
Federal Register Notice (text)
Agencies: Federal Highway Administration & FTA
Byline: Ralph J. Rizzo, Keith Lynch, Susan K. Fletcher
Topic: Interstate Highway System


Interstate 8

DateMedia or Collection Name & DetailsFiles
24 June 201308-99017 Dickens v. Ryan
United States Court of Appeals for the Ninth Circuit

Misc. Video Page
- 171MB - 1:11:12


Interstate 10

DateArticleAuthor/Source
8 September 2011Nation's Top Highway Official on Hand for Opening of New I-10 Twin Span BridgesFHWA
15 February 2012FHWA Administrator Mendez Reviews Progress on I-10 ProjectFHWA
24 April 2012FHWA Administrator Mendez Joins Governor Martinez to Break Ground on I-10/I-25 Interchange ProjectFHWA
24 April 2012Governor Susana Martinez, FHWA Administrator Victor Mendez and State Transportation Officials Break Ground on I-10/I-25 Interchange Project in Las CrucesNew Mexico Department of Transportation
8 May 2012Traffic Alert: I-10 Motel Blvd, Las Cruces, New MexicoNew Mexico Department of Transportation
23 May 2012PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange, Las Cruces, NMNew Mexico Department of Transportation
24 May 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
1 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
7 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
12 June 2012Traffic Alert: I-10 Motel Blvd Las Cruces, New MexicoNew Mexico Department of Transportation
15 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
22 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
26 June 2012PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange Las Cruces, NMNew Mexico Department of Transportation
29 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
12 July 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
19 July 2012PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange Las Cruces, NMNew Mexico Department of Transportation
25 July 2012Traffic Alert: I-10/Motel Blvd (NM-292) Las Cruces, New MexicoNew Mexico Department of Transportation
27 July 2012Traffic Alert: I-10/I-25 Las Cruces, New MexicoNew Mexico Department of Transportation
6 August 2012Traffic Alert: I-25/I-10 Las Cruces, New MexicoNew Mexico Department of Transportation
28 August 2012Traffic Alert: I-10/I-25 Las Cruces, New MexicoNew Mexico Department of Transportation
26 October 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
29 October 2012I-10 Speed Limit IncreaseNew Mexico Department of Transportation
16 November 2012UPDATE: Traffic Alert: I-10/I-25 System InterchangeNew Mexico Department of Transportation
17 December 2012Notice To Rescind a Notice of Intent and Draft Environmental Impact Statement: I-10 Corridor Improvement Study; Maricopa County, AZKarla S. Petty
22 February 2013FHWA Administrator Victor Mendez Joins Los Angeles Mayor for the Opening of New Express Lanes on the I-10 San Bernardino FreewayFHWA
13 March 2013Traffic Alert: I-10 Gage Rest Area West of Deming, New MexicoNew Mexico Department of Transportation
25 March 2013PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange Las Cruces, NMNew Mexico Department of Transportation
2 July 2013PUBLIC INVOLVEMENT MEETING: I-10/Avenida de Mesilla Las Cruces, NMNew Mexico Department of Transportation
26 July 2013Traffic Alert: I-10/Avenida de Mesilla Exit 141 and NM-28 Las Cruces, NMNew Mexico Department of Transportation
20 August 2013PUBLIC INVOLVEMENT MEETING: I-10/Avenida de Mesilla Las Cruces, NMNew Mexico Department of Transportation
11 October 2013I-10 and Avenida de Mesilla Utility WorkNew Mexico Department of Transportation
27 March 2014Project Information Meeting I-10/Mesquite and I-10/Vado Interchange Mesquite, NMNew Mexico Department of Transportation
1 April 2014Public Meeting for I-10/Avenida de Mesilla Las Cruces, NMNew Mexico Department of Transportation
28 April 2014I-10/Avenida de Mesilla Overnight ClosuresNew Mexico Department of Transportation
30 April 2014I-10 Avenida de Mesilla Overnight Closures For Friday and Saturday Revised - Traffic AlertNew Mexico Department of Transportation
23 May 2014I-10 Avenida de Mesilla Overnight ClosuresNew Mexico Department of Transportation
30 May 2014Project Information Meeting: I-10/Mesquite and I-10/Vado Interchange Mesquite, NMNew Mexico Department of Transportation
27 June 2014Project Information Meeting I-10/Mesquite & I-10/Vado InterchangeNew Mexico Department of Transportation
31 July 2014I-10 Avenida de Mesilla Ramp ClosureNew Mexico Department of Transportation
1 August 2014Project Information Meeting: I-10/Mesquite and I-10/Vado InterchangeNew Mexico Department of Transportation
29 August 2014Project Information Meeting I-10/Mesquite and I-10/Vado InterchangeNew Mexico Department of Transportation
4 September 2014I-10/Mesquite & Vado Bridge InterchangeNew Mexico Department of Transportation
30 September 2014Project Information Meeting: I-10/Mesquite and I-10/Vado InterchangeNew Mexico Department of Transportation
1 October 2014I-10 Las Cruces Southern New Mexico State FairNew Mexico Department of Transportation
14 October 2014I-10 Mesquite and Vado Ramp ClosureNew Mexico Department of Transportation
3 December 2014Project Information Meeting I-10/Mesquite and I-10/Vado InterchangeNew Mexico Department of Transportation
13 January 2015I-10 Vado Interchange Ramp ClosureNew Mexico Department of Transportation
3 February 2015Project Information Meeting I-10/Mesquite and I-10/Vado InterchangeNew Mexico Department of Transportation
23 February 2015I-10/Vado Interchange Closure at NM 227New Mexico Department of Transportation
26 February 2015Public Involvement Meeting I-10/Mesquite and I-10/Vado InterchangeNew Mexico Department of Transportation
9 July 2015I-10/University Ramp E Bridge RampNew Mexico Department of Transportation
23 July 2015U.S. Department of Transportation Announces $2 Million in Emergency Relief Funds For California’s Flood-Damaged I-10 BridgeFHWA
5 August 2015I-10/Union-University Public Involvement MeetingNew Mexico Department of Transportation
11 August 2015Update for Union Ave. Closure August 15 and 16, 2015New Mexico Department of Transportation
14 August 2015Update for Union Ave. Closure In Las Cruces August 15 and August 16New Mexico Department of Transportation
26 August 2015Update for Union Ave. Closure August 29 & 30New Mexico Department of Transportation
3 September 2015I-10/Union-University Public Involvement MeetingNew Mexico Department of Transportation
9 October 2015I-10/Union-University Public Involvement MeetingNew Mexico Department of Transportation
27 October 2015Westbound Lane Closure I-10, Exit 85 BridgeNew Mexico Department of Transportation
29 October 2015Eastbound Lane Closure on I-10 On-Ramp, Main Street Over Union Bridge ExitNew Mexico Department of Transportation
3 November 2015I-10/Union-University Public Involvement MeetingNew Mexico Department of Transportation
2 December 2015I-10/Union-University Public Involvement MeetingNew Mexico Department of Transportation
3 October 2016Revise Notice of Intent for an Environmental Impact Statement: North-South Corridor Study: Interstate 10 to U.S. Highway 60, Pinal County, ArizonaFederal Register: FHWA (Karla S. Petty)
6 December 2016Six-Month Guarantee to Solve Controversial I-10 Dust Problem with Gorilla-Snot Proves to be a Success for Scottsdale Dust Control Company SoilworksSoilworks
12 May 2017Tier 1 Environmental Impact Statement (EIS) for the Sonoran Corridor Between Interstate 10 (I-10) and Interstate 19 (I-19) South of Tucson International Airport in Pima County, ArizonaFederal Register: FHWA (Karla S. Petty)
5 June 2017Environmental Impact Statement; Mobile and Baldwin Counties, AlabamaFederal Register: FHWA (Mark D. Bartlett)
1 August 2017Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Shawn E. Oliver)
10 October 2017Sunshine Act MeetingFederal Register: NTSB (Candi R. Bing)
5 July 2018Interstate 10 (Mile post 96)New Mexico Department of Transportation
14 August 2018Interstate 10 (Mile Post 133 to 164)New Mexico Department of Transportation
28 August 2018Rescinding the Notice of Intent for an Environmental Impact Statement; Multiple Counties, AlabamaFederal Register: FHWA (Mark Bartlett)
21 December 2018Notice of Final Federal Agency Actions on State Route 303 Loop, State Route 30 to Interstate 10 (Papago Freeway) in Goodyear, AZFederal Register: FHWA (Karla S. Petty)
1 April 2019U.S. Department of Transportation Awards Nearly $7 Million Grant to Texas for I-10 Truck Parking Availability SystemFHWA
30 August 2019Notice of Final Federal Agency Action on the I-10 Mobile River Bridge and Bayway Project in AlabamaFederal Register: FHWA (Mark D. Bartlett)
5 June 2020Notice of Final State Agency Actions Under 23 U.S.C. 327 on Interstate 10 Broadway Curve, Interstate 17 (Split) to Loop 202 (Santan Freeway) in Maricopa County, AZFederal Register: FHWA (Karla S. Petty)
1 September 2020Notice of Final State Agency Actions on Interstate 10--State Route 210 in Pima County, AZFederal Register: FHWA (Karla S. Petty)
13 January 2021Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)
21 January 2021Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)
5 February 2021Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)
1 March 2021Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)
5 October 2021Notice of Final Federal Agency Actions on Proposed Highway in California
The actions relate to a proposed highway project, Interstate 10/Jackson Street Interchange between Monroe Street and 0.4 miles west of Golf Center Parkway at PM R54.9/R56.5 in the City of Indio.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Rodney Whitfield
Topic: Interstate Highway System
15 November 2021Notice of Final Actions for the Tier 1 Environmental Impact Statement (EIS) for the Sonoran Corridor Between Interstate 19 (I-19) and Interstate 10 (I-10), South of the Tucson International Airport in Pima County, Arizona
The actions relate to the Tier 1 EIS study associated with the Sonoran Corridor between I-19 and I-10, south of the Tucson International Airport in Pima County, Arizona.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Karla S. Petty
Topic: Interstate Highway System
17 November 2021Notice of Final Federal Agency Actions on Proposed Roadway in California
The actions relate to a proposed roadway project, the I-10 Bypass: Banning to Cabazon Project from the intersection of Hathaway Street and Westward Avenue in the City of Banning, to the intersection of Bonita Avenue and Apache Trail in the unincorporated community of Cabazon, for approximately 3.3 miles of new roadway in the County of Riverside.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Rodney Whitfield
Topic: Interstate Highway System
22 March 2022Notice of Final Federal Agency Actions on Proposed Highway in California
The actions relate to a proposed roadway project, the I-10 Bypass: Banning to Cabazon Project from the intersection of Hathaway Street and Westward Avenue in the City of Banning to the intersection of Bonita Avenue and Apache Trail in the unincorporated community of Cabazon, for approximately 3.3 miles of new roadway in the County of Riverside.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Christina Leach
Topic: Interstate Highway System
6 October 2022Notice of Final Federal Agency Actions on Proposed Highway in California
The actions relate to a proposed highway project, replacing rock slope protection for four bridges at Three Star Ditch and Determination Ditch on Interstate 10, in the County of Riverside, State of California.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Antonio Johnson
Topic: Interstate Highway System
3 November 2022Environmental Impact Statement: El Paso County, Texas
FHWA, on behalf of TxDOT, is issuing this notice to advise the public that an EIS will be prepared for a proposed transportation project to study the effects of the project on Interstate Highway 10, known as the Downtown 10 project.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Michael T. Leary
Topic: Interstate Highway System
15 December 2022Notice of Inventory Completion: Alabama Department of Transportation, Montgomery, AL
Burials were removed by University of Alabama archeologists under contract to ALDOT during Phase III Data Recovery excavations conducted prior to construction of Interstate 10 across Mobile Bay, near the city of Daphne.
Federal Register Notice (text)
Agency: National Highway Traffic Safety Administration
Byline: Melanie O'Brien
Topic: Interstate Highway System
27 January 2023Notice of Final State Agency Actions on Sunset Road: I-10 to River Road Pima County, Arizona
The actions relate to the Environmental Assessment and Finding of No Significant Impact for the proposed project Sunset Road: I-10 to River Road, Pima County, Arizona.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Karla S. Petty
Topic: Interstate Highway System


Interstate 11

DateArticleAuthor/Source
20 May 2016Tier 1 Environmental Impact Statement for Interstate 11 Corridor Between Nogales and Wickenburg, ArizonaFederal Register: FHWA (Karla S. Petty)
1 May 2019Notice of Availability of Errata to the Draft Tier 1 Environmental Impact Statement and Preliminary Section 4(f) Evaluation for Interstate 11 Corridor Between Nogales and Wickenburg, AZFederal Register: FHWA (Karla S. Petty)
22 November 2021Notice of Final Federal Agency Actions on the Interstate-11 (I-11), Nogales to Wickenburg, in Santa Cruz, Pima, Pinal, Maricopa and Yavapai Counties, AZ
The actions relate to the Tier 1 Environmental Impact Statement and Record of Decision for the Interstate-11. The actions grant licenses, permits, and approvals for the project.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Karla S. Petty
Topic: Interstate Highway System


Interstate 12

DateArticleAuthor/Source
29 September 2016Stanley Consultants Selected for Louisiana I-12 Widening DesignStanley Consultants


Interstate 15

Photographs

Exit 54 to Speedway Boulevard Subject:  Exit 54 to Speedway Boulevard
Source:  www.steelcityhobbies.com
Location:  Las Vegas, Nevada
Date:  14 April 2007
License:  Creative Commons Attribution 2.0 Generic
View photo if Interstate 15 Exit 54 to Speedway Boulevard - 1,820KB


DateArticleAuthor/Source
11 May 1998TRANSPORTATION SECRETARY SLATER LAUNCHES NATIONAL TRANSPORTATION WEEK BY CELEBRATING PROGRESS OF INTERSTATE 15U.S. Department of Transportation
28 January 1999FHWA CITES UTAH I-15 PROJECT AS EXAMPLE OF INNOVATIVE WAY TO BUILD ROADSFederal Highway Administration
14 May 2001U.S. Transportation Secretary Mineta Praises Successful Completion of I-15 Project in UtahFederal Highway Administration
27 October 2004U.S. DOT Grant to Fund New I-15 Overpass in Las VegasFHWA
26 August 2008U.S. Department of Transportation Approves Utah's I-15 CorridorFHWA
2 November 2011Nation's Top Federal Highway Official Visits San Diego Area's I-15 Express Lanes ProjectFHWA
10 January 2012FHWA Administrator Mendez Joins Nevada Officials for Innovative I-15 Bridge Replacement DemonstrationFHWA
28 June 2013FHWA Celebrates Devore Interchange GroundbreakingFHWA
12 September 2014I-15 to OpenNevada Department of Transportation
16 September 2014U.S. Transportation Secretary Foxx Announces $1.5 Million in 'Quick Release' Emergency Relief Funds to Repair I-15 North of Las VegasFHWA
20 May 2016Federal Highway Administration Cuts Ribbon on San Bernardino’s Devore InterchangeFHWA
8 February 2019Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
8 March 2019Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
22 March 2019Notice of Final Federal Agency Actions on Proposed I-15 Corridor Project in CaliforniaFederal Register: FHWA (Tashia J. Clemmons)
23 September 2019Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Brigitte Mandel)
6 April 2020Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
1 May 2020Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
13 November 2020Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
27 January 2021Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
18 October 2021Notice of Final Federal Agency Actions on Proposed Highway in Utah
The final agency actions relate to a proposed highway project, improvements to Interstate 15, from Milepost 257.3 to MP 259.9 in Springville City and Spanish Fork City.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Ivan Marrero
Topic: Interstate Highway System
28 March 2022Environmental Impact Statement; Interstate 15: Farmington to Salt Lake City, Utah
Persons or agencies who might be affected by the proposed project are encouraged to comment on the information in this Notice of Intent.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Ivan Marrero
Topic: Interstate Highway System


Interstate 17

DateArticleAuthor/Source
23 August 2013Notice To Rescind a Notice of Intent and Draft Environmental Impact Statement: I-17 Corridor Improvement Study; Maricopa County, ArizonaKarla S. Petty
5 June 2020Notice of Final State Agency Actions Under 23 U.S.C. 327 on Interstate 10 Broadway Curve, Interstate 17 (Split) to Loop 202 (Santan Freeway) in Maricopa County, AZFederal Register: FHWA (Karla S. Petty)


Interstate 19

DateArticleAuthor/Source
12 May 2017Tier 1 Environmental Impact Statement (EIS) for the Sonoran Corridor Between Interstate 10 (I-10) and Interstate 19 (I-19) South of Tucson International Airport in Pima County, ArizonaFederal Register: FHWA (Karla S. Petty)
15 November 2021Notice of Final Actions for the Tier 1 Environmental Impact Statement (EIS) for the Sonoran Corridor Between Interstate 19 (I-19) and Interstate 10 (I-10), South of the Tucson International Airport in Pima County, Arizona
The actions relate to the Tier 1 EIS study associated with the Sonoran Corridor between I-19 and I-10, south of the Tucson International Airport in Pima County, Arizona.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Karla S. Petty
Topic: Interstate Highway System


Interstate 20

DateArticleAuthor/Source
29 May 2019Notice of Final Agency Actions on Proposed I-20/26/126 Carolina Crossroads Corridor Project in South CarolinaFederal Register: FHWA (Emily O. Lawton)
27 November 2020Notice of Final Federal Agency Action on Proposed Highway Project in Georgia, the I-285/I-20 East Interchange Project, DeKalb County, Georgia (Atlanta Metropolitan Area)Federal Register: FHWA (Moises Marrero)


Interstate 24

DateArticleAuthor/Source
23 March 2006Kentucky Receives $1.5 Million Federal Grant For Christian County Highway ImprovementsFHWA


Interstate 25

DateArticleAuthor/Source
27 October 2004More Than $3.3 Million in U. S. DOT Grants to Help Finish I-25 Interchange, Other Denver-Area ProjectsFHWA
29 October 2004U.S. DOT Grant to Fund New Las Cruces InterchangeFHWA
27 October 2004U.S. DOT Grants will Help Fund I-25 Upgrade, Other Albuquerque Highway ProjectsFHWA
1 June 2006Nation's Top Highway Official Opens New I-25 HOT Express Lanes That Give Drivers A Way Out Of Congestion To Downtown DenverFHWA
28 September 2009Project Engineer, Prime Contractor Employees, and Subcontractor Charged with Conspiracy to Bribe State Official in Connection with Federally Funded Highway ProjectU.S. Attorney’s Office, Eastern District of Louisiana
12 March 2012Preliminary work on I-25/St. Francis Off-Ramp began in Santa Fe CountyNew Mexico Department of Transportation
3 April 2012Bridge Rehabilitation Work at I-25 & St. Francis Interchange in Santa Fe to Impact Commuters and TouristsNew Mexico Department of Transportation
24 April 2012FHWA Administrator Mendez Joins Governor Martinez to Break Ground on I-10/I-25 Interchange ProjectFHWA
24 April 2012Governor Susana Martinez, FHWA Administrator Victor Mendez and State Transportation Officials Break Ground on I-10/I-25 Interchange Project in Las CrucesNew Mexico Department of Transportation
27 April 2012Bridge Work on I-25/St. Francis Off-Ramp Closure and Traffic Switch on St. Francis DriveNew Mexico Department of Transportation
18 May 2012Traffic Alert: I-25/Engler-Kennedy, Las Cruces, New MexicoNew Mexico Department of Transportation
23 May 2012PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange, Las Cruces, NMNew Mexico Department of Transportation
24 May 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
1 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
1 June 2012I-25 Wearing Course Overlay Construction From Santa Fe County Line to Waldo Canyon InterchangeNew Mexico Department of Transportation
6 June 2012I-25 Wearing Course Overlay Construction From Santa Fe County Line to Waldo Canyon Interchange UpdateNew Mexico Department of Transportation
7 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
15 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
22 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
26 June 2012PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange Las Cruces, NMNew Mexico Department of Transportation
29 June 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
5 July 2012Traffic Alert: I-25 Missouri Las Cruces, New MexicoNew Mexico Department of Transportation
12 July 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
19 July 2012PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange Las Cruces, NMNew Mexico Department of Transportation
27 July 2012Traffic Alert: I-10/I-25 Las Cruces, New MexicoNew Mexico Department of Transportation
6 August 2012Traffic Alert: I-25/I-10 Las Cruces, New MexicoNew Mexico Department of Transportation
28 August 2012Traffic Alert: I-10/I-25 Las Cruces, New MexicoNew Mexico Department of Transportation
26 October 2012I-10/I-25 Systems Interchange ProjectNew Mexico Department of Transportation
14 November 2012I-25/St. Francis Drive Off-Ramp To Close Thursday Night November 15New Mexico Department of Transportation
16 November 2012UPDATE: Traffic Alert: I-10/I-25 System InterchangeNew Mexico Department of Transportation
4 February 2013Work Proceeding on Paseo Del Norte/I-25 Interchange Reconstruction ProjectPaseo Del Norte/I-25 Interchange Reconstruction Project
13 February 2013Paseo Del Norte/I-25 Interchange Reconstruction Project Announces Short List of Design-Build Teams For Construction of ProjectPaseo Del Norte/I-25 Interchange Reconstruction Project
25 March 2013PUBLIC MEETING NOTICE: I-10/I-25 Systems Interchange Las Cruces, NMNew Mexico Department of Transportation
30 April 2013Paseo Del Norte/I-25 Interchange Reconstruction Project Receives Important Federal ApprovalsPaseo Del Norte/I-25 Interchange Reconstruction Project
4 August 2013Design-Build Team Selected for I-25/Paseo del Norte Reconstruction ProjectNew Mexico Department of Transportation
23 August 2013Design-Build Team To Start Surveying In Preparation for Project ConstructionPaseo Del Norte/I-25 Interchange Reconstruction Project
21 October 2013New Mexico Department of Transportation Hosts Marketing Workshop For Businesses Affected by the Paseo Del Norte/I-25 Interchange Reconstruction ProjectGovernor Susana Martinez
16 December 2013Project Announces Week of Major Work at Night Dec. 16-20, 2013Paseo Del Norte/I-25 Interchange Reconstruction Project
19 December 2013Paseo Del Norte/I-25 Interchange Project Nighttime Interstate ClosuresNew Mexico Department of Transportation
20 December 2013Paseo Del Norte/I-25 Construction Paused For Holiday TravelNew Mexico Department of Transportation
3 January 2014Interstate Lane Closures for I-25/Paseo Del Norte Reconstruction ProjectNew Mexico Department of Transportation
10 February 2014UPDATE: PAVING TAKING PLACE ON PASEO DEL NORTE BETWEEN JEFFERSON AND I-25 TODAY AND TOMORROWPaseo Del Norte/I-25 Interchange Reconstruction Project
21 February 2014Project Announces New Lane Configuration for Eastbound and Westbound Paseo Del Norte Near JeffersonPaseo Del Norte/I-25 Interchange Reconstruction Project
17 March 2014Project Announces Temporary Relocation of Southbound I-25 Off-Ramp Near EllisonPaseo Del Norte/I-25 Interchange Reconstruction Project
27 March 2014I-25/Missouri Bridge Replacement Project Call for ArtistsNew Mexico Department of Transportation
2 April 2014I-25 Roadway Rehabilitation Work To Begin Week of April 7thNew Mexico Department of Transportation
9 April 2014Traffic Advisory: I-25 Bridge Rehabilitation North of Santa FeNew Mexico Department of Transportation
9 May 2014Speed Limit to Increase on I-25 from Albuquerque to BernalilloNew Mexico Department of Transportation
21 May 2014I-25 Traffic Switch & Sleeping Dog Road Closure North of Santa FeNew Mexico Department of Transportation
13 June 2014Paseo Del Norte/I-25 Interchange Reconstruction Project Announces Saturday Night Closure of Paseo Del Norte Between Jefferson and Second StreetPaseo Del Norte/I-25 Interchange Reconstruction Project
20 June 2014Paseo Del Norte/I-25 Interchange Reconstruction Project Plans Number of Closures & Realignments for Weekend of June 20-22, 2014Paseo Del Norte/I-25 Interchange Reconstruction Project
3 July 2014Construction Suspended July 4th on Paseo del Norte/I-25 Project
Construction Suspended July 4th on Paseo del Norte/I-25 Project
New Mexico Department of Transportation
16 July 2014I-25 Bridge Work to Begin July 18 Santo DomingoNew Mexico Department of Transportation
18 July 2014I-25 NB Off-Ramp to St. Francis Drive Closure & I-25 Lane Closures to Begin June 20
I-25 NB Off-Ramp to St. Francis Drive Closure & I-25 Lane Closures to Begin June 20
New Mexico Department of Transportation
31 July 2014I-25 Bridge Work Continues August 1st Santo DomingoNew Mexico Department of Transportation
8 August 2014I-25 Bridge Work Continues August 8 Santo DomingoNew Mexico Department of Transportation
15 August 2014I-25 Bridge Work Continues August 15 – Santo DomingoNew Mexico Department of Transportation
22 August 2014I-25 Bridge Work Begins August 23 Bonanza CreekNew Mexico Department of Transportation
22 August 2014I-25 East Frontage Road Pavement Preservation Work To Begin August 25New Mexico Department of Transportation
1 October 2014I-25 Bridge Rehabilitation Work Waldo CanyonNew Mexico Department of Transportation
1 October 2014I-25 East Frontage Road & I-25 NB Off-Ramp (Exit 282) Pavement Preservation Work to Begin October 2New Mexico Department of Transportation
5 October 2014I-25 & St. Francis Drive Lane Closures to Begin October 6New Mexico Department of Transportation
6 October 2014I-25 Truth or Consequences Bridge Repair WorkNew Mexico Department of Transportation
16 October 2014I-25 Bridge Work Continues October 18 Santo DomingoNew Mexico Department of Transportation
14 November 2014Paseo Del Norte/I-25 Interchange Reconstruction Project Announces Major Traffic Shift for Westbound Commuters on Paseo Del Norte As of Nov. 17, 2014Paseo Del Norte/I-25 Interchange Reconstruction Project
14 November 2014Public Involvement Meeting for the I-25 / Rio Bravo Boulevard Interchange ProjectNew Mexico Department of Transportation
11 December 2014I-25 Roadway Cleanup Work at Santo Domingo & Bonanza CreekNew Mexico Department of Transportation
15 December 2014Governor Susana Martinez, Mayor Richard J. Berry, Local, and Federal Officials Open the New Paseo Del Norte/I-25 InterchangeGovernor Susana Martinez
27 January 2015I-25/Missouri Bridge Project Scheduled to Begin First Week of FebruaryNew Mexico Department of Transportation
6 February 2015I-25/Missouri Bridge Project Scheduled to Begin First Week of FebruaryNew Mexico Department of Transportation
9 February 2015I-25 Southbound Lane Closure Pavement Preservation WorkNew Mexico Department of Transportation
9 February 2015Paseo Del Norte/I-25 Interchange Reconstruction Project Announces Closure of El Pueblo at TiburonPaseo Del Norte/I-25 Interchange Reconstruction Project
11 February 2015I-25/Missouri Bridge Project Intermittent Lane Closure from University Avenue to Lohman AvenueNew Mexico Department of Transportation
11 February 2015I-25/Old Pecos Trail Interchange Earthwork OperationsNew Mexico Department of Transportation
13 February 2015I-25 Southbound Lane Closure Road Pavement AssessmentNew Mexico Department of Transportation
19 February 2015I-25/University Loop Ramp to be CLOSEDNew Mexico Department of Transportation
16 February 2015Paseo Del Norte/I-25 Interchange Reconstruction Project Announces Closures Feb. 16-23, 2015Paseo Del Norte/I-25 Interchange Reconstruction Project
24 February 2015I-25/Missouri Bridge Project Public MeetingNew Mexico Department of Transportation
5 March 2015I-25/Missouri Bridge – Restrictions for Right Turns from Missouri Avenue to Triviz DriveNew Mexico Department of Transportation
5 March 2015Paseo Del Norte/I-25 Interchange Reconstruction Project Announces Closure of Multi-Use Trail East of I-25 and South of Paseo Del NortePaseo Del Norte/I-25 Interchange Reconstruction Project
11 March 2015I-25/Missouri Bridge – Restrictions I-25 off ramp to University AvenueNew Mexico Department of Transportation
19 March 2015I-25/Missouri Bridge – Project UpdateNew Mexico Department of Transportation
23 March 2015I-25 Bridge Repairs –South of Santa FeNew Mexico Department of Transportation
21 April 2015I-25/Missouri Bridge Project UpdateNew Mexico Department of Transportation
4 May 2015I-25/Missouri Bridge – Project UpdateNew Mexico Department of Transportation
7 May 2015I-25/Missouri Bridge Change in Traffic ControlNew Mexico Department of Transportation
11 May 2015I-25/Missouri Bridge – Overnight ClosureNew Mexico Department of Transportation
14 May 2015I-25 Bridge Work Begins May 18 – Seton VillageNew Mexico Department of Transportation
26 May 2015I-25/Missouri Bridge – Overnight ClosureNew Mexico Department of Transportation
3 June 2015I-25/Missouri Bridge – Overnight ClosureNew Mexico Department of Transportation
3 June 2015Seton Village Bridge Closure Re-Scheduled For June 3New Mexico Department of Transportation
5 June 2015Construction To Begin on I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI)New Mexico Department of Transportation
8 June 2015I-25 Flyover to Paseo Del Norte Closed Nightly This WeekNew Mexico Department of Transportation
11 June 2015Closures To Begin on I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI)New Mexico Department of Transportation
12 June 2015Seton Village Bridge Work Continue Bridge Closure Scheduled For June 14New Mexico Department of Transportation
17 June 2015I-25 East Frontage Road Pavement Preservation Work ContinuesNew Mexico Department of Transportation
17 June 2015Seton Village Bridge Work Continue Bridge Closure Scheduled For June 17New Mexico Department of Transportation
18 June 2015I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI) Closures Rescheduled for June 26New Mexico Department of Transportation
18 June 2015I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI) I-25 Lane Closures To Begin June 22New Mexico Department of Transportation
19 June 2015I-25/Missouri Bridge Project Public Involvement MeetingNew Mexico Department of Transportation
24 June 2015I-25/Missouri Bridge – Overnight ClosureNew Mexico Department of Transportation
29 June 2015Governor Susana Martinez Helps Break Ground at Cerrillos Road and I-25 in Santa Fe
Governor Susana Martinez Helps Break Ground at Cerrillos Road and I-25 in Santa Fe
New Mexico Department of Transportation
8 July 2015I-25/Missouri AvenueNew Mexico Department of Transportation
9 July 2015Change in Overnight Closure for I-25/Missouri AvenueNew Mexico Department of Transportation
13 July 2015Update for I-25/Missouri AvenueNew Mexico Department of Transportation
17 July 2015I-25 NB & SB Lane Closures & I-25 NB & SB On and Off-Ramps to St. Francis Drive Closures To Begin June 19New Mexico Department of Transportation
22 July 2015New Mexico Department of Transportation’s Paseo Del Norte/I-25 Interchange Project Wins Prestigious National Award
New Mexico Department of Transportation’s Paseo Del Norte/I-25 Interchange Project Wins Prestigious National Award
New Mexico Department of Transportation
31 July 2015I-25 Utility Work & Lane Closures Scheduled For Sunday August 2New Mexico Department of Transportation
31 July 2015Update for I-25/Missouri BridgeNew Mexico Department of Transportation
21 August 2015Sunport to Northbound I-25 Ramp Back OpenNew Mexico Department of Transportation
31 August 2015Nine Mile Bridge Lane Closures – North of Santa FeNew Mexico Department of Transportation
1 September 2015I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI) Closures Scheduled for September 14-17New Mexico Department of Transportation
4 September 2015Alamosa Canyon, I-25New Mexico Department of Transportation
10 September 2015I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange Night Closures Re-Scheduled For September 22-25 & Week of October 2New Mexico Department of Transportation
22 September 2015Update for I-25/Missouri AvenueNew Mexico Department of Transportation
7 October 2015Closures for I-25/Missouri Avenue ProjectNew Mexico Department of Transportation
19 October 2015I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange Announces Expanded Website, Facebook Page and Twitter AccountNew Mexico DOT Diverging Diamond Interchange Project
20 October 2015I-25/Missouri Ave. BridgeNew Mexico Department of Transportation
29 October 2015I-25 Closures Scheduled For Sunday November 1New Mexico Department of Transportation
29 October 2015I-25 Closures Scheduled For Sunday November 1 South of Santa Fe Near The Fashion Outlets Mall of Santa FeNew Mexico Department of Transportation
18 November 2015I-25/Missouri Ave. BridgeNew Mexico Department of Transportation
23 November 2015I-25 / NM 14 (Cerrillos Road) Diverging Diamond Interchange Night Closures Scheduled November 24-26, 2015New Mexico Department of Transportation
4 December 2015Bob Cat Bridge Rehabilitation - North of Santa Fe Construction UpdateNew Mexico Department of Transportation
16 December 2015I-25/Missouri Ave. BridgeNew Mexico Department of Transportation
2 March 2016I-25 Lane Closure at Indian School Bridge OverpassNew Mexico Department of Transportation
4 April 2016FHWA Administrator Nadeau On Hand For Opening of Denver's North I-25 Express LanesFHWA
11 April 2016Public Meeting Planned on I-25 / Rio Bravo InterchangeNew Mexico Department of Transportation
4 August 2016Bridgework Scheduled for weekend of Aug. 6; Lane closures on I-25 plannedNew Mexico Department of Transportation
14 October 2016Bridgework Scheduled on I-25 Southbound this WeekendNew Mexico Department of Transportation
16 November 2016Public Information Meeting Planned: Interstate 25 and Rio Bravo Proposed InterchangeNew Mexico Department of Transportation
4 April 2017Traffic Alert: Interstate 25 (I-25) Northbound Exit Ramp Closure MP 59 Exit to CaballoNew Mexico Department of Transportation
5 May 2017Person Dies After Border Patrol Checkpoint Shooting Near Las CrucesFBI Albuquerque/td>
9 November 2017NMDOT Announces Construction to Begin Nov. 13 on I-25 San Antonio to Jefferson ProjectNew Mexico Department of Transportation
9 January 2018RIO BRAVO TO BE CLOSED AT I-25 AT NIGHT ON FRIDAY, JAN. 12 AND SATURDAY, JAN. 13New Mexico Department of Transportation
18 January 2018Eastbound Rio Bravo to Be Closed under I-25 at Night Jan. 19; Westbound Rio Bravo to Be Closed Under I-25 at Night Jan. 20; Broadway at Rio Bravo Shifted onto New Alignment Jan. 20New Mexico Department of Transportation
5 April 2018I-25 Northbound & Southbound at Exit 230 (San Mateo Blvd)New Mexico Department of Transportation
17 April 2018Southbound I-25 Traffic to Use New Exit Ramp at Rio Bravo And Southbound Right Lane of I-25 Closed Beginning Thursday Evening, April 19, 2018New Mexico Department of Transportation
9 May 2018I- 25 / St. Francis Drive Interchange Ramp Closures (Exit 282) Nighttime Work – May 9New Mexico Department of Transportation
16 May 2018EASTBOUND RIO BRAVO TO BE CLOSED BETWEEN BROADWAY AND I-25 EACH EVENING FROM MAY 21-24, 2018 FOR BRIDGE DEMOLITIONNew Mexico Department of Transportation
16 May 2018Southbound I-25 Traffic to Shift to New Lanes and Two Ramps To Be Closed at I-25 and Rio Bravo Beginning Friday, May 18New Mexico Department of Transportation
22 June 2018I-25 San Antonio to Jefferson ProjectNew Mexico Department of Transportation
3 July 2018I-25/NM 14 (Cerrillos Road) DDI Interchange Striping Operations To Begin – July 3New Mexico Department of Transportation
9 July 2018NMDOT Announces Completion of I-25 Widening ProjectNew Mexico Department of Transportation
18 July 2018Rio Bravo to Be Closed Between Broadway and I-25 From Friday Evening, July 20 through Monday Morning, July 23New Mexico Department of Transportation
31 July 2018I-25 Lane Closures - St. Francis Drive (Exit 282) Bridge Rehabilitation WorkNew Mexico Department of Transportation
12 September 2018I-25 / St. Francis Drive Interchange Ramp Closures (Exit 282) Nighttime Work – September 12New Mexico Department of Transportation
24 September 2018I-25 SB Lane Closures La Bajada – September 13thNew Mexico Department of Transportation
26 April 2019LOOP RAMP TO OPEN MONDAY, APRIL 29, 2019 FOR EASTBOUND TRAFFIC ON RIO BRAVO TO ACCESS NORTHBOUND I-25New Mexico Department of Transportation
29 April 2019I-25 Southbound at Gibson Exit 222-A will be closed for Bridge MaintenanceNew Mexico Department of Transportation
8 May 2019I-25 Southbound at Gibson Exit 222-A will be closed for Bridge MaintenanceNew Mexico Department of Transportation
17 May 2019WEEKEND CONSTRUCTION PLANNED FOR RIO BRAVO AND SOUTHBOUND I-25 OFF RAMP MAY 17-19, 2019New Mexico Department of Transportation
31 May 2019SOUTHBOUND I-25 OFF RAMP TO BE CLOSED SUNDAY, JUNE 2; SOUTHBOUND I-25 TO HAVE VARIOUS LANE CLOSURES MONDAY, JUNE 3 & TUESDAY, JUNE 4, 2019New Mexico Department of Transportation
13 June 2019Construction Update: Southbound I-25 Off-Ramp to Be Closed to Eastbound Rio Bravo from 9 p.m. Friday, June 14 through 12 Noon Monday, June 17New Mexico Department of Transportation
11 July 2019I-25 Rio Bravo Interchange Nearing Completion.New Mexico Department of Transportation
11 July 2019MEDIA ALERT: RIBBON CUTTING FOR I-25 RIO BRAVO INTERCHANGENew Mexico Department of Transportation
22 November 2019I-25 South Phase II ConstructionNew Mexico Department of Transportation
4 December 2019Expect Delays on I-25 Northbound at Gibson this weekendNew Mexico Department of Transportation
10 January 2020TRAFFIC ALERT Expect Delays on I-25 Northbound at Gibson this weekend through January 31stNew Mexico Department of Transportation
27 February 2020TRAFFIC ALERT: I-25 Southbound off ramp at Broadway closure February 27th 8 PM to 5 AMNew Mexico Department of Transportation
28 February 2020TRAFFIC ALERT: Interstate 25 Mill and Overlay Project Between Lower La Bahada to South of Cerrillos RoadNew Mexico Department of Transportation
11 March 2020TRAFFIC ALERT: I-25 Northbound 1 lane closure on March 11th & I-25 on ramp at Broadway closure March 12th 8 PM to 5 AMNew Mexico Department of Transportation
27 March 2020I-25 Southbound off ramp to close at Broadway MP 215 March 30 – April 13New Mexico Department of Transportation
14 April 2020I-25 Northbound on Ramp at Broadway Closure April 16-April 30, 2020New Mexico Department of Transportation
14 April 2020Man from Albuquerque faces federal charges for allegedly shooting at cars traveling on and near I-25 through Kewa PuebloU.S. Attorney’s Office, District of New Mexico
1 May 2020TRAFFIC ALERT: Big I Loop Ramp Full Closure I-40 EB to I-25 NB May 3, 2020New Mexico Department of Transportation
15 May 2020TRAFFIC ALERT: I-25 Lane Closures Northbound and Southbound From South of Rio Bravo to the Broadway InterchangeNew Mexico Department of Transportation
26 June 2020Traffic Alert: I-25 Frontage Road Southbound at LocustNew Mexico Department of Transportation
26 June 2020Traffic Alert: I-25 Northbound & Southbound at Exit 190 in Belen ClosuresNew Mexico Department of Transportation
10 July 2020Expect delays on I-25 northbound near La BajadaNew Mexico Department of Transportation
16 July 2020TRAFFIC ALERT: Pavement Preservation Project NM 423 (Paseo Del Norte) Westbound at MM 8 at I-25 Beginning on July 19, 2020 through July 22 from 8PM – 5AMNew Mexico Department of Transportation
1 September 2020Notice of Final State Agency Actions on I-25/I-80 Interchange Project in Laramie County, WyomingFederal Register: FHWA (Bryan Cawley)
9 December 2022Traffic Alert: I-25 Sigle lane closure over the Rio Grande River Bridge
The New Mexico Department of Transportation would like to inform motorists of a one lane closure on I-25 southbound over the Rio Grande River bridge near Isleta, beginning Friday, Dec 8 at 8 p.m. to Monday, Dec 12 at 3 p.m.
Press Release ( PDF)
Publisher: New Mexico Department of Transportation
Byline: Kimberly Gallegos
Dateline: Albuquerque, New Mexico
Topic: Interstate Highway System


Interstate 26

DateArticleAuthor/Source
4 April 2018FHWA Announces $1 Million in Emergency Relief Funds for Bridge Over I-26 in Orangeburg County, South CarolinaFHWA
29 May 2019Notice of Final Agency Actions on Proposed I-20/26/126 Carolina Crossroads Corridor Project in South CarolinaFederal Register: FHWA (Emily O. Lawton)
14 June 2023Notice of Final Federal Agency Actions on the I-26 Asheville Connector in North Carolina
The actions relate to the proposed improvements to upgrade the I-26 corridor in Asheville from south of the I-26/I-40/I-240 interchange through the I-240 interchange with US 19-23-74A/Patton Avenue west of the French Broad River so that I-240 can be redesignated as I-26 in Buncombe County, North Carolina.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Clarence W. Coleman
Topic: Interstate Highway System


Interstate 30

DateArticleAuthor/Source
21 September 2015Notice of Final Federal Agency Actions on IH 30 from Cooper Street to SH 161, Including the IH 30/SH 360 Interchange, in TexasMichael T. Leary
29 June 2017The Benton WaveCongressional Record: Rep. J. French Hill


Interstate 35

DateArticleAuthor/Source
2 August 2007Búsqueda de los desaparecidos tras la caída de un puente en Minneapolis Wikinoticias
2 August 2007Highway bridge in Minneapolis, Minnesota, collapses Wikinews
3 August 2007Aumenta la tasa de muertos tras el derrumbe del puente de Minneapolis Wikinoticias
3 August 2007Autobahnbrücke über den Mississippi in Minneapolis eingestürzt Wikinews
4 August 2007Death toll up to six in Minneapolis bridge collapseWikinews
6 August 2007FBI Continues to Assist in Bridge Collapse InvestigationFederal Bureau of Investigation
9 August 2007Reports: Design flaw caused Minneapolis, Minnesota bridge to collapse Wikinews
11 August 2007Mother, child found dead in Minneapolis collapse siteWikinews
17 August 2007Ready to Help Federal Bureau of Investigation
21 August 2007Capabilities at the Ready Federal Bureau of Investigation
21 August 2007Encontrado el último cuerpo desaparecido por la caída del puente de Minnesota Wikinoticias
21 August 2007Last missing body from Minnesota bridge collapse foundWikinews
24 August 2007‘A Measured Response’ Federal Bureau of Investigation
1 November 2007U.S. Secretary of Transportation Mary Peters Releases $123.5 Million in Funding for I-35W Bridge in MinneapolisFHWA
5 March 2008U.S. Secretary of Transportation Mary Peters Releases an Additional $195 Million in Funding for I-35W Bridge in MinneapolisFHWA
10 March 2008U.S. Department of Transportation Approves $430 Million Loan to Complete New Alternative to Congested I-35FHWA
7 July 2008Minneapolis I-35W bridge spans Mississippi River Wikinews
18 September 2008New I-35W Minneapolis bridge opens Wikinews
28 September 2009Nation's Top Highway Official Opens I-35W HOT Lanes in MinneapolisFHWA
27 April 2015Federal Highway Deputy Administrator Visits Kansas City-Area's $41.4 Million I-35/Pleasant Valley ImprovementFHWA
31 July 2015Notice of Final Federal Agency Actions on I-35 Northeast Expansion Project, Bexar, Comal and Guadalupe Counties, TexasMichael T. Leary
10 September 2015Federal Highway Administrator Helps Open LBJ Express ProjectFHWA
3 November 2015Sunshine Act MeetingFederal Register: NTSB (Candi R. Bing)
13 September 2016Notice of Final Federal Agency Action on I-35 Improvements From Rundberg Lane to US 290 East in Austin, Travis County, TexasFederal Register: FHWA (Michael T. Leary)
29 November 2016Federal Highway Administration Opens Phase 2 of Johnson County Gateway Project in Kansas City AreaFHWA
1 December 2016Record of Decision for the Trinity Parkway From IH-35/SH-183 to US-175/SH-310 Environmental Impact Statement, Dallas County, TXFederal Register: DoD (Douglas C. Sims)
24 February 2017Notice of Final Federal Agency Action on Interstate Highway 35 East (I-35E) From U.S. Highway 67 (US 67) to I-30 and US 67 From I-20 to I-35E, Dallas County, TexasFederal Register: FHWA (Michael T. Leary)
19 April 2017Dallas Man Guilty in Connection with Denton County Highway Expansion FraudU.S. Attorney’s Office, Eastern District of Texas


Interstate 39

DateArticleAuthor/Source
18 July 2023Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Highway Project; Madison to Wisconsin Dells, Wisconsin
FHWA, in coordination with the Wisconsin Department of Transportation, is issuing this Notice of Intent to solicit comment and advise the public, agencies, and stakeholders that an environmental impact statement will be prepared to study potential improvements to 67 miles of Interstates 39, 90, and 94 in Dane, Columbia, Sauk, and Juneau counties.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Glenn D. Fulkerson
Topic: Interstate Highway System


Interstate 40

DateArticleAuthor/Source
4 June 2002Bush Administration Pledges Downpayment of $3 Million Toward Rebuilding of I-40 Bridge in OklahomaFederal Highway Administration
29 July 2002Federal Highway Administrator Applauds Coordination Among Federal, State Governments and Private Sector For Reconstruction of I-40 Bridge in Half of Time ProjectedFederal Highway Administration
29 October 2004U.S. DOT Grant to Fund New I-40 Bridge in Winslow, ArizonaFHWA
24 June 2010FHWA Administrator Mendez Joins Governor Richardson at Completion of Albuquerque’s I-40/Paseo del Volcan InterchangeFederal Highway Administration
17 September 2010Officials Open New Flyover Ramp on I-40/Briley Parkway Interchange Recovery Act ProjectFederal Highway Administration
5 January 2012FHWA Administrator Mendez Joins Governor Fallin for Grand Opening of I-40 Crosstown ExpresswayFHWA
17 February 2012Reconstruction of I-40 West of Albuquerque Begins MondayNew Mexico Department of Transportation
11 October 2012Federal Highway Administrator Mendez Reviews Progress on North Carolina's I-77/I-40 Interchange ProjectFHWA
3 November 2012Interstate 40 closed East of Grants Due to Fiery CrashNew Mexico Department of Transportation
7 November 2012I-40 Roadway Reconstruction Project to Close Bridge Deck at Mesita on Laguna PuebloNew Mexico Department of Transportation
7 November 2012Repairs Scheduled for I-40 Damage From Fiery CrashNew Mexico Department of Transportation
25 February 2013I-40 Eastbound Closed Until at Least Tuesday MorningNew Mexico Department of Transportation
26 February 2013I-40 Reopened in New Mexico, Closed in TexasNew Mexico Department of Transportation
13 September 2013Flooding Results in Interstate 40 Lane ClosuresNew Mexico Department of Transportation
16 September 2013Update for Interstate 40 Lane Closures Impacted by FloodingNew Mexico Department of Transportation
25 November 2013Thanksgiving Weekend Nationwide Enforcement InitiativeNew Mexico Department of Public Safety
16 April 2014I-40 Moriarty West Interchange Traffic SwitchNew Mexico Department of Transportation
30 April 2014I-40 Moriarty Eastbound Off-Ramp Closure April 30New Mexico Department of Transportation
1 July 2014I-40 Moriarty West Interchange Reopens July 1New Mexico Department of Transportation
13 August 2014Former Redflex CEO, Liaison, And Chicago Official Indicted For Alleged Corruption In City’s Red Light Camera ContractsU.S. Attorney's Office, Northern District of Illinois
17 September 2014US 285/ I-40 Interchange Improvement Work Clines CornersNew Mexico Department of Transportation
3 October 2014I-40 Edgewood Interchange (Exit 189) Bridge Improvement WorkNew Mexico Department of Transportation
3 October 2014I-40 Moriarty West Interchange (Exit 194) Bridge Improvement WorkNew Mexico Department of Transportation
12 November 2014U.S. 285 / I-40 Interchange Night Closures Clines CornersNew Mexico Department of Transportation
23 January 2015Length To Be Extended for Speed Limit Along I-40 East of LagunaNew Mexico Department of Transportation
15 April 2015U.S. 285 / I-40 Interchange Clines Corners – Night ClosuresNew Mexico Department of Transportation
1 June 2015I-40 Paving Operations To Begin June 1 - MoriartyNew Mexico Department of Transportation
16 June 2015U.S. 285 / I-40 Interchange Clines Corners – Night ClosuresNew Mexico Department of Transportation
19 June 2015I-40 Reconstruction at Coors Minor Lane Shift at Westbound to North Coors Off RampNew Mexico Department of Transportation
27 July 2015I-40 Bridge Replacement Work To Begin June 27New Mexico Department of Transportation
12 August 2015I-40 Paving Operations To Begin August 17New Mexico Department of Transportation
4 September 2015Interstate 40 and Coors Boulevard Project Completed Ahead of ScheduleNew Mexico Department of Transportation
27 December 2015Eastbound I-40 to Remain Closed at Big-I During Morning CommuteNew Mexico Department of Transportation
National Weather Service
11 January 2016I-40/Louisiana Ramp Reconstruction Begins TonightNew Mexico Department of Transportation
14 March 2016Bridgework to close two lanes of I-40 at Tramway through WeekendNew Mexico Department of Transportation
23 March 2016Bridgework to close two lanes of I-40 at Tramway through WeekendNew Mexico Department of Transportation
30 March 2016Bridgework to Close four Lanes on I-40 westbound near Carlisle through WeekendNew Mexico Department of Transportation
5 April 2016Bridgework Continues on I-40 eastbound near Carlisle through Weekend of April 8-11New Mexico Department of Transportation
13 April 2016Bridgework on I-40 from Big I to Carlisle Scheduled to be Completed this Weekend; Weather PermittingNew Mexico Department of Transportation
20 April 2016Bridgework on I-40 from Big I to Carlisle Extended through this weekend;New Mexico Department of Transportation
4 May 2016Bridgework Scheduled on Carlisle Boulevard over I-40New Mexico Department of Transportation
11 May 2016Weekend Bridgework Scheduled on Carlisle Boulevard over I-40New Mexico Department of Transportation
18 May 2016Bridgework Scheduled on San Pedro Bridge over I-40New Mexico Department of Transportation
2 June 2016Bridgework Scheduled on Washington Bridge over I-40New Mexico Department of Transportation
6 July 2016Bridgework Scheduled in Big I area; Lane and ramp closures plannedNew Mexico Department of Transportation
21 March 2018WESTBOUND I-40 OFF RAMP AT THE LOUISIANA INTERCHANGENew Mexico Department of Transportation
3 May 2018AUI AND NMDOT TO CLOSE WESTBOUND I-40 LOUISIANA OFF-RAMP MAY 7, 2018 FOR CONSTRUCTION OF IMPROVEMENTS TO THE I-40 WESTBOUND ON & OFF RAMPS AT THE LOUISIANA INTERCHANGENew Mexico Department of Transportation
3 May 2018I-40 Eastbound Triple Lane ClosureNew Mexico Department of Transportation
1 June 2018AUI AND NMDOT TO OPEN WESTBOUND I-40 LOUISIANA OFF-RAMP JUNE 2, 2018; NORTHBOUND LOUISIANA AND EASTBOUND I-40 OFF-RAMP TO LOUISIANA TO HAVE LANE CLOSURES FOR ABOUT TWO WEEKSNew Mexico Department of Transportation
3 July 2018AUI AND NMDOT ENTER FINAL PHASE OF CONSTRUCION ON I-40 LOUISIANA INTERCHANGE PROJECT; WESTBOUND I-40 ON-RAMP AND VARIOUS SOUTHBOUND LOUISIANA LANES TO BE CLOSEDNew Mexico Department of Transportation
31 July 2018CONSTRUCTION WRAPS UP 10 DAYS EARLY ON IMPROVEMENTS TO THE I-40 WESTBOUND ON & OFF RAMPS AT THE LOUISIANA INTERCHANGENew Mexico Department of Transportation
6 August 2018TRAFFIC SIGNALS TO BE OFF ON LOUISIANA BRIDGE OVER I-40 FROM 12 MIDNIGHT TUESDAY, AUGUST 7 TO ABOUT 5:30 AM WEDNESDAY, AUGUST 8, 2018New Mexico Department of Transportation
7 March 2019I-40 Westbound Ramp Closures with One Lane TrafficNew Mexico Department of Transportation
11 April 2019Emergency Repair Work I-40 westbound at WyomingNew Mexico Department of Transportation
30 April 2019I-40 Concrete Slab Repair Work with One Lane TrafficNew Mexico Department of Transportation
7 May 2019Bridge and Roadway Construction Work ScheduledNew Mexico Department of Transportation
31 May 2019Public Open House Meeting for the I-40 Wall Barrier ProjectNew Mexico Department of Transportation
24 October 2019I-4o Driver QuestionnaireNew Mexico Department of Transportation
31 January 2020TRAFFIC ALERT: Tramway and I-40 Ramp Closures February 3 – February 7New Mexico Department of Transportation
1 May 2020TRAFFIC ALERT: Big I Loop Ramp Full Closure I-40 EB to I-25 NB May 3, 2020New Mexico Department of Transportation
26 June 2020Traffic Alert: I-40 Eastbound at 98th Street Ramp ClosuresNew Mexico Department of Transportation
26 October 2020TRAFFIC ALERT: I-40 Closure for Bridge Girder placement at ZuzaxNew Mexico Department of Transportation
16 November 2020TRAFFIC ALERT: I-40 Eastbound & Westbound near the Rio Puerco to near Atrisco VistaNew Mexico Department of Transportation
13 January 2021TRAFFIC ALERT: I-40 Closure for Bridge Deck Pour at Zuzax 1/15/21 – 1/16/21New Mexico Department of Transportation
8 February 2021TRAFFIC ALERT: I-40 Closure for Bridge Deck Pour at Zuzax 2/9/21 -2/10/21New Mexico Department of Transportation


Interstate 41

DateArticleAuthor/Source
10 December 2021Notice of Final Federal Agency Action on a Proposed Highway Project in Wisconsin
The final agency actions relate to a proposed highway project, along Interstate 41 in Outagamie and Brown counties, Wisconsin between State Highway 96 (Wisconsin Avenue) in the City of Appleton and County F (Scheuring Road) in the City of De Pere.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Glenn Fulkerson
Topic: Interstate Highway System


Interstate 43

DateArticleAuthor/Source
1 November 2004U.S. DOT Grant to Help Fund Replacement of Marquette Interchange in MilwaukeeFHWA
24 October 2011Notice of Final Federal Agency Actions on Proposed Highway Project in WisconsinTracey Blankenship


Interstate 45

DateArticleAuthor/Source
17 February 2017Notice of Final Federal Agency Action on State Highway 99 (Grand Parkway) Segment B, From SH 288 to Interstate Highway (IH) 45 South, Brazoria and Galveston Counties, TexasFederal Register: FHWA (Michael T. Leary)


Interstate 49

DateArticleAuthor/Source
12 December 2012Federal Highway Administrator Victor Mendez Visits Joplin for Redesignation of US-71 to I-49FHWA


Interstate 55

DateArticleAuthor/Source
19 October 2004Downtown St. Louis on Road to Revitalization Thanks to Ramp Project, Nation's Top Highway Official SaysFHWA
12 August 2008NWS Doppler Radar Detecting Cars National Weather Service WFO Chicago
26 August 2016Notice of Final Federal Agency Actions on Proposed Highway in IllinoisFederal Register: FHWA (Catherine A. Batey)
4 November 2019Notice To Rescind the Notice of Intent To Prepare a Limited Scope Supplemental Environmental Impact Statement: Interstate 55 Interchange in Shelby County, TennesseeFederal Register: FHWA (Pamela M. Kordenbrock)


Interstate 57

DateArticleAuthor/Source
August 12, 2008NWS Doppler Radar Detecting Cars National Weather Service WFO Chicago


Interstate 64

DateArticleAuthor/Source
20 January 2011Environmental Impact Statement: Interstate 64 Corridor, VirginiaJohn Simkins
March/April 2011From “Carmageddon” to Complete SuccessLinda Wilson
20 May 2011Environmental Impact Statement: Interstate 64 Hampton Roads Bridge Tunnel Corridor, VirginiaMarisel Lopez-Cruz
5 September 2013U.S. Department of Transportation Announces $11.9 Million TIGER 2013 Grant for I-64 Delta Frame Bridges in VirginiaFHWA
21 May 2014Notice of Final Federal Agency Actions on the Interstate 64 Peninsula Study in VirginiaJohn Simkins
30 June 2015Notice of Final Federal Agency Actions on the Interstate 64 Peninsula Study in VirginiaJohn Simkins
20 August 2015Notice To Rescind Notice of Intent To Prepare Environmental Impact Statement, Interstate 64 Hampton Roads Bridge-Tunnel Corridor, VirginiaEdward Sundra
7 November 2016Notice of Final Federal Agency Actions on the Interstate 64/High Rise Bridge Corridor Study in Chesapeake, VirginiaFederal Register: FHWA (John Simkins)
24 March 2017Notice of Final Federal Agency Actions on the Interstate 64 Peninsula Study in VirginiaFederal Register: FHWA (John Simkins)
28 March 2017Notice of Final Federal Agency Actions on the Interstate 64 Peninsula Study in VirginiaFederal Register: FHWA (John Simkins)
23 June 2017Notice of Final Federal Agency Actions on The Hampton Roads Crossing Study in the Cities of Hampton and Norfolk, VirginiaFederal Register: FHWA (Edward Sundra)
4 October 2017Mass Arrests After Protesters Close St. Louis HighwayVOA News


Interstate 65

DateArticleAuthor/Source
22 December 1999U.S. Transportation Secretary Slater Announces $10 Million to Indiana for I-65 ProjectFederal Highway Administration
27 March 201011 die in truck-van crash in KentuckyWikinews
29 April 2010Nation's Top Highway Official Joins Kentucky Governor to Celebrate Louisville Highway ProjectsFHWA
22 February 2012FHWA Administrator Mendez Reviews Work on Alabama's Largest Roadway ProjectFHWA
1 July 2013Temporary Closure of I-65 (I-70/I-65 South Split Interchange to I-70/I-65 North Split Interchange) in the City of IndianapolisVictor M. Mendez
22 August 20132013 Temporary Closure of I-65 (I-70/I-65 South Split Interchange) in the City of IndianapolisVictor M. Mendez
8 November 2013U.S. Transportation Secretary Foxx Approves Increased Federal Share to Upgrade the I-465/I-65 Interchange in IndianapolisFHWA
13 December 2013U.S. Transportation Secretary Foxx Announces $452 Million Loan for Louisville-Southern Indiana Ohio River Bridges ProjectFHWA
6 June 2014U.S. Transportation Secretary Foxx Announces $1 Million in Emergency Relief Funds for I-65 Bridge over Alabama's Middle RiverFHWA
20 August 2014U.S. Transportation Secretary Foxx Announces $1 Million in 'Quick Release' Emergency Relief Funds to Repair Damage to I-65 Near NashvilleFHWA


Interstate 66

Interstate 66 Sign Subject:  Interstate 66 Sign Clipart
Source:  WP Clipart
License:  Public Domain
View Interstate 66 Sign Clipart - 29KB


DateDocument Name & DetailsDocuments
6 October 1995
hearing date
Traffic Disruption Campaign by "Justice for Janitors"
Hearing Before a Committee on Ways and Means
U.S. House of Representatives

PDF
- 3.2MB - 55 pages


DateArticleAuthor/Source
13 July 1994Environmental Impact Statement: I-66 Access Study, Haymarket, Prince William County, VAFederal Register: FHWA (Robert E. Gatz)
18 April 2011Environmental Impact Statement: Interstate 66 Corridor, VirginiaJohn Simkins
6 July 2016Notice of Final Federal Agency Actions on the Interstate 66 Outside the Beltway Project in VirginiaFederal Register: FHWA (John Simkins)
21 June 2018Rescission of Record of Decision and Final Environmental Impact StatementFederal Register: FHWA (Thomas Nelson, Jr.)


Interstate 69

DateDocument Name & DetailsDocuments
March 2002Successes in Stewardship Resource Mapping and Early Involvement: Arkansas' Southeast Connector to Interstate 69
Federal Highway Administration
HTML - 1 page
March 2004Successes in Stewardship Texas' I-69/Trans-Texas Manual: By the Book
Federal Highway Administration
HTML - 1 page


DateArticleAuthor/Source
25 March 2011FHWA Administrator Mendez Helps Break Ground on I-94/I-69 Reconstruction Project in St. Clair CountyFHWA
20 July 2011Notice of Final Federal Agency Actions on Proposed Highway in IndianaRobert F. Tally, Jr.
29 September 2011Notice of Final Federal Agency Actions on Proposed Highway in IndianaRobert F. Tally Jr.
25 October 2011FHWA Administrator Mendez on Hand to Unveil First Segment of I-69 in KentuckyFHWA
16 November 2015Federal Highway Administration Approves Redesignation of Kentucky's Edward T. Breathitt Pennyrile ParkwayFHWA
5 October 2021Notice of Final Federal Agency Actions on Proposed Highway in Indiana and Kentucky
The actions relate to the proposed I-69 Ohio River Crossing (ORX) project in Evansville, Indiana and Henderson, Kentucky and grant licenses, permits, and approvals for the project.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Jermaine R. Hannon
Topic: Interstate Highway System


Interstate 70

DateDocument Name & DetailsDocuments
December 2002Successes in Stewardship Tiering Can Work: Missouri's I-70 Project
Federal Highway Administration
HTML - 1 page


DateArticleAuthor/Source
14 June 1999Federal Highway Administrator Celebrates First Anniversary of TEA-21 At Maryland I-70/I-270 Ground-BreakingFederal Highway Administration
25 October 2004Nation's Top Highway Official Dedicates Key Dayton, Ohio, Interstate Interchange to State's Military PersonnelFHWA
15 September 2010Federal Highway Official Helps Break Ground on Denver's I-70/Central Park Boulevard InterchangeFederal Highway Administration
24 October 2011FHWA Administrator Mendez Joins Local Officials for Opening of Denver's New I-70/Central Park Boulevard InterchangeFHWA
9 November 2011FHWA Administrator Gets Update on I-70/I-435 Interchange Reconstruction Project in Kansas CityFHWA
1 July 2013Temporary Closure of I-65 (I-70/I-65 South Split Interchange to I-70/I-65 North Split Interchange) in the City of IndianapolisVictor M. Mendez
22 August 20132013 Temporary Closure of I-65 (I-70/I-65 South Split Interchange) in the City of IndianapolisVictor M. Mendez
8 February 2014U.S. Transportation Secretary Foxx Joins Federal, State Officials for Opening of New Stan Musial Veterans Memorial BridgeFHWA
8 July 2015U.S. Transportation Secretary Foxx Announces $1 Million in 'Quick Release' Emergency Relief Funds to Repair I-70 in Columbus, OhioFHWA
29 February 2016Federal Highway Administration Provides $1 Million In Emergency Funds for Rock Slide Damage to Colorado's I-70 in Glenwood SpringsFHWA
3 August 2018Nation's Top Federal Highway Official On Hand for Central 70 Project GroundbreakingFHWA
1 August 2019ADA Pedestrian Improvements Scheduled to Begin In the Village of TularosaNew Mexico Department of Transportation
22 April 2020Recognizing Mr. Caleb LydickCongressional Record: Rep. John Shimkus
16 June 2020U.S. Department of Transportation Awards $4.4 Million to Ohio’s I-70 Truck Automation CorridorFHWA


Interstate 73

DateDocument Name & DetailsDocuments
April 2005Successes in Stewardship South Carolina's Interstate 73 Interagency Partnership
Federal Highway Administration
HTML - 1 page


DateArticleAuthor/Source
16 August 2007South Carolina to Begin Plans to Build I-73 Under A New Pilot Program for Tolling InterstatesFHWA
22 October 2008South Carolina's I-73 Reaches Major MilestoneFHWA
27 December 2010U.S. Transportation Secretary Ray LaHood Announces Signing of a $10 Million Recovery Act Grant Agreement for I-73/I-95 Interchange Access Road in South CarolinaFHWA
1 August 2017Notice of Final Agency Action on Proposed Interstate 73 in South CarolinaFederal Register: FHWA


Interstate 74

DateArticleAuthor/Source
3 March 2021Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Peoria, Tazewell and Woodford Counties, IllinoisFederal Register: FHWA (Arlene K. Kocher)


Interstate 75

DateArticleAuthor/Source
25 October 2004Nation's Top Highway Official Dedicates Key Dayton, Ohio, Interstate Interchange to State's Military PersonnelFHWA
3 May 2005Left-side driving part of a planned Findlay, Ohio interchange reconfigurationWikinews
8 March 2006Small plane crashes on median of Interstate 75 in MichiganWikinews
16 July 2009Tanker explodes on I-75 north of DetroitWikinews
16 September 2010Supplemental Draft Environmental Impact Statement (SDEIS) for Northwest I-75/I-575 Corridor, Cobb and Cherokee Counties, GA (Atlanta Metropolitan Area)Rodney N. Barry
11 February 2011U.S. Transportation Deputy Secretary Porcari: I-75 Modernization Means Jobs for DaytonU.S. Department of Transportation
29 June 2011Notice of Final Federal Agency Actions on Proposed Highway in OhioLaura S. Leffler
12 July 2011FHWA Administrator Lauds I-75 Resurfacing Project in Atlanta Completed Ahead of ScheduleFHWA
5 July 2013Notice of Final Federal Agency Action on Proposed Highway in Georgia the Interstate 75 (I-75) Express, Clayton and Henry Counties, Georgia (Atlanta Metropolitan Area)Rodney Barry
4 November 2014Notice of Final Federal Agency Action on Proposed Highway in Georgia the Interstate 75 (I-75) Express, Clayton and Henry Counties, Georgia (Atlanta Metropolitan Area)Rodney Barry
30 January 2015Notice of Final Federal Agency Action on the Proposed Highway in Georgia [Northwest I-75/I-575 Corridor, Cobb and Cherokee Counties, Georgia (Atlanta Metropolitan Area)]Rodney Barry
29 April 2016Infrasense, Inc. Uses Ground Penetrating Radar to Identify Repaired Concrete Joints Beneath Asphalt Along Interstate 75 Near Mt. Cory, OhioInfrasense, Inc.
29 September 2016Sunshine Act MeetingFederal Register: NTSB (Candi R. Bing)
5 January 2019Florida highway pileup, fire kills five children, two truck driversWikinews
16 October 2020Convicted Felon Pleads Guilty After Robbing Traveler Inside I-75 Rest AreaU.S. Attorney’s Office, Middle District of Georgia


Interstate 77

DateArticleAuthor/Source
13 August 2012Final Federal Agency Actions on Proposed Highway in North CarolinaClarence W. Coleman, Jr.
11 October 2012Federal Highway Administrator Mendez Reviews Progress on North Carolina's I-77/I-40 Interchange ProjectFHWA


Interstate 80

See also: San Francisco-Oakland Bay Bridge

DateReport NameAuthors/OrganizationFile
December 1966Review of Circumstances Relating to the Collapse of the John Day River Bridge on Interstate Route 80N in the State of OregonGeneral Accounting OfficePDF - 3,292KB - 46 pages


DateArticleAuthor/Source
21 October 2005Federal Highway Administration San Francisco-Oakland Bay Bridge StatementFHWA
29 April 2007Tanker truck fire causes collapse on Oakland FreewayWikinews
6 April 2010Federal Highway Administration Declines Pennsylvania Request to Toll I-80FHWA
26 January 2016Hanley Wood Selects Interstate 80 Reconstruction Project for 2016 Triad AwardHanley Wood
6 October 2017Notice of Final Federal Agency Actions on the West Davis Corridor Project, Davis and Weber County, UtahFederal Register: FHWA (Ivan Marrero)
9 February 2018Environmental Impact Statement: I-80/I-215 Parley's Interchange, Salt Lake County, UtahFederal Register: FHWA (Ivan Marrero)
24 July 2017Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
1 September 2020Notice of Final State Agency Actions on I-25/I-80 Interchange Project in Laramie County, WyomingFederal Register: FHWA (Bryan Cawley)
21 December 2022Environmental Impact Statement: Summit County, Utah
The FHWA, on behalf of the Utah Department of Transportation, is issuing this Notice of Intent to solicit comment and advise the public, agencies, and stakeholders that an EIS will be prepared for transportation improvements in the Kimball Junction area which includes the I-80 and SR-224 interchange and SR-224 through the two at-grade intersections to the south of I-80 in Summit County, Utah.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Ivan Marrero
Topic: Interstate Highway System


Interstate 81

DateArticleAuthor/Source
14 May 2013U.S. Transportation Secretary LaHood Announces $2 Million in Quick Release Emergency Relief Funds for Damaged Bridges on I-81/SR22 Interchange Near HarrisburgFHWA
26 August 2013Environmental Impact Statement: Interstate 81 Viaduct Project (Onondaga County, New York)Jonathan D. McDade
16 August 2019Painting Contractor Sentenced To 46 Months’ Imprisonment In Connection With George Wade Bridge ProjectU.S. Attorney’s Office, Middle District of Pennsylvania
3 June 2022Notice of Final Federal Agency Actions on the Interstate 81 Viaduct Project, Onondaga County, New York
The purpose of the Project is to address structural deficiencies and non-standard highway features while creating an improved transportation corridor through the City of Syracuse that meets the transportation needs and provides the infrastructure to support long-range transportation planning efforts.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Richard J. Marquis
Topic: Interstate Highway System


Interstate 83

DateArticleAuthor/Source
24 September 2004Nation's Top Highway Official Tours York's I-83 Construction Project; Praises Economic and Safety BenefitsFHWA


Interstate 84

DateArticleAuthor/Source
29 October 2004New U.S. DOT Grant to Fund New Baker County, Oregon, InterchangeFHWA
16 December 2010Pendleton Man Sentenced for Vehicular Assault Intoxicated Defendant Drove the Wrong Way on Interstate 84, Colliding with VictimsU.S. Attorney’s Office, District of Oregon
23 March 2016Infrasense, Inc. uses Ground Penetrating Radar to evaluate the pavement structure of 12.8 miles of Interstate I-84 in Idaho.Infrasense
20 April 2020Rescission of the Notice of Intent for an Environmental Impact Statement: Hartford County, ConnecticutFederal Register: FHWA (Amy D. Jackson-Grove)


Interstate 85

DateArticleAuthor/Source
28 September 2011Nation's Top Highway Official Helps Break Ground on Montgomery Outer LoopFHWA
16 February 2012Federal Highway Administrator Mendez Reviews Progress on I-85 WideningFHWA
5 March 2013Federal Highway Administrator Mendez Reviews Progress of Charlotte-Area's I-85 InterchangeFHWA


Interstate 86

DateArticleAuthor/Source
30 March 2018Infrasense Carries out Ground Penetrating Radar (GPR) and Infrared Thermography Evaluation of Pavement Structure in Minnesota, District 5Infrasense


Interstate 87

DateArticleAuthor/Source
17 November 2014Notice of Final Federal Agency Actions on the New York I-87 Access Improvement Project, Albany County, New YorkJonathan D. McDade


Interstate 88

DateArticleAuthor/Source
4 February 2016Sunshine Act MeetingFederal Register: NTSB (Candi R. Bing)


Interstate 90

DateArticleAuthor/Source
11 July 2006Portion of ceiling collapses in Boston tunnelWikinews
26 October 2007Dan Ryan - 45MPH. Watch it!Gus Philpott, The Woodstock Advocate
22 December 2007Dan Ryan 45MPH Speed Limit - Dumb!Gus Philpott, The Woodstock Advocate
11 February 2009I-90 - What do you call it?Gus Philpott, The Woodstock Advocate
12 February 2009Tollway speeders - even troopersGus Philpott, The Woodstock Advocate
18 September 2009Powers Fasteners, Inc. Charged with False Statement in Connection with I-90 Ceiling Collapse on Big Dig ProjectU.S. Attorney’s Office, District of Massachusetts
21 November 2009I-90 Speed LimitGus Philpott, The Woodstock Advocate
23 November 2009Tollway to correct speed limit signGus Philpott, The Woodstock Advocate
24 August 2011Got sense? Tell the TollwayGus Philpott, The Woodstock Advocate
24 August 2011Huntley I-90 interchange - $64,000,000!Gus Philpott, The Woodstock Advocate
28 September 201245MPH Work Zone Speed Limit - meaningless!Gus Philpott, The Woodstock Advocate
6 May 2013I-90 Work Zone - yes or no?Gus Philpott, The Woodstock Advocate
23 October 2015Buy America Waiver NotificationFederal Register: FHWA (Gregory G. Nadeau)
28 February 2017Fox River Bridge Receives Illinois ACEC Eminent Conceptor AwardStanley Consultants
25 July 2018Fifth Massachusetts State Trooper Arrested in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
17 August 2018Rescission of Notice of Intent (NOI) To Prepare an Environmental Impact Statement (EIS)Federal Register: FHWA (Daniel M. Mathis)
17 August 2018Sixth Massachusetts State Trooper Charged in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
22 August 2018Former Massachusetts State Trooper Indicted by Grand JuryU.S. Attorney’s Office, District of Massachusetts
6 September 2018Massachusetts State Trooper Indicted in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
14 September 2018Massachusetts State Trooper Pleads Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
19 September 2018Massachusetts State Trooper Agrees to Plead Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
12 December 2018Eighth Massachusetts State Trooper ArrestedU.S. Attorney’s Office, District of Massachusetts
12 December 2018Massachusetts State Trooper Pleads Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
11 October 2018Massachusetts State Trooper Pleads Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
19 October 2018Two Massachusetts State Troopers Agree to Plead Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
29 January 2019Former Massachusetts State Trooper Pleads Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
29 January 2019Retired Massachusetts State Trooper Pleads Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
13 February 2019Massachusetts State Trooper Agrees to Plead Guilty in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
25 March 2019Massachusetts State Trooper Sentenced for Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
10 May 2019Former Massachusetts State Trooper Sentenced For Overtime AbuseU.S. Attorney’s Office, District of Massachusetts
4 June 2019Two Massachusetts State Troopers Sentenced in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts
20 June 2019Former Massachusetts State Trooper Sentenced in Overtime Abuse InvestigationU.S. Attorney’s Office, District of Massachusetts/td>
18 July 2023Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Highway Project; Madison to Wisconsin Dells, Wisconsin
FHWA, in coordination with the Wisconsin Department of Transportation, is issuing this Notice of Intent to solicit comment and advise the public, agencies, and stakeholders that an environmental impact statement will be prepared to study potential improvements to 67 miles of Interstates 39, 90, and 94 in Dane, Columbia, Sauk, and Juneau counties.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Glenn D. Fulkerson
Topic: Interstate Highway System


Interstate 91

DateArticleAuthor/Source
20 June 2011FHWA Administrator Helps Break Ground on $356 Million I-95/I-91/Route 34 Interchange in New HavenFHWA
15 October 202018-Month Multi-Agency Operation “Fury Road” Focused on Interstate 91 Results in 82 Federal Prosecutions; Seizure of 128 firearms, 1 Kilogram of Heroin, and 1 Kilogram of Cocaine Base U.S. Attorney’s Office, District of Vermont


Interstate 93

DateArticleAuthor/Source
6 April 2005US Highway Administration releases interim report on Boston's Big Dig: press release claims tunnel safe, but report does notWikinews
26 February 2009Company Charged With Fraud and False Statements Scheme on Big Dig Contract ConvictedU.S. Attorney’s Office, District of Massachusetts
5 May 2009Fraud and False Statements Scheme Charged on Big Dig ContractU.S. Attorney’s Office, District of Massachusetts
8 May 2009Big Dig Contractor Modern Continental Enters Guilty Plea to False Statement ChargesU.S. Attorney’s Office, District of Massachusetts
20 May 2009Company Convicted of Fraud and False Statements Scheme on Big Dig ContractU.S. Attorney’s Office, District of Massachusetts
27 May 2009Company Sentenced on Big Dig Fraud and False Statements SchemeU.S. Attorney’s Office, District of Massachusetts
14 September 2009Company Sentenced in Big Dig Fraud and False Statements SchemeU.S. Attorney’s Office, District of Massachusetts
26 May 2010Two Former Managers for Big Dig Contractor SentencedU.S. Attorney’s Office, District of Massachusetts
16 July 2011FHWA Administrator Mendez Reviews Innovative Bridge ReplacementFHWA
25 May 2016U.S. Transportation Secretary Foxx Announces $200 Million Loan to Build New Lanes on New Hampshire’s Interstate 93FHWA
9 March 2020Notice of Final Federal Agency Actions on Proposed Highway in New HampshireFederal Register: FHWA (Patrick A. Bauer)


Interstate 94

Interstate 94 Sign Subject:  Interstate 94 Sign
Photographer:  Bill Crittenden
Location:  Kalamazoo, Michigan
Date:  28 September 2022
View photo of Interstate 94 Sign - 1.1MB


DateArticleAuthor/Source
1 November 2004U.S. DOT Grant to Help Fund Replacement of Marquette Interchange in MilwaukeeFHWA
26 October 2007Dan Ryan - 45MPH. Watch it!Gus Philpott, The Woodstock Advocate
22 December 2007Dan Ryan 45MPH Speed Limit - Dumb!Gus Philpott, The Woodstock Advocate
7 October 2010Federal Highway AdministrationFederal Highway Administrator Mendez in Madison to Get Update on I-94 Badger Interchange Recovery Act ProjectFederal Highway Administration
25 March 2011FHWA Administrator Mendez Helps Break Ground on I-94/I-69 Reconstruction Project in St. Clair CountyFHWA
29 April 2011Secretary LaHood Awards $6.5 Million To Ease Truck Parking Shortages in Michigan and MinnesotaFHWA
21 August 2011Demolition derby on the EdensGus Philpott, The Woodstock Advocate
28 August 2013Revised Notice of Intent To Prepare an Environmental Impact Statement: Milwaukee County, WisconsinBethaney Bacher-Gresock
30 April 2015U.S. Transportation Deputy Secretary Mendez Visits Milwaukee's I-94 North-South Freeway ProjectFHWA
24 August 2016Buy America Waiver NotificationFederal Register: FHWA (Gregory G. Nadeau)
13 January 2017Decade of Service, ACongressional Record: Rep. Tom Emmer
11 October 2017Notice of Rescission of the Record of Decision (ROD) for the I-94 East-West Corridor Project in the City of Milwaukee, Milwaukee County, WisconsinFederal Register: FHWA (Timothy C. Marshall)
10 August 2020Notice of Final Federal Agency Actions on Proposed Highway in MichiganFederal Register: FHWA (Russell L. Jorgenson)
18 July 2023Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Highway Project; Madison to Wisconsin Dells, Wisconsin
FHWA, in coordination with the Wisconsin Department of Transportation, is issuing this Notice of Intent to solicit comment and advise the public, agencies, and stakeholders that an environmental impact statement will be prepared to study potential improvements to 67 miles of Interstates 39, 90, and 94 in Dane, Columbia, Sauk, and Juneau counties.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Glenn D. Fulkerson
Topic: Interstate Highway System


Interstate 95

A first generation red Ford Mustang convertible, on a highway underneath a sign for Interstate 95 to Richmond, appears on the cover of the 2016 book The Four Loves of Alyssa: The Love Story of Renewal by Curtis Bowers.

DateArticleAuthor/Source
19 June 1998DOT PROVIDES $5 MILLION TO PENNSYLVANIA TO REPAIR I-95 SECTION CLOSED AFTER FIERY TRUCK CRASHFederal Highway Administration
29 March 2004U.S. Department of Transportation Provides $13.2 Million for Connecticut I-95 RepairsFHWA
15 April 2004U.S. Transportation Secretary Demonstrates Future of Road Building New Technologies Already Seen in Connecticut I-95 Repairs and New Wilson BridgeFHWA
20 May 2004Debris Free Hiways' Pilot Program set to begin in South Florida on July 1, 2004.Debris Free Hiways
30 September 2004Federal Highway Administrator and Nevada Governor Meet to Address Costly Delays to U.S. 95 Widening WorkFHWA
27 May 2006New toll proposal on U.S. Interstate 95 nearing passageWikinews
9 July 2008Two of Nation's Busiest Interstates Will Get $11 Million for Truck Parking InnovationsFHWA
9 December 2008U.S. Department of Transportation Signs I-95 Corridor of the Future Development Agreement to Relieve CongestionFHWA
16 January 2009U.S. Department of Transportation Signs I-95 Corridor of the Future Development Agreement with Five States to Relieve CongestionFHWA
14 May 2010Federal and State Officials Break Ground On Delaware’s Largest Recovery Act ProjectFederal Highway Administration
27 December 2010U.S. Transportation Secretary Ray LaHood Announces Signing of a $10 Million Recovery Act Grant Agreement for I-73/I-95 Interchange Access Road in South CarolinaFHWA
8 February 2011Nation's Top Highway Official Reviews New Road Project in DaytonaFHWA
13 March 2011New York tour bus crash kills 14Wikinews
20 June 2011FHWA Administrator Helps Break Ground on $356 Million I-95/I-91/Route 34 Interchange in New HavenFHWA
9 December 2011FHWA Administrator Mendez Visits Reconstruction of SR-1/I-95 InterchangeFHWA
22 June 2012Deputy Federal Highway Administrator Nadeau Joins Governor Malloy to Open First Span of Connecticut's New Pearl Harbor Memorial BridgeFHWA
8 August 2012Regulated Navigation Area--New Haven Harbor, Quinnipiac River, Mill River, New Haven, CT; Pearl Harbor Memorial Bridge (Interstate 95) ConstructionD. B. Abel
26 March 2013PBES/ABC Project Highlight: MassDOT's Fairhaven, I-95 over River Avenue Benjamin Beerman
23 January 2014Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement for Transportation Improvements on I-95 in New London County, ConnecticutAmy Jackson-Grove
21 May 2014Disturbance of Peregrine Falcon Nest Leads to Charges Against Bridge Repair CrewU.S. Attorney’s Office, Eastern District of Pennsylvania
1 August 2014Notice of Intent; Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Riverport Development and Proposed New Interchange on I-95 in Jasper County, South Carolina/td>John T. Litz
17 February 2015U.S. Transportation Secretary Foxx Visits Florida's I-95 Overland Bridge Replacement ProjectFHWA
25 March 2015FBI Announces $25,000 Reward in North Carolina Gold HeistFBI Miami
20 April 2015FBI Partially Recovers Gold Taken from a Roadside Heist in North Carolina FBI Miami
11 February 2016Charges Allege New Jersey Woman Exploited The USDOT Disadvantaged Business Program U.S. Attorney’s Office, Eastern District of Pennsylvania
2 December 2016Buy America Waiver NotificationFederal Register: FHWA (Gregory G. Nadeau)
3 April 2018Charges Allege Two Individuals And Their Companies Exploited The USDOT Disadvantaged Business ProgramU.S. Attorney’s Office, Eastern District of Pennsylvania
8 May 2018Notice of Final Federal Agency Actions on Interstate 95 in the City of Fredericksburg and the Counties of Spotsylvania, Stafford, Prince William, and Fairfax, VirginiaFederal Register: FHWA (John Simkins)
18 September 2019Safety Zone; Unionport (Bruckner Expressway) Bridge, Westchester Creek, Bronx, NYFederal Register: DHS (J.P. Tama)
6 November 2019Downingtown Man Sentenced to Nearly Six Years in Prison for Defrauding PennDOT Disadvantaged Business ProgramU.S. Attorney’s Office, Eastern District of Pennsylvania
26 February 2021Notice of Final Federal Agency Actions on Proposed Transportation Project in FloridaFederal Register: FHWA (Karen M. Brunelle)
15 November 2021Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida
These actions relate to the proposed SR-9/I-95 from south of SW 10th Street to north of Hillsboro Boulevard Project Development and Environment Study.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Karen M. Brunelle
Topic: Interstate Highway System
23 June 2023Statement From President Biden on Reopening I-95
When I visited Philadelphia on Saturday and met with local officials and union workers, I made clear: my Administration would move heaven and earth to reopen I-95 as soon as possible.
Press Release (text)
Publisher: The White House
Byline: President Joe Biden
Topic: Interstate Highway System


Interstate 101

DateArticleAuthor/Source
3 November 2021Notice of Intent To Prepare a Draft Environmental Impact Statement for the Last Chance Grade Permanent Restoration Project on Interstate 101, in Del Norte County, California
Caltrans as the assigned National Environmental Policy Act agency and CEQA lead agency, will prepare a joint EIR/EIS on a proposal for improvements along a portion of I-101 known as “Last Chance Grade” in Del Norte County.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Rodney Whitfield
Topic: Interstate Highway System


Interstate 110

DateArticleAuthor/Source
20 July 2018Notice of Statute of Limitations on Claims; Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Matt Schmitz)
7 June 2018Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Matt Schmitz)


Interstate 126

DateArticleAuthor/Source
29 May 2019Notice of Final Agency Actions on Proposed I-20/26/126 Carolina Crossroads Corridor Project in South CarolinaFederal Register: FHWA (Emily O. Lawton)


Interstate 190

DateArticleAuthor/Source
23 June 2014Notice of Final Federal Agency Actions on the New York Gateway Connections Improvement Project to the U.S. Peace Bridge Plaza, Erie County, New YorkJonathan D. McDade


Interstate 215

DateArticleAuthor/Source
14 September 2009Nation's Top Highway Official Helps Break Ground on I-215 Widening in San BernardinoFHWA
28 June 2013FHWA Celebrates Devore Interchange GroundbreakingFHWA
24 January 2014FHWA Celebrates Ribbon Cutting for San Bernardino I-215 North CorridorFHWA
20 May 2016Federal Highway Administration Cuts Ribbon on San Bernardino’s Devore InterchangeFHWA
9 February 2018Environmental Impact Statement: I-80/I-215 Parley's Interchange, Salt Lake County, UtahFederal Register: FHWA (Ivan Marrero)
8 February 2019Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
2 March 2020Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)
17 September 2020Notice of Final Federal Agency Actions on Proposed Highway in UtahFederal Register: FHWA (Ivan Marrero)


Interstate 240

DateArticleAuthor/Source
14 June 2023Notice of Final Federal Agency Actions on the I-26 Asheville Connector in North Carolina
The actions relate to the proposed improvements to upgrade the I-26 corridor in Asheville from south of the I-26/I-40/I-240 interchange through the I-240 interchange with US 19-23-74A/Patton Avenue west of the French Broad River so that I-240 can be redesignated as I-26 in Buncombe County, North Carolina.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Clarence W. Coleman
Topic: Interstate Highway System


Interstate 244

DateArticleAuthor/Source
26 October 2010Interstate-244/Inner Dispersal Loop Project Under Way Thanks to Recovery Act DollarsFederal Highway Administration
15 December 2010U.S. Transportation Secretary LaHood Announces $49.4 Million Recovery Act Grant AgreementFHWA


Interstate 264

DateArticleAuthor/Source
29 April 2010Nation's Top Highway Official Joins Kentucky Governor to Celebrate Louisville Highway ProjectsFHWA


Interstate 269

DateArticleAuthor/Source
23 June 2011Nation's Top Highway Official Helps Break Ground on Mississippi's Largest Highway ProjectFHWA


Interstate 270

DateArticleAuthor/Source
14 June 1999Federal Highway Administrator Celebrates First Anniversary of TEA-21 At Maryland I-70/I-270 Ground-BreakingFederal Highway Administration
16 March 2018Notice of Intent To Prepare Environmental Impact Statement, I-495 & I-270 Managed Lanes Study, Montgomery and Prince George's Counties, Maryland and Fairfax County, VirginiaFederal Register: FHWA (Gregory Murrill)
31 July 2019Notice To Rescind Notice of Intent To Prepare Environmental Impact Statement for the I-270/U.S. 15 Multi-Modal Corridor Study in Montgomery County and Frederick County, MarylandFederal Register: FHWA (Gregory Murrill)
16 June 2020U.S. Department of Transportation Awards $1 Million to Missouri’s I-270 Predictive Layered Operations InitiativeFHWA


Interstate 275

DateArticleAuthor/Source
23 September 2016Notice To Rescind a Notice of Intent for an Environmental Impact Statement for Proposed Highway and Light Rail Improvements in the Sr 32 Corridor Between Us 50 and Ir 275 in Hamilton and Clermont Counties, OhioFederal Register: FHWA (Robert L. Griffith)
28 September 2020Notice of Final Federal Agency Actions on Proposed Highway in FloridaFederal Register: FHWA (Karen M. Brunelle)


Interstate 279

DateArticleAuthor/Source
6 August 2009Nation's Top Highway Official Kicks Off I-279 Fort Duquesne Bridge Preservation Project in PittsburghFHWA


Interstate 280

DateArticleAuthor/Source
20 April 2007Worker dies on bridge project in Toledo, OhioWikinews


Interstate 285

DateArticleAuthor/Source
4 November 2019Notice of Intent; Environmental Impact Statement: I-285 Top End Express Lanes in Cobb, Fulton, and DeKalb Counties, GeorgiaFederal Register: FHWA (Moises Marrero)
27 November 2020Notice of Final Federal Agency Action on Proposed Highway Project in Georgia, the I-285/I-20 East Interchange Project, DeKalb County, Georgia (Atlanta Metropolitan Area)Federal Register: FHWA (Moises Marrero)


Interstate 287

DateArticleAuthor/Source
12 October 2011Environmental Impact Statement, Tappan Zee Bridge/I-287 Corridor Project (Rockland and Westchester Counties, New York)Jonathan D. McDade
12 October 2011Environmental Impact Statement, Tappan Zee Hudson River Crossing Project (Rockland and Westchester Counties, NY)Jonathan D. McDade


Interstate 355

DateArticleAuthor/Source
9 March 2016Infrasense uses GPR to Scan 26 Bridge Decks on I-355 in IllinoisInfrasense


Interstate 375

DateArticleAuthor/Source
22 March 2022Notice of Final Federal Agency Actions on Proposed Highway Project in Michigan
These final agency actions relate to a proposed highway project, I-375, from I-75 South of Mack Avenue to the Detroit Riverfront in the city of Detroit, Wayne County.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Theodore G. Burch
Topic: Interstate Highway System


Interstate 395

DateArticleAuthor/Source
28 June 2011Temporary Closure of I-395 Just South of Conway Street in the City of Baltimore to Vehicular Traffic To Accommodate the Construction and Operation of the Baltimore Grand PrixVictor M. Mendez
22 August 2011Temporary Closure of I-395 Just South of Conway Street in the City of Baltimore to Vehicular Traffic To Accommodate the Construction and Operation of the Baltimore Grand PrixVictor M. Mendez
19 October 2011Environmental Assessment for the I-395 Air Rights ProjectJoseph C. Lawson
30 August 20122012 Temporary Closure of I-395 Just South of Conway Street in the City of Baltimore to Vehicular Traffic to Accommodate the Construction and Operation of the Baltimore Grand PrixVictor M. Mendez
22 August 20132013 Temporary Closure of I-395 Just South of Conway Street in the City of Baltimore to Vehicular Traffic To Accommodate the Construction and Operation of the Baltimore Grand PrixVictor M. Mendez
30 June 2016Infrasense, Inc. uses Ground Penetrating Radar to Measure the Pavement Thickness Along a Section of I-395 Near Washington D.C.Infrasense, Inc.
5 July 2016Notice of Final Federal Agency Actions on the Proposed I-395/Route 9 Transportation Study in Brewer, Holden, Eddington, and Clifton, MaineFederal Register: FHWA (Todd D. Jorgensen)
20 June 2017Notice of Final Federal Agency Actions on the Interstate 395 Express Lanes Northern Extension Study in the City of Alexandria, Arlington County, and Fairfax County, VirginiaFederal Register: FHWA (John Simkins)


Interstate 405

DateArticleAuthor/Source
23 May 2014FHWA Celebrates Opening of I-405 Carpool Lane in Los AngelesFHWA
12 February 2015Orange County’s West County Connectors Project CompletedFHWA
14 September 2017Notice of Final Federal Agency Actions of Proposed Highway/Interchange Improvement in California; Statute of Limitations on ClaimsFederal Register: FHWA (Tashia J. Clemons)
31 October 2018Notice of Final Federal Agency Actions of Proposed Highway in CaliforniaFederal Register: FHWA (Tashia J. Clemons)
27 November 2018Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Matthew Schmitz)
30 April 2019Notice of Final Federal Agency Actions on Proposed Highway in WashingtonFederal Register: FHWA (Daniel M. Mathis)
30 April 2019Notice of Final Federal Agency Actions on Proposed Highway in WashingtonFederal Register: FHWA (Daniel M. Mathis)
26 June 2020Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)
2 July 2020Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)


Interstate 435

DateArticleAuthor/Source
9 November 2011FHWA Administrator Gets Update on I-70/I-435 Interchange Reconstruction Project in Kansas CityFHWA
29 November 2016Federal Highway Administration Opens Phase 2 of Johnson County Gateway Project in Kansas City AreaFHWA


Interstate 440

DateArticleAuthor/Source
13 July 2018Notice of Final Federal Agency Actions on Proposed Highway in North CarolinaFederal Register: FHWA (Clarence W. Coleman)


Interstate 465

DateArticleAuthor/Source
8 November 2013U.S. Transportation Secretary Foxx Approves Increased Federal Share to Upgrade the I-465/I-65 Interchange in IndianapolisFHWA


Interstate 469

DateArticleAuthor/Source
3 April 2024Georgia Man Sentenced to 180 Months in Prison
According to documents in the case, on August 3, 2021, Scott was pulled over for speeding on Interstate 469. Scott, a drug courier who transported and delivered controlled substances across the United States, was found in possession of cocaine and cocaine base along with 12.4 grams of 98% pure methamphetamine.
Press Release (text)
Publisher: U.S. Attorney's Office, Northern District of Indiana
Dateline: Fort Wayne, Indiana
Topic: Interstate Highway System


Interstate 495

DateArticleAuthor/Source
20 December 2007U.S. Department of Transportation Approves Nearly $1.2 Billion in Credit Assistance to Relieve Congestion on I-495 Capital BeltwayFHWA
13 November 2012FHWA Administrator Mendez Celebrates the Opening of 495 Express Lanes in Northern VirginiaFHWA
15 November 2012495 Express Lanes: relief for Virginia motorists, an innovative financing model for American infrastructure Fast Lane
5 June 2014U.S. Transportation Secretary Foxx Announces $2 Million in Emergency Relief Funds for Delaware’s I-495 Bridge Over Christina RiverFHWA
21 September 2016Environmental Impact Statement: Suffolk County, New YorkFederal Register: FHWA (Peter Osborn)
23 September 2016Notice of Final Federal Agency Actions on Proposed Interstate 495 (Long Island Expressway) Rest Area Upgrade Project Between Exits 51 & 52 (Eastbound) in the Town of Huntington, Suffolk County, New YorkFederal Register: FHWA (Peter Osborn)
16 March 2018Notice of Intent To Prepare Environmental Impact Statement, I-495 & I-270 Managed Lanes Study, Montgomery and Prince George's Counties, Maryland and Fairfax County, VirginiaFederal Register: FHWA (Gregory Murrill)
4 October 2021Notice of Final Federal Agency Actions on the Interstate 495 Express Lanes Northern Extension Project in Fairfax County, Virginia
The actions relate to the Interstate 495 Express Lanes Northern Extension Project from the Dulles Toll Road/Route 267 interchange to the George Washington Memorial Parkway in Fairfax County.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Thomas Nelson, Jr.
Topic: Interstate Highway System


Interstate 526

DateArticleAuthor/Source
31 March 2023Notice of Final Agency Actions on the Proposed I-526 Lowcountry Corridor West Project, Charleston County, South Carolina
The purpose of the I-526 LCC West project is to increase capacity at the I-26/I-526 interchange and along the I-526 mainline from Paul Cantrell Boulevard to Virginia Avenue.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Shundreka R. Givan
Topic: Interstate Highway System


Interstate 540

DateArticleAuthor/Source
8 January 1999Secretary Slater Joins in Dedication Of Final Segment of Arkansas’ I-540U.S. Department of Transportation


Interstate 575

DateArticleAuthor/Source
16 September 2010Supplemental Draft Environmental Impact Statement (SDEIS) for Northwest I-75/I-575 Corridor, Cobb and Cherokee Counties, GA (Atlanta Metropolitan Area)Rodney N. Barry
30 January 2015Notice of Final Federal Agency Action on the Proposed Highway in Georgia [Northwest I-75/I-575 Corridor, Cobb and Cherokee Counties, Georgia (Atlanta Metropolitan Area)]Rodney Barry


Interstate 580

DateArticleAuthor/Source
2 August 2012Federal Highway Administrator Mendez Joins Nevada Governor for Opening of I-580 Freeway Extension Project in RenoFHWA


Interstate 595

DateArticleAuthor/Source
4 March 2009USDOT Approves $603 Million Loan to Build New Express Lanes In FloridaFHWA
26 February 2010Federal Highway Administrator Mendez Breaks Ground on I-595 Express Lanes Project in Broward CountyFHWA
21 February 2013Federal Highway Deputy Administrator Visits Broward County to Review Progress on I-595 Express Lanes ProjectFHWA


Interstate 605

DateArticleAuthor/Source
12 February 2015Orange County’s West County Connectors Project CompletedFHWA


Interstate 635

DateArticleAuthor/Source
23 March 2009U.S. Department of Transportation Gives Go-Ahead to Build New Toll Lanes to Relieve Congestion on Two North Texas HighwaysFHWA
22 June 2010USDOT Approves $1.465 Billion in Funds for the LBJ Freeway in DallasFederal Highway Administration
10 September 2015Federal Highway Administrator Helps Open LBJ Express ProjectFHWA


Interstate 664

DateArticleAuthor/Source
18 February 2022Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Highway Project; Cities of Chesapeake and Suffolk, Virginia
FHWA, in coordination with the Virginia Department of Transportation, is issuing this notice of intent to solicit comment and advise the public, agencies, and stakeholders that an Environmental Impact Statement will be prepared to study potential improvements to seven miles of Interstate 664 (I-664) and the Bowers Hill Interchange area.
Federal Register Notice (text)
Agency: Federal Highway Administration
Byline: Thomas L. Nelson, Jr.
Topic: Interstate Highway System


Interstate 680

DateArticleAuthor/Source
2 November 2011Federal Highway Administrator Joins State and Local Officials in Council Bluffs for Early Reopening of I-680FHWA
14 July 2015Honoring Tim Watson of FremontCongressman Eric Swalwell
2 August 2018Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Tashia Clemons)
23 December 2020Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaFederal Register: FHWA (Rodney Whitfield)


Interstate 695

DateArticleAuthor/Source
14 May 2010Nation’s Top Highway Official Breaks Ground on $22 Million Bridge Replacement near BaltimoreFederal Highway Administration


Interstate 710

710 Freeway Coalition

DateArticleAuthor/Source
3 June 2004710 Freeway Poll Reveals 6-1 In Favor. 710 Freeway Coalition to Announce Results of Most Extensive Polling710 Freeway Coalition
8 January 2013FHWA Administrator Victor Mendez Participates in Gerald Desmond Bridge Replacement GroundbreakingFHWA
21 May 2014U.S. Transportation Secretary Foxx Announces $325 Million Loan for Southern California’s Gerald Desmond Bridge ReplacementFHWA


Interstate 759

DateArticleAuthor/Source
29 August 2018Rescinding the Notice of Intent for an Environmental Impact Statement; Gadsden, Etowah County, AlabamaFederal Register: FHWA (Mark Bartlett)


Interstate 805

Name:  Jacob Dekema Freeway

Located in southern California.

DateArticleAuthor/Source
30 September 2010U.S. Transportation Secretary LaHood Announces $20.2 Million Recovery Grant for Interchange Near Otay MesaFederal Highway Administration
5 April 2011FHWA Administrator Mendez Helps Break Ground on $17.9 Million SR 905/I-805 Interchange Near San DiegoFHWA
14 July 2011Notice of Final Federal Agency Actions on Proposed Highway in CaliforniaMaiser Khaled


Interstate 880

DateArticleAuthor/Source
29 April 2007Tanker truck fire causes collapse on Oakland FreewayWikinews


Interstate 895

DateArticleAuthor/Source
11 April 2018Addition to the National NetworkFederal Register: FHWA (Brandye L. Hendrickson)
28 June 2018Addition to the National NetworkFederal Register: FHWA (Brandye L. Hendrickson)


Interstate IH-3

DateArticleAuthor/Source
3 March 2020Notice of Intent To Repatriate Cultural Items: State of Hawaii Department of Transportation, Honolulu, HIFederal Register: DoI (Melanie O'Brien)





The Crittenden Automotive Library